Cartis diligence evidence schedule
Hut 8 Beacon Point AI Data Center Campus
PRJ-0671 · Site · Texas, United States
Captured 2026-09-06T04:13:36.657Z · Record last updated 2026-08-27
SHA-256: a00a179a1fd1d569ebe9c02b031f8f6d8463d9562c9f636406a36d781a0b40f4
Save a diligence baseline
Download the public evidence as it appears now. Compare a previously saved snapshot to see added, removed and changed claims, counterparties, financing and milestones. Files are read in this browser and are not uploaded.
The fingerprint detects file changes; it is not a digital signature or a claim of independently verified authenticity. Keep your downloaded copy with the transaction file.
Scope and capacity
Hut 8 is developing Beacon Point in Nueces County as a two-phase AI campus. Two 15-year leases now cover a combined 704 MW of critical IT load within approximately 1,000 MW of utility capacity. Hut 8, American Electric Power, Jacobs is associated with the development in Nueces County, TX, US. The disclosed development scope includes 704 MW contracted critical IT across two phases; approximately 1,000 MW utility capacity; Phase 1 financed with $4.25 billion of secured notes; Phase 2 initial delivery expected Q2 2028. Power and physical infrastructure include aEP Texas interconnection supports two approximately 500 MW utility phases and purpose-built AI factories. Two executed tenant leases cover a combined 704 MW of critical IT capacity at Beacon Point. Beacon Point Phase 1 is financed with $4.25 billion of senior secured notes; the two leases have an aggregate stated base-term value of about $19.6 billion.
Headline: 704 MW Contracted
Numbers refer to their stated physical boundaries and are not added together. Source dates, claim dates and record updates have different meanings. Missing dates and locators are not inferred.
Claims and exhibit sources
Location Context · Beacon Point campus | Nueces County | Texas
actual · Hut 8 Beacon Point AI Data Center Campus (project)
Claim 57110 · Review: Approved · Claim date: Not published
- Hut 8 commercializes first phase of Beacon Point
Hut 8 · Document date: 2026-05-06 · Primary
https://www.prnewswire.com/news-releases/hut-8-commercializes-first-phase-of-1-gw-beacon-point-ai-data-center-campus-with-15-year-352-mw-it-lease-with-base-term-contract-value-of-9-8-billion-302763484.html
Lifecycle Status · Construction
actual · Hut 8 Beacon Point AI Data Center Campus (project)
Claim 57111 · Review: Approved · Claim date: Not published
- Hut 8 commercializes first phase of Beacon Point
Hut 8 · Document date: 2026-05-06 · Primary
https://www.prnewswire.com/news-releases/hut-8-commercializes-first-phase-of-1-gw-beacon-point-ai-data-center-campus-with-15-year-352-mw-it-lease-with-base-term-contract-value-of-9-8-billion-302763484.html
Reported Capacity · 352 MW
actual · Hut 8 Beacon Point AI Data Center Campus (project)
Claim 57112 · Review: Approved · Claim date: Not published
Headline treatment: Separate claim, not added to the headline
- Hut 8 commercializes first phase of Beacon Point
Hut 8 · Document date: 2026-05-06 · Primary
https://www.prnewswire.com/news-releases/hut-8-commercializes-first-phase-of-1-gw-beacon-point-ai-data-center-campus-with-15-year-352-mw-it-lease-with-base-term-contract-value-of-9-8-billion-302763484.html
Capacity Basis · A 15-year tenant lease covers 352 MW of critical IT capacity.
actual · Hut 8 Beacon Point AI Data Center Campus (project)
Claim 57113 · Review: Approved · Claim date: Not published
- Hut 8 commercializes first phase of Beacon Point
Hut 8 · Document date: 2026-05-06 · Primary
https://www.prnewswire.com/news-releases/hut-8-commercializes-first-phase-of-1-gw-beacon-point-ai-data-center-campus-with-15-year-352-mw-it-lease-with-base-term-contract-value-of-9-8-billion-302763484.html
Location Context · Beacon Point campus | Nueces County | Texas
actual · Hut 8 Beacon Point AI Data Center Campus (project)
Claim 111123 · Review: Approved · Claim date: Not published
- Hut 8 commercializes first phase of Beacon Point
Hut 8 · Document date: 2026-05-06 · Primary
https://www.prnewswire.com/news-releases/hut-8-commercializes-first-phase-of-1-gw-beacon-point-ai-data-center-campus-with-15-year-352-mw-it-lease-with-base-term-contract-value-of-9-8-billion-302763484.html
Lifecycle Status · Construction
actual · Hut 8 Beacon Point AI Data Center Campus (project)
Claim 111124 · Review: Approved · Claim date: Not published
- Hut 8 commercializes first phase of Beacon Point
Hut 8 · Document date: 2026-05-06 · Primary
https://www.prnewswire.com/news-releases/hut-8-commercializes-first-phase-of-1-gw-beacon-point-ai-data-center-campus-with-15-year-352-mw-it-lease-with-base-term-contract-value-of-9-8-billion-302763484.html
Reported Capacity · 704 MW
actual · Hut 8 Beacon Point AI Data Center Campus (project)
Claim 111125 · Review: Approved · Claim date: Not published
Headline treatment: Selected headline
- Hut 8 commercializes first phase of Beacon Point
Hut 8 · Document date: 2026-05-06 · Primary
https://www.prnewswire.com/news-releases/hut-8-commercializes-first-phase-of-1-gw-beacon-point-ai-data-center-campus-with-15-year-352-mw-it-lease-with-base-term-contract-value-of-9-8-billion-302763484.html
Capacity Basis · Two executed tenant leases cover a combined 704 MW of critical IT capacity at Beacon Point.
actual · Hut 8 Beacon Point AI Data Center Campus (project)
Claim 111126 · Review: Approved · Claim date: Not published
- Hut 8 commercializes first phase of Beacon Point
Hut 8 · Document date: 2026-05-06 · Primary
https://www.prnewswire.com/news-releases/hut-8-commercializes-first-phase-of-1-gw-beacon-point-ai-data-center-campus-with-15-year-352-mw-it-lease-with-base-term-contract-value-of-9-8-billion-302763484.html
Development Scale · 704 MW contracted critical IT across two phases
actual · Hut 8 Beacon Point AI Data Center Campus (project)
Claim 111143 · Review: Approved · Claim date: Not published
- Hut 8 quarter ended June 2026 Form 10-Q
Hut 8 · Document date: 2026-08-12 · Corroborating
https://www.sec.gov/Archives/edgar/data/1964789/000110465926090025/hut-20260630x10q.htm - Hut 8 commercializes first phase of Beacon Point
Hut 8 · Document date: 2026-05-06 · Primary
https://www.prnewswire.com/news-releases/hut-8-commercializes-first-phase-of-1-gw-beacon-point-ai-data-center-campus-with-15-year-352-mw-it-lease-with-base-term-contract-value-of-9-8-billion-302763484.html
Development Milestone · Approximately 1,000 MW utility capacity
actual · Hut 8 Beacon Point AI Data Center Campus (project)
Claim 111144 · Review: Approved · Claim date: Not published
- Hut 8 quarter ended June 2026 Form 10-Q
Hut 8 · Document date: 2026-08-12 · Corroborating
https://www.sec.gov/Archives/edgar/data/1964789/000110465926090025/hut-20260630x10q.htm - Hut 8 commercializes first phase of Beacon Point
Hut 8 · Document date: 2026-05-06 · Primary
https://www.prnewswire.com/news-releases/hut-8-commercializes-first-phase-of-1-gw-beacon-point-ai-data-center-campus-with-15-year-352-mw-it-lease-with-base-term-contract-value-of-9-8-billion-302763484.html
Power Arrangement · Phase 1 financed with $4.25 billion of secured notes
actual · Hut 8 Beacon Point AI Data Center Campus (project)
Claim 111145 · Review: Approved · Claim date: Not published
- Hut 8 quarter ended June 2026 Form 10-Q
Hut 8 · Document date: 2026-08-12 · Corroborating
https://www.sec.gov/Archives/edgar/data/1964789/000110465926090025/hut-20260630x10q.htm - Hut 8 commercializes first phase of Beacon Point
Hut 8 · Document date: 2026-05-06 · Primary
https://www.prnewswire.com/news-releases/hut-8-commercializes-first-phase-of-1-gw-beacon-point-ai-data-center-campus-with-15-year-352-mw-it-lease-with-base-term-contract-value-of-9-8-billion-302763484.html
Site Configuration · Phase 2 initial delivery expected Q2 2028.
actual · Hut 8 Beacon Point AI Data Center Campus (project)
Claim 111146 · Review: Approved · Claim date: Not published
- Hut 8 quarter ended June 2026 Form 10-Q
Hut 8 · Document date: 2026-08-12 · Corroborating
https://www.sec.gov/Archives/edgar/data/1964789/000110465926090025/hut-20260630x10q.htm - Hut 8 commercializes first phase of Beacon Point
Hut 8 · Document date: 2026-05-06 · Primary
https://www.prnewswire.com/news-releases/hut-8-commercializes-first-phase-of-1-gw-beacon-point-ai-data-center-campus-with-15-year-352-mw-it-lease-with-base-term-contract-value-of-9-8-billion-302763484.html
Counterparties and capital
American Electric Power · Utility Provider · CMP-1417
Hut 8 · Developer · CMP-1416
Jacobs · Contractor · CMP-1418
$4,250,000,000 · 2026-06-01
Beacon Point Phase 1 data center and substation construction.
Hut 8 (Sponsor)
Financing record 211; claim-specific source links appear in the exhibit sources where published.
This schedule captures public Cartis research. It is not a title, lien or legal-opinion report. Document page/section locators and claim review timestamps are included only when published; this version has no separate locator or claim-review-time feed. Downloaded snapshots are retained by you; Cartis does not archive them automatically.