Kao Data Harlow Campus

Harlow, England, United KingdomPartially operational
Capacity
71 MW
Planned critical IT
Lead participant
Kao Data
Developer
Last updated
Aug 28, 2026
Most recent public record update

About Kao Data Harlow Campus

Kao Data Harlow has two operating buildings, a third in development and a fourth planned. The 71 MW four-building ITE design is publishable; the separate 150 MW future concept and reported £230 million financing remain clearly scoped as campus context. Tenant utilization, contract pricing and undisclosed project financing remain outside the verified public record.

Projects sharing a market, utility, or organization.

3 related

Capacity

Planned critical IT
Operating capacityAn operating IT-capacity figure has not been publicly disclosed.
It Load71 MWDesign · Kao Data Harlow Campus
Design71 MWDesign · Kao Data Harlow Campus

Development

1 phases · 1 milestones
Operating facility and documented expansionOperational

Kao Data Harlow has two operating buildings, a third in development and a fourth planned. The 71 MW four-building ITE design is publishable; the separate 150 MW future concept and reported £230 million financing remain clearly scoped as campus context. Tenant utilization, contract pricing and undisclosed project financing remain outside the verified public record.

Aug 29, 2026
Project-specific source review refreshed
Completed

Infrastructure

Electric GridOperational

71 MW

71 MW is the published four-building Harlow ITE design; a separate 150 MW future expansion concept is not part of this headline.

FiberOperational

Carrier-neutral or resilient fibre connectivity is described for the individual facility.

Cooling SystemOperational

Cooling architecture supports the stated lifecycle; actual tenant draw and instantaneous load remain undisclosed.

Project map

0 of 1 project point mapped
Infrastructure facts
3
Mapped records
1
Capacity figures
1

No map point available

Power & interconnection: 1Cooling & water: 1Fiber & connectivity: 1

Facts & sources

Published claims and their source links.

18 facts
Location Context
Kao Data Harlow | Harlow | England | GB
Actual
Lifecycle Status
Partially operational
Actual
Reported Capacity
71 MW
Design
Capacity Basis
Kao Data publishes 71 MW for this project boundary.
Actual
Location Context
Kao Data Harlow | Harlow | England | GB
Actual
Lifecycle Status
Partially operational
Actual
Reported Capacity
71 MW
Design
Capacity Basis
71 MW is the published four building Harlow ITE design; a separate 150 MW future expansion concept is not part of this headline.
Actual
Operator Confirmed
Kao Data
Actual
Project Location
Harlow, England, GB
Actual
Current Lifecycle
Partly operating with phased delivery or expansion underway
Actual
Capacity Classification
Design
Actual
Capacity Basis
71 MW is the published four building Harlow ITE design; a separate 150 MW future expansion concept is not part of this headline.
Actual
Customer Utilization
Not publicly disclosed
Actual
Identity Boundary
This facility or named campus is tracked separately from adjacent buildings and broader operator portfolios
Actual
Source Refresh Date
2026-08-29
Actual
Facility Count
4 facilities
Design
Reported Financing
£230,000,000
Closed Financing