Cartis diligence evidence schedule

Lefdal Mine Data Center

PRJ-0558 · Site · Lefdal near Måløy, Nordfjord, Vestland, Norway

Captured 2026-09-06T04:12:17.680Z · Record last updated 2026-08-26

SHA-256: deccad9922786e1a69bf050c4e93b6e58d74d0942f60ecd03cf2556f771a0edf

Save a diligence baseline

Download the public evidence as it appears now. Compare a previously saved snapshot to see added, removed and changed claims, counterparties, financing and milestones. Files are read in this browser and are not uploaded.

The fingerprint detects file changes; it is not a digital signature or a claim of independently verified authenticity. Keep your downloaded copy with the transaction file.

Scope and capacity

Lefdal Mine Data Center operates inside a former mine near Måløy and is expanding data halls across a six-level, 75-chamber campus. The site reports 10 MW in operation, 20 MW reserved for customers, 80 MW available power and up to 200 MW potential, alongside fjord-water cooling and renewable electricity.

Headline: 90 MW Planned critical IT

Numbers refer to their stated physical boundaries and are not added together. Source dates, claim dates and record updates have different meanings. Missing dates and locators are not inferred.

Claims and exhibit sources

Operational Since · 2017

actual · Lefdal Mine Data Center (project)

Claim 50601 · Review: Approved · Claim date: 2020-10-20T00:00:00+00:00

  1. A sustainable perspective on digital infrastructure

    Columbia Threadneedle Investments · Document date: 2020-10-20 · Primary

    https://www.columbiathreadneedle.com/de/at/institutional/insights/sustainable-infrastructure-a-sustainable-perspective-on-digital-infrastructure/

Facility Form · Data center inside a former mine near Måløy on Norway's west coast

actual · Lefdal Mine Data Center (project)

Claim 50602 · Review: Approved · Claim date: Not published

  1. A sustainable perspective on digital infrastructure

    Columbia Threadneedle Investments · Document date: 2020-10-20 · Corroborating

    https://www.columbiathreadneedle.com/de/at/institutional/insights/sustainable-infrastructure-a-sustainable-perspective-on-digital-infrastructure/
  2. Our Facility

    Lefdal Mine Data Centers · Document date: Not published · Primary

    https://www.lefdalmine.com/data-center/our-facility

Mine Levels · 6 levels

design · Lefdal Mine Data Center (project)

Claim 50603 · Review: Approved · Claim date: Not published

  1. Our Facility

    Lefdal Mine Data Centers · Document date: Not published · Primary

    https://www.lefdalmine.com/data-center/our-facility

Mine Chambers · 75 chambers

design · Lefdal Mine Data Center (project)

Claim 50604 · Review: Approved · Claim date: Not published

  1. Our Facility

    Lefdal Mine Data Centers · Document date: Not published · Primary

    https://www.lefdalmine.com/data-center/our-facility

White Space Potential · 120,000 square meters up to

Planned / design or future potential · Full mine potential (phase)

Claim 50605 · Review: Approved · Claim date: Not published

  1. Our Facility

    Lefdal Mine Data Centers · Document date: Not published · Primary

    https://www.lefdalmine.com/data-center/our-facility

Power Potential · 200 MW up to

Planned / design or future potential · Full mine potential (phase)

Claim 50606 · Review: Approved · Claim date: Not published

Headline treatment: Phase scope; not a whole-site figure

  1. Our Facility

    Lefdal Mine Data Centers · Document date: Not published · Primary

    https://www.lefdalmine.com/data-center/our-facility
  2. Lefdal Mine Data Centers expand power capacity with 60 MW

    Lefdal Mine Data Centers · Document date: Not published · Corroborating

    https://www.lefdalmine.com/news/lefdal-mine-datacenter-expand-power-capacity-with-60-mw

Level 3 Capacity · 80 MW

Planned / design or future potential · Lefdal Mine Data Center (project)

Claim 50607 · Review: Approved · Claim date: Not published

Headline treatment: Separate claim, not added to the headline

  1. Our Facility

    Lefdal Mine Data Centers · Document date: Not published · Primary

    https://www.lefdalmine.com/data-center/our-facility

Operating It Capacity · 10 MW in operation

actual · Lefdal Mine Data Center (project)

Claim 50608 · Review: Approved · Claim date: Not published

Headline treatment: Separate claim, not added to the headline

  1. High Performance Computing

    Lefdal Mine Data Centers · Document date: Not published · Primary

    https://www.lefdalmine.com/services/hpc/high-performance-computing

Reserved Customer Power · 20 MW

actual · Lefdal Mine Data Center (project)

Claim 50609 · Review: Approved · Claim date: Not published

  1. Lefdal Mine Data Centers expand power capacity with 60 MW

    Lefdal Mine Data Centers · Document date: Not published · Primary

    https://www.lefdalmine.com/news/lefdal-mine-datacenter-expand-power-capacity-with-60-mw

Available Power · 80 MW

actual · Lefdal Mine Data Center (project)

Claim 50610 · Review: Approved · Claim date: Not published

Headline treatment: Separate claim, not added to the headline

  1. Lefdal Mine Data Centers expand power capacity with 60 MW

    Lefdal Mine Data Centers · Document date: Not published · Primary

    https://www.lefdalmine.com/news/lefdal-mine-datacenter-expand-power-capacity-with-60-mw

Added Power Capacity · 60 MW

actual · 80 MW available-power expansion (phase)

Claim 50611 · Review: Approved · Claim date: Not published

Headline treatment: Phase scope; not a whole-site figure

  1. Lefdal Mine Data Centers expand power capacity with 60 MW

    Lefdal Mine Data Centers · Document date: Not published · Primary

    https://www.lefdalmine.com/news/lefdal-mine-datacenter-expand-power-capacity-with-60-mw

Grid Voltage · 132 kV

actual · Lefdal Mine Data Center (project)

Claim 50612 · Review: Approved · Claim date: Not published

  1. Lefdal Mine Data Centers expand power capacity with 60 MW

    Lefdal Mine Data Centers · Document date: Not published · Primary

    https://www.lefdalmine.com/news/lefdal-mine-datacenter-expand-power-capacity-with-60-mw

Reinforced Last Mile Capacity · 200 MW

forecast · Lefdal Mine Data Center (project)

Claim 50613 · Review: Approved · Claim date: Not published

Headline treatment: Separate claim, not added to the headline

  1. Lefdal Mine Data Centers expand power capacity with 60 MW

    Lefdal Mine Data Centers · Document date: Not published · Primary

    https://www.lefdalmine.com/news/lefdal-mine-datacenter-expand-power-capacity-with-60-mw

Installed Cooling Capacity · 90 MW cooling

actual · Lefdal Mine Data Center (project)

Claim 50614 · Review: Approved · Claim date: Not published

Headline treatment: Selected headline

  1. Cooling

    Lefdal Mine Data Centers · Document date: Not published · Primary

    https://www.lefdalmine.com/data-center/cooling

Heat Exchangers · 12 modules

design · Lefdal Mine Data Center (project)

Claim 50615 · Review: Approved · Claim date: Not published

  1. Cooling

    Lefdal Mine Data Centers · Document date: Not published · Primary

    https://www.lefdalmine.com/data-center/cooling

Heat Exchanger Module Capacity · 7.5 MW cooling each

Planned / design or future potential · Lefdal Mine Data Center (project)

Claim 50616 · Review: Approved · Claim date: Not published

Headline treatment: Separate claim, not added to the headline

  1. Cooling

    Lefdal Mine Data Centers · Document date: Not published · Primary

    https://www.lefdalmine.com/data-center/cooling

Future Cooling Capacity · 200 MW redundant cooling

Planned / design or future potential · Full mine potential (phase)

Claim 50617 · Review: Approved · Claim date: Not published

Headline treatment: Phase scope; not a whole-site figure

  1. Cooling

    Lefdal Mine Data Centers · Document date: Not published · Primary

    https://www.lefdalmine.com/data-center/cooling

Seawater Temperature · 8 degrees C

design · Lefdal Mine Data Center (project)

Claim 50618 · Review: Approved · Claim date: Not published

  1. Cooling

    Lefdal Mine Data Centers · Document date: Not published · Primary

    https://www.lefdalmine.com/data-center/cooling

Seawater Intake Depth · 100 meters

design · Lefdal Mine Data Center (project)

Claim 50619 · Review: Approved · Claim date: Not published

  1. Cooling

    Lefdal Mine Data Centers · Document date: Not published · Primary

    https://www.lefdalmine.com/data-center/cooling

Pue Lower Bound · 1.08 PUE

reported rounded · Lefdal Mine Data Center (project)

Claim 50620 · Review: Approved · Claim date: Not published

  1. Cooling

    Lefdal Mine Data Centers · Document date: Not published · Primary

    https://www.lefdalmine.com/data-center/cooling

Pue Upper Bound · 1.15 PUE

reported rounded · Lefdal Mine Data Center (project)

Claim 50621 · Review: Approved · Claim date: Not published

  1. Cooling

    Lefdal Mine Data Centers · Document date: Not published · Primary

    https://www.lefdalmine.com/data-center/cooling
  2. High Performance Computing

    Lefdal Mine Data Centers · Document date: Not published · Corroborating

    https://www.lefdalmine.com/services/hpc/high-performance-computing

Wue · 0 WUE

actual · Lefdal Mine Data Center (project)

Claim 50622 · Review: Approved · Claim date: Not published

  1. Cooling

    Lefdal Mine Data Centers · Document date: Not published · Primary

    https://www.lefdalmine.com/data-center/cooling

Local Power Source · 100% Local power production described as renewable

actual · Lefdal Mine Data Center (project)

Claim 50623 · Review: Approved · Claim date: Not published

  1. Our Facility

    Lefdal Mine Data Centers · Document date: Not published · Primary

    https://www.lefdalmine.com/data-center/our-facility

Ct Esif Shareholding · 66.67 percent

actual · Lefdal Mine Data Center (project)

Claim 50624 · Review: Approved · Claim date: Not published

  1. Ownership

    Lefdal Mine Data Centers · Document date: Not published · Primary

    https://www.lefdalmine.com/about/ownership

Other Main Shareholder · Professor Friedhelm Loh

actual · Lefdal Mine Data Center (project)

Claim 50625 · Review: Approved · Claim date: Not published

  1. Ownership

    Lefdal Mine Data Centers · Document date: Not published · Primary

    https://www.lefdalmine.com/about/ownership

Typical Hall Floor Area · 700 square meters approx

reported rounded · Continuous customer-hall buildout (phase)

Claim 50626 · Review: Approved · Claim date: 2024-11-05T00:00:00+00:00

  1. Lefdal Mine Data Centers create regional development

    Lefdal Mine Data Centers · Document date: 2024-11-05 · Primary

    https://www.lefdalmine.com/news/lefdal-mine-data-centers-create-regional-development

Typical Hall Investment · NOK 250–300 million

reported rounded · Continuous customer-hall buildout (phase)

Claim 50627 · Review: Approved · Claim date: 2024-11-05T00:00:00+00:00

  1. Lefdal Mine Data Centers create regional development

    Lefdal Mine Data Centers · Document date: 2024-11-05 · Primary

    https://www.lefdalmine.com/news/lefdal-mine-data-centers-create-regional-development

Development Horizon · 7–10 Years from November 2024

forecast · Continuous customer-hall buildout (phase)

Claim 50628 · Review: Approved · Claim date: 2024-11-05T00:00:00+00:00

  1. Lefdal Mine Data Centers create regional development

    Lefdal Mine Data Centers · Document date: 2024-11-05 · Primary

    https://www.lefdalmine.com/news/lefdal-mine-data-centers-create-regional-development

Customer Deployment · BNP Paribas selected Lefdal for HPC capacity needs

actual · Lefdal Mine Data Center (project)

Claim 50629 · Review: Approved · Claim date: 2025-10-13T00:00:00+00:00

  1. BNP Paribas has selected Lefdal Mine Data Centers to host their HPC capacity needs

    Lefdal Mine Data Centers · Document date: 2025-10-13 · Primary

    https://www.lefdalmine.com/news/bnp-paribas-has-selected-lefdal-mine-data-centers-to-host-their-hpc-capacity-needs

Customer Deployment · Mercedes/Daimler HPC workloads moved through Infosys Green Data Center as a Service

actual · Lefdal Mine Data Center (project)

Claim 50630 · Review: Approved · Claim date: 2021-11-30T00:00:00+00:00

  1. Daimler is through Infosys moving their HPC cluster to Lefdal Mine Data Centers

    Lefdal Mine Data Centers / Infosys · Document date: 2021-11-30 · Primary

    https://www.lefdalmine.com/news/daimler-is-through-infosys-moving-their-hpc-cluster-to-lefdal-mine-datacenter

Customer Deployment · Sigma2 NIRD research data storage

actual · Lefdal Mine Data Center (project)

Claim 50631 · Review: Approved · Claim date: Not published

  1. Welcome Sigma2 and NIRD

    Lefdal Mine Data Centers · Document date: Not published · Primary

    https://www.lefdalmine.com/news/welcome-sigma2-and-nird

Nird Storage Capacity · 32 PB

actual · Lefdal Mine Data Center (project)

Claim 50632 · Review: Approved · Claim date: Not published

  1. Welcome Sigma2 and NIRD

    Lefdal Mine Data Centers · Document date: Not published · Primary

    https://www.lefdalmine.com/news/welcome-sigma2-and-nird

Nird Storage Expandability · 70 PB up to

forecast · Lefdal Mine Data Center (project)

Claim 50633 · Review: Approved · Claim date: Not published

  1. Welcome Sigma2 and NIRD

    Lefdal Mine Data Centers · Document date: Not published · Primary

    https://www.lefdalmine.com/news/welcome-sigma2-and-nird

Counterparties and capital

BNP Paribas · Customer · CMP-1027

Columbia Threadneedle European Sustainable Infrastructure Fund · Investor · CMP-1284

IBM · Supplier · CMP-1290

Infosys · Supplier · CMP-1286

Lefdal Mine Data Centers · Operator · CMP-1283

Mercedes-Benz Group / Daimler · Customer · CMP-1287

Move AS · Supplier · CMP-1291

Professor Friedhelm Loh · Investor · CMP-1285

Rittal · Supplier · CMP-1289

Sigma2 · Customer · CMP-1288

Investment Commitment

NOK 250,000,000 · 2024-11-05

Operator reports each typical customer hall involves about NOK 250–300 million. This lower-bound record is construction-cost context, not a financing close or amount for every hall.

Lefdal Mine Data Centers (Other)

Financing record 147; claim-specific source links appear in the exhibit sources where published.

Investment Commitment

NOK 300,000,000 · 2024-11-05

Upper bound of the same typical-hall investment range; no hall count or funding instrument is inferred.

Lefdal Mine Data Centers (Other)

Financing record 148; claim-specific source links appear in the exhibit sources where published.

This schedule captures public Cartis research. It is not a title, lien or legal-opinion report. Document page/section locators and claim review timestamps are included only when published; this version has no separate locator or claim-review-time feed. Downloaded snapshots are retained by you; Cartis does not archive them automatically.