Colt Mumbai 1 and 2 Data Centres
- Planned critical IT
- 134 MW
- Updated
- Oct 28, 2026
Colt Mumbai 1 and 2 are operating phases within a larger Navi Mumbai development. The two current facilities total 22 MW, while 134 MW is the longer-term campus ceiling; the broader $1.3 billion India program is not booked as project financing. Tenant utilization, contract pricing and undisclosed project financing remain outside the verified public record.
Capacity
Operating IT capacity: Not established in published records
A missing figure does not mean zero. Planned, utility and generation figures are not operating IT capacity.
Development
Colt Mumbai 1 and 2 are operating phases within a larger Navi Mumbai development. The two current facilities total 22 MW, while 134 MW is the longer-term campus ceiling; the broader $1.3 billion India program is not booked as project financing. Tenant utilization, contract pricing and undisclosed project financing remain outside the verified public record.
Milestones (1)
Sep 18, 2023 · Recorded actual event
Completed · Financing
Source not linkedParticipants
Developer
Sources by role
Developer (1)
- Colt Mumbai 1 and 2 Data Centres official profile · Aug 28, 2026 · Primary
Capital & incentives
Capital claims
Site & development
Additional project facts
Capacity basis
ActualColt publishes 22 MW for the two current facilities and up to 134 MW for the larger campus development; Cartis displays the 134 MW full build boundary.
SourceCapacity basis
Actual134 MW is the full build Mumbai campus potential; the currently delivered Mumbai 1 and 2 facilities total 22 MW.
SourceCapacity basis
Actual134 MW is the full build Mumbai campus potential; the currently delivered Mumbai 1 and 2 facilities total 22 MW.
SourceIdentity boundary
ActualThis facility or named campus is tracked separately from adjacent buildings and broader operator portfolios
SourceInfrastructure & permits
Technical details (3)
Operational
134 MW
134 MW is the full-build Mumbai campus potential; the currently delivered Mumbai 1 and 2 facilities total 22 MW.
Operational
Carrier-neutral or resilient fibre connectivity is described for the individual facility.
Operational
Cooling architecture supports the stated lifecycle; actual tenant draw and instantaneous load remain undisclosed.
Project map
Public-source research. Plans may change. See Evidence for sources and qualifications.
Related projects (4)
Proposed · Navi Mumbai, Maharashtra, India
Same locality: Navi Mumbai
Compare in a collectionOperating · Navi Mumbai, Maharashtra, India
Same locality: Navi Mumbai
Compare in a collectionOperating · Navi Mumbai, Maharashtra, India
Same locality: Navi Mumbai
Compare in a collectionPartially operational · Navi Mumbai, Maharashtra, India
Same locality: Navi Mumbai
Compare in a collection