Skip to content
All records
Data center siteSite record

Khazna-Eni Ferrera Erbognone AI Campus

Ferrera Erbognone, Lombardy, ItalyPreconstruction
Capacity
500 MW
Planned / design
Lead participant
Khazna Data Centers
Developer · Operator
Last updated
Aug 25, 2026
Most recent public record update

About Khazna-Eni Ferrera Erbognone AI Campus

Ferrera Erbognone is a proposed 500 MW AI/HPC campus split into an 80 MW Silver DC and up-to-420 MW Blue DC. Khazna-Eni Ferrera Erbognone AI Campus is located in Ferrera Erbognone, Lombardy, IT and is a data center campus in preconstruction status. Participants include Khazna Data Centers as developer, Khazna Data Centers as operator. Published specifications include 500 MW of planned capacity. Development comprises Phase 1 Silver DC (preconstruction), Phase 2 Blue DC (preconstruction). Key milestones include Proposed 500 MW campus JV terms signed (2025-07-11) and Eni publishes Silver/Blue phase structure (2026-03-19). grid redundancy: Eni presentation describes redundant national-grid connection; exact agreement undisclosed. power supply: 500 MW IT campus planned to receive blue power; electrical generation requirement is not disclosed.

Program relationships

1 linked

Projects sharing a market, utility, or organization.

1 related

Capacity

Planned / design
Operating capacityAn operating IT-capacity figure has not been publicly disclosed.
Future Potential500 MWActual · Khazna-Eni Ferrera Erbognone AI Campus

Development

2 phases · 2 milestones
Phase 1 Silver DCAnnounced Or Preconstruction

Latest Eni phase label.

Phase 2 Blue DCAnnounced Or Preconstruction

Latest Eni phase label.

Jul 11, 2025
Proposed 500 MW campus JV terms signed
Completed
Mar 19, 2026
Eni publishes Silver/Blue phase structure
Completed

Infrastructure

Electric GridPlanned Or Represented

Eni presentation describes redundant national-grid connection; exact agreement undisclosed.

Electric GridPlanned Or Represented

500 MW IT campus planned to receive blue power; electrical generation requirement is not disclosed.

Project map

0 of 1 project point mapped
Infrastructure facts
2
Mapped records
1
Capacity figures
0

No map point available

Power & interconnection: 2

Facts & sources

Published claims and their source links.

5 facts
Planned Total It Capacity
500 MW
Actual
Heads Of Terms Signed
True
Actual
Development Activities Underway
True
Actual
High Density Ai Hpc Design
True
Actual
Khazna Main Design Development Partner
True
Actual