Meta Sturgeon County Data Center

Sturgeon County, Alberta, CanadaPreconstruction
Capacity
1,000 MW
Planned / design
Lead participant
Meta Platforms, Inc.
Developer
Last updated
Aug 28, 2026
Most recent public record update

About Meta Sturgeon County Data Center

Meta announced a 1 GW data center in Sturgeon County, Alberta, with more than CA$13 billion of planned investment. The project is expected to peak near 3,000 construction workers, support more than 300 operating jobs, use closed-loop liquid cooling with dry cooling, and fund new generation and grid infrastructure.

Projects sharing a market, utility, or organization.

1 related

Capacity

Planned / design
Operating capacityAn operating IT-capacity figure has not been publicly disclosed.
Future Potential1,000 MWDesign · Meta Sturgeon County Data Center

Development

1 phases · 1 milestones
Construction announced and infrastructure deliveryUnder Construction

Meta announced a 1 GW data center in Sturgeon County, Alberta, with more than CA$13 billion of planned investment. The project is expected to peak near 3,000 construction workers, support more than 300 operating jobs, use closed-loop liquid cooling with dry cooling, and fund new generation and grid infrastructure.

Jul 8, 2026
Meta announced the Sturgeon County data center
Completed

Infrastructure

Electric GridUnder Construction

1,000 MW

Meta is funding new generation and grid infrastructure.

Cooling SystemPlanned Or Represented

Closed-loop liquid cooling with dry cooling and no operational cooling-water use.

Project map

0 of 1 project point mapped
Infrastructure facts
2
Mapped records
1
Capacity figures
1

No map point available

Power & interconnection: 1Cooling & water: 1

Facts & sources

Published claims and their source links.

8 facts
Location Context
Meta Sturgeon County Data Center | Sturgeon County | Alberta | CA
Actual
Lifecycle Status
Preconstruction
Actual
Reported Capacity
1,000 MW
Design
Capacity Basis
1,000 MW future full build site capacity; not measured operating IT load.
Actual
Reported Investment
CA$13,000,000,000
Reported Rounded
Construction Jobs Peak
3,000 jobs
Reported Rounded
Permanent Jobs
300 jobs
Reported Rounded
Cooling System
Closed loop liquid cooling with dry cooling