Skip to content
All records
Data center siteSite record

Iron Mountain LON-1 London Data Center

Slough, England, United KingdomOperating / Stabilized
Capacity
8.8 MW
Planned critical IT
Lead participant
Iron Mountain Data Centers
Developer
Last updated
Aug 28, 2026
Most recent public record update

About Iron Mountain LON-1 London Data Center

Iron Mountain LON-1 London Data Center, also known as Iron Mountain LON-1, is a data center project in Slough, England, GB. Upgraded Slough facility with 8.75 MW of total power capacity across four data halls and approximately 10,400 square meters. Carrier-neutral facility with N+1 block redundancy, diverse fiber feeds, dark fiber and access to LINX. Customer utilization, private contract terms and unreported project financing remain outside the verified public record.

Projects sharing a market, utility, or organization.

4 related

Capacity

Planned critical IT
Operating capacityAn operating IT-capacity figure has not been publicly disclosed.
It Load8.8 MWDesign · Iron Mountain LON-1 London Data Center
It Load8.7 MWDesign · Iron Mountain LON-1 London Data Center

Development

1 phases · 1 milestones
Operating facility and documented expansionOperational

Iron Mountain LON-1 London Data Center, also known as Iron Mountain LON-1, is a data center project in Slough, England, GB. Upgraded Slough facility with 8.75 MW of total power capacity across four data halls and approximately 10,400 square meters. Carrier-neutral facility with N+1 block redundancy, diverse fiber feeds, dark fiber and access to LINX. Customer utilization, private contract terms and unreported project financing remain outside the verified public record.

Aug 29, 2026
Project-specific evidence refreshed and reconciled
Completed

Infrastructure

Electric GridOperational

8.7 MW

8.7 MW is the Q2 2026 SEC-reported leaseable operating capacity. The larger marketed facility-power or design boundary is retained as a separate assertion and is not presented as current operating IT.

FiberOperational

Carrier-neutral facility with N+1 block redundancy, diverse fiber feeds, dark fiber and access to LINX.

Cooling SystemOperational

Cooling and resilience architecture is described at facility or campus level; instantaneous draw and tenant utilization remain undisclosed.

Project map

0 of 1 project point mapped
Infrastructure facts
3
Mapped records
1
Capacity figures
1

No map point available

Power & interconnection: 1Cooling & water: 1Fiber & connectivity: 1

Facts & sources

Published claims and their source links.

17 facts
Location Context
LON-1 | Slough | England | GB
Actual
Lifecycle Status
Operating
Actual
Reported Capacity
8.75 MW
Design
Capacity Basis
Iron Mountain publishes 8.75 MW for the LON-1 facility record boundary.
Actual
Location Context
LON-1 | Slough | England | GB
Actual
Lifecycle Status
Operating
Actual
Reported Capacity
8.7 MW
Design
Capacity Basis
8.7 MW is the Q2 2026 SEC-reported leaseable operating capacity. The larger marketed facility power or design boundary is retained as a separate assertion and is not presented as current operating IT.
Actual
Operator Or Developer
Iron Mountain Data Centers
Actual
Project Location
Slough, England, GB
Actual
Current Lifecycle
Operating or in phased operation
Actual
Capacity Classification
It load
Actual
Capacity Basis
8.7 MW is the Q2 2026 SEC-reported leaseable operating capacity. The larger marketed facility power or design boundary is retained as a separate assertion and is not presented as current operating IT.
Actual
Customer Utilization
Not publicly disclosed
Actual
Source Refresh Date
2026-08-29
Actual
Renewable Energy Matching
Operator states 100% matched renewable energy where applicable
Actual
Sec Capacity Comparison
Q2 2026 leaseable and development schedules reviewed
Actual