Cartis diligence evidence schedule
Kasi Lekki Data Center Campus
PRJ-0385 · Site · Maiyegun, Lekki, LA, Nigeria
Captured 2026-09-06T04:13:12.574Z · Record last updated 2026-08-25
SHA-256: 4194f867457678b0d0262422883d239056d4df41469712ac50eb2d89358b207d
Save a diligence baseline
Download the public evidence as it appears now. Compare a previously saved snapshot to see added, removed and changed claims, counterparties, financing and milestones. Files are read in this browser and are not uploaded.
The fingerprint detects file changes; it is not a digital signature or a claim of independently verified authenticity. Keep your downloaded copy with the transaction file.
Scope and capacity
Kasi is developing a carrier-neutral, AI-ready campus in Maiyegun, Lekki. Its first facility has reached commissioning, while the campus's 100 MW figure remains a long-term buildout envelope. Kasi Lekki Data Center Campus is located in Maiyegun, Lekki, LA, NG and is a data center campus in construction status.
Headline: 100 MW Planned / design
Numbers refer to their stated physical boundaries and are not added together. Source dates, claim dates and record updates have different meanings. Missing dates and locators are not inferred.
Claims and exhibit sources
Site Area Approximately · 4 hectares
actual · Kasi Lekki Data Center Campus (project)
Claim 35567 · Review: Approved · Claim date: Not published
- Kasi Cloud commissions hyperscale-ready AI-capable campus in Lagos
Nigeria Sovereign Investment Authority · Document date: 2026-05-19 · Corroborating
https://nsia.com.ng/kasi-cloud-datacenters-commissions-west-africas-first-hyperscaleready-ai-capable-data-centre-campus-in-lagos/ - Kasi Cloud breaks ground in Lagos on new hyperscale data center
Nigeria Sovereign Investment Authority · Document date: 2022-04-19 · Primary
https://nsia.com.ng/kasi-cloud-ltd-breaks-ground-in-lagos-nigeria-on-new-hyperscale-data-center/
Planned Campus Capacity · 100 MW
Planned / design or future potential · Kasi Lekki Data Center Campus (project)
Claim 35569 · Review: Approved · Claim date: Not published
Headline treatment: Selected headline
- Kasi Cloud commissions hyperscale-ready AI-capable campus in Lagos
Nigeria Sovereign Investment Authority · Document date: 2026-05-19 · Primary
https://nsia.com.ng/kasi-cloud-datacenters-commissions-west-africas-first-hyperscaleready-ai-capable-data-centre-campus-in-lagos/ - Kasi Cloud Datacenters commissions West Africa hyperscale-ready campus
Kasi Cloud / GlobeNewswire · Document date: 2026-05-19 · Corroborating
https://www.globenewswire.com/news-release/2026/05/19/3297917/0/en/kasi-cloud-datacenters-commissions-west-africa-s-first-hyperscale-ready-ai-capable-data-centre-campus-in-lagos.html
Construction Groundbreaking Date · 2022-04-19
actual · Kasi Lekki Data Center Campus (project)
Claim 35571 · Review: Approved · Claim date: Not published
- Kasi Cloud breaks ground in Lagos on new hyperscale data center
Nigeria Sovereign Investment Authority · Document date: 2022-04-19 · Primary
https://nsia.com.ng/kasi-cloud-ltd-breaks-ground-in-lagos-nigeria-on-new-hyperscale-data-center/
Commissioning Flag Off Date · 2026-05-19
actual · Kasi Lekki Data Center Campus (project)
Claim 35572 · Review: Approved · Claim date: Not published
- Kasi Cloud commissions hyperscale-ready AI-capable campus in Lagos
Nigeria Sovereign Investment Authority · Document date: 2026-05-19 · Primary
https://nsia.com.ng/kasi-cloud-datacenters-commissions-west-africas-first-hyperscaleready-ai-capable-data-centre-campus-in-lagos/
Carrier Neutral Design · True
actual · Kasi Lekki Data Center Campus (project)
Claim 35574 · Review: Approved · Claim date: Not published
- Kasi Cloud commissions hyperscale-ready AI-capable campus in Lagos
Nigeria Sovereign Investment Authority · Document date: 2026-05-19 · Primary
https://nsia.com.ng/kasi-cloud-datacenters-commissions-west-africas-first-hyperscaleready-ai-capable-data-centre-campus-in-lagos/
Direct Tcn Connection Voltage · 132 kV
actual · Kasi Lekki Data Center Campus (project)
Claim 35575 · Review: Approved · Claim date: Not published
- Kasi Cloud commissions hyperscale-ready AI-capable campus in Lagos
Nigeria Sovereign Investment Authority · Document date: 2026-05-19 · Primary
https://nsia.com.ng/kasi-cloud-datacenters-commissions-west-africas-first-hyperscaleready-ai-capable-data-centre-campus-in-lagos/
Hybrid Gas Solar Battery Design · True
actual · Kasi Lekki Data Center Campus (project)
Claim 35576 · Review: Approved · Claim date: Not published
- Kasi Cloud commissions hyperscale-ready AI-capable campus in Lagos
Nigeria Sovereign Investment Authority · Document date: 2026-05-19 · Primary
https://nsia.com.ng/kasi-cloud-datacenters-commissions-west-africas-first-hyperscaleready-ai-capable-data-centre-campus-in-lagos/
Pue Target At Most · 1.6
Planned / design or future potential · Kasi Lekki Data Center Campus (project)
Claim 35577 · Review: Approved · Claim date: Not published
- Nigerian data center operator Kasi opens first phase of 100MW facility
Data Center Dynamics · Document date: 2026-05-26 · Corroborating
https://www.datacenterdynamics.com/en/news/nigerian-data-center-operator-kasi-opens-first-phase-of-100mw-facility/ - Kasi Cloud commissions hyperscale-ready AI-capable campus in Lagos
Nigeria Sovereign Investment Authority · Document date: 2026-05-19 · Primary
https://nsia.com.ng/kasi-cloud-datacenters-commissions-west-africas-first-hyperscaleready-ai-capable-data-centre-campus-in-lagos/
Subsea Cable Systems Adjacent · 6 systems
actual · Kasi Lekki Data Center Campus (project)
Claim 35578 · Review: Approved · Claim date: Not published
- Kasi Cloud commissions hyperscale-ready AI-capable campus in Lagos
Nigeria Sovereign Investment Authority · Document date: 2026-05-19 · Primary
https://nsia.com.ng/kasi-cloud-datacenters-commissions-west-africas-first-hyperscaleready-ai-capable-data-centre-campus-in-lagos/
Reported Campus Investment · $250 million
actual · Kasi Lekki Data Center Campus (project)
Claim 35579 · Review: Approved · Claim date: Not published
- Nigerian data center operator Kasi opens first phase of 100MW facility
Data Center Dynamics · Document date: 2026-05-26 · Corroborating
https://www.datacenterdynamics.com/en/news/nigerian-data-center-operator-kasi-opens-first-phase-of-100mw-facility/ - Kasi Cloud breaks ground in Lagos on new hyperscale data center
Nigeria Sovereign Investment Authority · Document date: 2022-04-19 · Primary
https://nsia.com.ng/kasi-cloud-ltd-breaks-ground-in-lagos-nigeria-on-new-hyperscale-data-center/
Counterparties and capital
Kasi Cloud Datacenters · Developer, Operator · CMP-0947
Lagos State Government · Government Authority · CMP-0949
Nigeria Sovereign Investment Authority · Investor · CMP-0948
Transmission Company of Nigeria · Utility Provider · CMP-0950
$250,000,000 · 2022-04-19
Groundbreaking release described a USD 250 million campus; capital structure, draw schedule and current spend remain undisclosed.
Kasi Cloud Datacenters (Developer / Investment Recipient) · Nigeria Sovereign Investment Authority (Foundational Investor)
Financing record 110; claim-specific source links appear in the exhibit sources where published.
This schedule captures public Cartis research. It is not a title, lien or legal-opinion report. Document page/section locators and claim review timestamps are included only when published; this version has no separate locator or claim-review-time feed. Downloaded snapshots are retained by you; Cartis does not archive them automatically.