Meta announced a 1 GW data center in Sturgeon County, Alberta, with more than CA$13 billion of planned investment. The project is expected to peak near 3,000 construction workers, support more than 300 operating jobs, use closed-loop liquid cooling with dry cooling, and fund new generation and grid infrastructure.

Capacity

Reported capacity

Planned / design or future potential

1,000 MW

Source

Operating IT capacity: Not established in published records

A missing figure does not mean zero. Planned, utility and generation figures are not operating IT capacity.

Development

Construction announced and infrastructure deliveryUnder construction

Meta announced a 1 GW data center in Sturgeon County, Alberta, with more than CA$13 billion of planned investment. The project is expected to peak near 3,000 construction workers, support more than 300 operating jobs, use closed-loop liquid cooling with dry cooling, and fund new generation and grid infrastructure.

Milestones (1)
Meta announced the Sturgeon County data center

Jul 8, 2026 · Recorded actual event

Completed · Announced

Source not linked

Participants

Meta Platforms, Inc.

Developer

Sources by role
Developer (1)

Capital & incentives

Capital claims

Reported investment

Reported rounded

CA$13,000,000,000

Source

Site & development

Location context

Actual

Meta Sturgeon County Data Center | Sturgeon County | Alberta | CA

Source

Construction jobs peak

Reported rounded

3,000 jobs

Source

Technical specifications

Cooling system

Actual

Closed loop liquid cooling with dry cooling

Source

Additional project facts

Lifecycle status

Actual

Preconstruction

Source

Capacity basis

Actual

1,000 MW future full build site capacity; not measured operating IT load.

Source

Permanent jobs

Reported rounded

300 jobs

Source

Infrastructure & permits

Technical details (2)
Electric grid

Under construction

1,000 MW

Meta is funding new generation and grid infrastructure.

Cooling system

Planned or represented

Closed-loop liquid cooling with dry cooling and no operational cooling-water use.

Public-source research. Plans may change. See Evidence for sources and qualifications.

Related projects (1)
Meta Sturgeon County Data Centre

Under construction limited scope · Sturgeon County, Alberta, Canada

Same locality: Sturgeon County

Compare in a collection