Iron Mountain AZS-1 Scottsdale Data Center
- Planned critical IT
- 5.8 MW
- Updated
- Oct 28, 2026
AZS-1 is the operating Scottsdale facility with 5.7 MW leaseable in Q2 2026, while current marketing rounds total facility power to 5.8 MW and identifies 9.6 MW future scalability. Cartis publishes the leaseable figure and keeps the expansion ceiling separate. Arizona tax treatment is recorded as an available framework, not a realized award. Customer utilization, private contract terms and unreported project financing remain outside the verified public record.
Capacity
Operating IT capacity: Not established in published records
A missing figure does not mean zero. Planned, utility and generation figures are not operating IT capacity.
Development
AZS-1 is the operating Scottsdale facility with 5.7 MW leaseable in Q2 2026, while current marketing rounds total facility power to 5.8 MW and identifies 9.6 MW future scalability. Cartis publishes the leaseable figure and keeps the expansion ceiling separate. Arizona tax treatment is recorded as an available framework, not a realized award. Customer utilization, private contract terms and unreported project financing remain outside the verified public record.
Milestones (1)
Aug 29, 2026 · Recorded actual event
Completed · Status changed
Source not linkedParticipants
Developer
Sources by role
Developer (1)
- Iron Mountain AZS-1 facility profile · Aug 28, 2026 · Primary
Capital & incentives
Incentives
Sales tax exemption
Proposed · Arizona Commerce Authority
Operator identifies the Arizona tax incentive; no project-specific realized amount is asserted.
Site & development
Technical specifications
Additional project facts
Capacity basis
Actual5.7 MW is the Q2 2026 SEC-reported leaseable operating capacity. The larger marketed facility power or design boundary is retained as a separate assertion and is not presented as current operating IT.
SourceCapacity basis
Actual5.7 MW is the Q2 2026 SEC-reported leaseable operating capacity. The larger marketed facility power or design boundary is retained as a separate assertion and is not presented as current operating IT.
SourceInfrastructure & permits
Technical details (3)
Operational
5.7 MW
5.7 MW is the Q2 2026 SEC-reported leaseable operating capacity. The larger marketed facility-power or design boundary is retained as a separate assertion and is not presented as current operating IT.
Operational
Renewable-energy-matched facility with redundant power and cooling, 16+ on-site providers and cloud connectivity.
Operational
Cooling and resilience architecture is described at facility or campus level; instantaneous draw and tenant utilization remain undisclosed.
Project map
Public-source research. Plans may change. See Evidence for sources and qualifications.
Related projects (3)
Operating · Phoenix, Arizona, United States
Shared participant: Iron Mountain Data Centers · Same market: Arizona, United States
Compare in a collectionPartially operational · Phoenix, Arizona, United States
Shared participant: Iron Mountain Data Centers · Same market: Arizona, United States
Compare in a collectionOperating · Phoenix, Arizona, United States
Shared participant: Iron Mountain Data Centers · Same market: Arizona, United States