Eni Ferrera Erbognone Blue Power Project
Preconstruction · Ferrera Erbognone, Lombardy, Italy
Ferrera Erbognone is a proposed 500 MW AI/HPC campus split into an 80 MW Silver DC and up-to-420 MW Blue DC. Khazna-Eni Ferrera Erbognone AI Campus is located in Ferrera Erbognone, Lombardy, IT and is a data center campus in preconstruction status. Participants include Khazna Data Centers as developer, Khazna Data Centers as operator. Published specifications include 500 MW of planned capacity. Development comprises Phase 1 Silver DC (preconstruction), Phase 2 Blue DC (preconstruction). Key milestones include Proposed 500 MW campus JV terms signed (2025-07-11) and Eni publishes Silver/Blue phase structure (2026-03-19). grid redundancy: Eni presentation describes redundant national-grid connection; exact agreement undisclosed. power supply: 500 MW IT campus planned to receive blue power; electrical generation requirement is not disclosed.
Projects sharing a market, utility, or organization.
Preconstruction · Ferrera Erbognone, Lombardy, Italy
Latest Eni phase label.
Latest Eni phase label.
Eni presentation describes redundant national-grid connection; exact agreement undisclosed.
500 MW IT campus planned to receive blue power; electrical generation requirement is not disclosed.
No map point available
Published claims and their source links.