Khazna-Eni Ferrera Erbognone AI Campus
Preconstruction · Ferrera Erbognone, Lombardy, Italy
Eni's proposed blue-power system would pair high-efficiency gas generation and carbon capture with the Ferrera campus. Eni Ferrera Erbognone Blue Power Project is located in Ferrera Erbognone, Lombardy, IT and is a generation site in preconstruction status. Participants include Eni S.p.A. as developer, Enipower as operator. Development comprises New/replacement CCGT with capture (preconstruction), Ravenna CCS dependency (preconstruction). gas fired generation: New/replacement high-efficiency CCGT with capture; capacity and permits undisclosed. carbon capture and storage: CO2 capture at generation site with planned storage via Ravenna CCS.
Projects sharing a market, utility, or organization.
Preconstruction · Ferrera Erbognone, Lombardy, Italy
No additional capacity claims are published.
Final plant and capacity undisclosed.
No site-specific service agreement disclosed.
New/replacement high-efficiency CCGT with capture; capacity and permits undisclosed.
CO2 capture at generation site with planned storage via Ravenna CCS.
No map point available
Published claims and their source links.