Data center siteSite record

Kasi Lekki Data Center Campus

Maiyegun, Lekki, LA, NigeriaUnder construction
Capacity
100 MW
Planned / design
Lead participant
Kasi Cloud Datacenters
Developer · Operator
Last updated
Aug 25, 2026
Most recent public record update

About Kasi Lekki Data Center Campus

Kasi is developing a carrier-neutral, AI-ready campus in Maiyegun, Lekki. Its first facility has reached commissioning, while the campus's 100 MW figure remains a long-term buildout envelope. Kasi Lekki Data Center Campus is located in Maiyegun, Lekki, LA, NG and is a data center campus in construction status. Participants include Kasi Cloud Datacenters as developer, Kasi Cloud Datacenters as operator, Nigeria Sovereign Investment Authority as investor, Transmission Company of Nigeria as utility. Published specifications include 100 MW of planned capacity. Development comprises Long-term campus buildout (proposed). Key milestones include Kasi broke ground on first Lagos campus (2022-04-19). grid connection — 132 kV: Direct TCN connection disclosed; energized service capacity and contracted draw are not public. onsite generation: Hybrid gas and solar generation design; installed capacities are undisclosed. Permitting includes building permit for four facilities for Kasi Lekki campus (reported approved). Capital records include reported campus investment of 250 USD million for Groundbreaking release described a USD 250 million campus; capital structure, draw schedule and current spend remain undisclosed.

Program relationships

0 linked

Capacity

Planned / design
Operating capacityAn operating IT-capacity figure has not been publicly disclosed.
Future Potential100 MWActual · Kasi Lekki Data Center Campus

Development

1 phases · 1 milestones
Long-term campus buildoutAnnounced Or Preconstruction

Campus envelope only; no allocation among future buildings.

Apr 19, 2022
Kasi broke ground on first Lagos campus
Completed

Infrastructure

Electric GridUnder Construction

132 kV

Direct TCN connection disclosed; energized service capacity and contracted draw are not public.

Onsite GenerationPlanned Or Represented

Hybrid gas and solar generation design; installed capacities are undisclosed.

Battery StoragePlanned Or Represented

Battery storage forms part of hybrid-power and redundancy design; capacity undisclosed.

FiberPlanned Or Represented

6 subsea cable systems

Carrier-neutral design adjacent to Equiano, 2Africa and four additional systems; executed carrier agreements undisclosed.

Project map

0 of 1 project point mapped
Infrastructure facts
4
Mapped records
1
Capacity figures
2

No map point available

Power & interconnection: 1Generation & storage: 2Fiber & connectivity: 1

Facts & sources

Published claims and their source links.

10 facts
Site Area Approximately
4 hectares
Actual
Planned Campus Capacity
100 MW
Actual
Construction Groundbreaking Date
2022-04-19
Actual
Commissioning Flag Off Date
2026-05-19
Actual
Carrier Neutral Design
True
Actual
Direct Tcn Connection Voltage
132 kV
Actual
Hybrid Gas Solar Battery Design
True
Actual
Pue Target At Most
1.6
Actual
Subsea Cable Systems Adjacent
6 systems
Actual
Reported Campus Investment
$250 million
Actual