Cartis diligence evidence schedule
Monarch Data Center Campus
PRJ-1133 · Site · Yerington, Nevada, United States
Record last updated Oct 28, 2026
Scope and capacity
Copia Power’s Monarch project in Lyon County, Nevada is a planned integrated power-and-data-center campus. Copia describes a 1,000 MW data-center envelope with 200 MW of solar, 500 MW of storage and 500 MW of thermal capacity; local planning materials show a multi-building campus still moving through land-use review.
Headline: 1,000 MW Planned / design
Numbers refer to their stated physical boundaries and are not added together. Source dates, claim dates and record updates have different meanings. Missing dates and locators are not inferred.
Claims and exhibit sources
Jump to a claim (5)
Location context · Monarch Data Center Campus | Yerington | Nevada | US
Actual · Monarch Data Center Campus (Project)
Claim 71854 · Recorded claim type: Actual · Review: Approved · Claim date: Not stated
- Monarch Data Center Campus public-record research record
US Data Center Map · Document date: Aug 28, 2026 · Primary
Source reference: SRC-4116 · News report · Recorded authority: Secondary
Source URL
https://dcmap.us/states/nevada/
https://dcmap.us/states/nevada/
Lifecycle status · Proposed
Actual · Monarch Data Center Campus (Project)
Claim 71855 · Recorded claim type: Actual · Review: Approved · Claim date: Not stated
- Monarch Data Center Campus public-record research record
US Data Center Map · Document date: Aug 28, 2026 · Primary
Source reference: SRC-4116 · News report · Recorded authority: Secondary
Source URL
https://dcmap.us/states/nevada/
https://dcmap.us/states/nevada/
Reported capacity · 1,000 MW
Planned / design or future potential · Monarch Data Center Campus (Project)
Claim 71856 · Recorded claim type: Design · Review: Approved · Claim date: Not stated
Headline treatment: Selected headline
- Monarch Data Center Campus public-record research record
US Data Center Map · Document date: Aug 28, 2026 · Primary
Source reference: SRC-4116 · News report · Recorded authority: Secondary
Source URL
https://dcmap.us/states/nevada/
https://dcmap.us/states/nevada/
Capacity basis · 1,000 MW future full build site capacity; not measured operating IT load.
Actual · Monarch Data Center Campus (Project)
Claim 71857 · Recorded claim type: Actual · Review: Approved · Claim date: Not stated
- Monarch Data Center Campus public-record research record
US Data Center Map · Document date: Aug 28, 2026 · Primary
Source reference: SRC-4116 · News report · Recorded authority: Secondary
Source URL
https://dcmap.us/states/nevada/
https://dcmap.us/states/nevada/
Solar capacity · 200 MW
Design · Monarch Data Center Campus (Project)
Claim 77720 · Recorded claim type: Design · Review: Approved · Claim date: Not stated
- Monarch project
Copia Power · Document date: Aug 28, 2026 · Primary
Source reference: SRC-4413 · Company announcement · Recorded authority: Party primary
Source URL
https://www.copiapower.com/interactive-map-collection/ru9ht9lachmjgoqnn73bq8grhyfjei-mhprk-gd4f3-yf9ax-93my9-9ftc2-rf7hh-jg6rr-224sc-t23mt-h5xp6-zw5cj-a9x2y-6c978-tthy2-7a46w-ejjen-ln25x-2jarn-e98nn-7yg8p
https://www.copiapower.com/interactive-map-collection/ru9ht9lachmjgoqnn73bq8grhyfjei-mhprk-gd4f3-yf9ax-93my9-9ftc2-rf7hh-jg6rr-224sc-t23mt-h5xp6-zw5cj-a9x2y-6c978-tthy2-7a46w-ejjen-ln25x-2jarn-e98nn-7yg8p
Counterparties and capital
Copia Power · Developer · CMP-1523
This schedule captures public Cartis research. It is not a title, lien or legal-opinion report. Document page/section locators and claim review timestamps are included only when published; this version has no separate locator or claim-review-time feed.