Iron Mountain LON-1 London Data Center
- Planned critical IT
- 8.8 MW
- Updated
- Oct 28, 2026
Iron Mountain LON-1 London Data Center, also known as Iron Mountain LON-1, is a data center project in Slough, England, GB. Upgraded Slough facility with 8.75 MW of total power capacity across four data halls and approximately 10,400 square meters. Carrier-neutral facility with N+1 block redundancy, diverse fiber feeds, dark fiber and access to LINX. Customer utilization, private contract terms and unreported project financing remain outside the verified public record.
Capacity
Operating IT capacity: Not established in published records
A missing figure does not mean zero. Planned, utility and generation figures are not operating IT capacity.
Development
Iron Mountain LON-1 London Data Center, also known as Iron Mountain LON-1, is a data center project in Slough, England, GB. Upgraded Slough facility with 8.75 MW of total power capacity across four data halls and approximately 10,400 square meters. Carrier-neutral facility with N+1 block redundancy, diverse fiber feeds, dark fiber and access to LINX. Customer utilization, private contract terms and unreported project financing remain outside the verified public record.
Milestones (1)
Aug 29, 2026 · Recorded actual event
Completed · Status changed
Source not linkedParticipants
Developer
Sources by role
Developer (1)
- Iron Mountain LON-1 facility profile · Aug 28, 2026 · Primary
Site & development
Technical specifications
Additional project facts
Capacity basis
Actual8.7 MW is the Q2 2026 SEC-reported leaseable operating capacity. The larger marketed facility power or design boundary is retained as a separate assertion and is not presented as current operating IT.
SourceCapacity basis
Actual8.7 MW is the Q2 2026 SEC-reported leaseable operating capacity. The larger marketed facility power or design boundary is retained as a separate assertion and is not presented as current operating IT.
SourceInfrastructure & permits
Technical details (3)
Operational
8.7 MW
8.7 MW is the Q2 2026 SEC-reported leaseable operating capacity. The larger marketed facility-power or design boundary is retained as a separate assertion and is not presented as current operating IT.
Operational
Carrier-neutral facility with N+1 block redundancy, diverse fiber feeds, dark fiber and access to LINX.
Operational
Cooling and resilience architecture is described at facility or campus level; instantaneous draw and tenant utilization remain undisclosed.
Project map
Public-source research. Plans may change. See Evidence for sources and qualifications.
Related projects (4)
Under construction · Slough, England, United Kingdom
Same locality: Slough · Shared participant: Iron Mountain Data Centers
Compare in a collectionOperating · Slough, England, United Kingdom
Same locality: Slough
Compare in a collectionOperating · Slough, England, United Kingdom
Same locality: Slough
Compare in a collectionOperating · Slough, England, United Kingdom
Same locality: Slough
Compare in a collection