Green Mountain TEL-Rjukan Data Center Campus

PRJ-0781 · Site · Rjukan, Telemark, Norway

Record last updated Oct 28, 2026

Scope and capacity

Green Mountain TEL-Rjukan Data Center Campus, also known as Green Mountain TEL-Rjukan, is a data center project in Rjukan, Telemark, NO associated with Green Mountain. 29,000 square metres; 50 MW maximum site capacity; four modular buildings. Hydropower-backed campus using natural free cooling, two grid supplies and carrier-neutral fiber. 50 MW is Green Mountain’s maximum campus design. The current grid supply is described separately as two 10 MW feeds with plans to reach two 25 MW feeds; neither figure is tenant utilization.

Headline: 50 MW Planned / design

Numbers refer to their stated physical boundaries and are not added together. Source dates, claim dates and record updates have different meanings. Missing dates and locators are not inferred.

Claims and exhibit sources

Jump to a claim (13)

Location context · Green Mountain TEL-Rjukan | Rjukan | Telemark | NO

Actual · Green Mountain TEL-Rjukan Data Center Campus (Project)

Claim 60996 · Recorded claim type: Actual · Review: Approved · Claim date: Not stated

  1. Green Mountain Green Mountain TEL-Rjukan profile

    Green Mountain · Document date: Aug 27, 2026 · Primary

    Source reference: SRC-3343 · Fact sheet · Recorded authority: Official primary

    Source URL

    https://greenmountain.no/data-center/tel-rjukan/

Lifecycle status · Partially operational

Actual · Green Mountain TEL-Rjukan Data Center Campus (Project)

Claim 60997 · Recorded claim type: Actual · Review: Approved · Claim date: Not stated

  1. Green Mountain Green Mountain TEL-Rjukan profile

    Green Mountain · Document date: Aug 27, 2026 · Primary

    Source reference: SRC-3343 · Fact sheet · Recorded authority: Official primary

    Source URL

    https://greenmountain.no/data-center/tel-rjukan/

Reported capacity · 50 MW

Planned / design or future potential · Green Mountain TEL-Rjukan Data Center Campus (Project)

Claim 60998 · Recorded claim type: Design · Review: Approved · Claim date: Not stated

Headline treatment: Separate claim, not added to the headline

  1. Green Mountain Green Mountain TEL-Rjukan profile

    Green Mountain · Document date: Aug 27, 2026 · Primary

    Source reference: SRC-3343 · Fact sheet · Recorded authority: Official primary

    Source URL

    https://greenmountain.no/data-center/tel-rjukan/

Capacity basis · Green Mountain publishes 50 MW of maximum total site capacity; this is not represented as measured IT load.

Actual · Green Mountain TEL-Rjukan Data Center Campus (Project)

Claim 60999 · Recorded claim type: Actual · Review: Approved · Claim date: Not stated

  1. Green Mountain Green Mountain TEL-Rjukan profile

    Green Mountain · Document date: Aug 27, 2026 · Primary

    Source reference: SRC-3343 · Fact sheet · Recorded authority: Official primary

    Source URL

    https://greenmountain.no/data-center/tel-rjukan/

Location context · Green Mountain TEL-Rjukan | Rjukan | Telemark | NO

Actual · Green Mountain TEL-Rjukan Data Center Campus (Project)

Claim 100876 · Recorded claim type: Actual · Review: Approved · Claim date: Not stated

  1. Green Mountain Green Mountain TEL-Rjukan profile

    Green Mountain · Document date: Aug 27, 2026 · Primary

    Source reference: SRC-3343 · Fact sheet · Recorded authority: Official primary

    Source URL

    https://greenmountain.no/data-center/tel-rjukan/

Lifecycle status · Partially operational

Actual · Green Mountain TEL-Rjukan Data Center Campus (Project)

Claim 100877 · Recorded claim type: Actual · Review: Approved · Claim date: Not stated

  1. Green Mountain Green Mountain TEL-Rjukan profile

    Green Mountain · Document date: Aug 27, 2026 · Primary

    Source reference: SRC-3343 · Fact sheet · Recorded authority: Official primary

    Source URL

    https://greenmountain.no/data-center/tel-rjukan/

Reported capacity · 50 MW

Planned / design or future potential · Green Mountain TEL-Rjukan Data Center Campus (Project)

Claim 100878 · Recorded claim type: Design · Review: Approved · Claim date: Not stated

Headline treatment: Selected headline

  1. Green Mountain Green Mountain TEL-Rjukan profile

    Green Mountain · Document date: Aug 27, 2026 · Primary

    Source reference: SRC-3343 · Fact sheet · Recorded authority: Official primary

    Source URL

    https://greenmountain.no/data-center/tel-rjukan/

Capacity basis · 50 MW is Green Mountain’s maximum campus design. The current grid supply is described separately as two 10 MW feeds with plans to reach two 25 MW feeds; neither figure is tenant utilization.

Actual · Green Mountain TEL-Rjukan Data Center Campus (Project)

Claim 100879 · Recorded claim type: Actual · Review: Approved · Claim date: Not stated

  1. Green Mountain Green Mountain TEL-Rjukan profile

    Green Mountain · Document date: Aug 27, 2026 · Primary

    Source reference: SRC-3343 · Fact sheet · Recorded authority: Official primary

    Source URL

    https://greenmountain.no/data-center/tel-rjukan/

Project identity · Green Mountain TEL-Rjukan

Actual · Green Mountain TEL-Rjukan Data Center Campus (Project)

Claim 100881 · Recorded claim type: Actual · Review: Approved · Claim date: Not stated

  1. Green Mountain Green Mountain TEL-Rjukan profile

    Green Mountain · Document date: Aug 27, 2026 · Primary

    Source reference: SRC-3343 · Fact sheet · Recorded authority: Official primary

    Source URL

    https://greenmountain.no/data-center/tel-rjukan/

Location context · Rjukan, Telemark, NO

Actual · Green Mountain TEL-Rjukan Data Center Campus (Project)

Claim 100882 · Recorded claim type: Actual · Review: Approved · Claim date: Not stated

  1. Green Mountain Green Mountain TEL-Rjukan profile

    Green Mountain · Document date: Aug 27, 2026 · Primary

    Source reference: SRC-3343 · Fact sheet · Recorded authority: Official primary

    Source URL

    https://greenmountain.no/data-center/tel-rjukan/

Lifecycle status · Partially operational

Actual · Green Mountain TEL-Rjukan Data Center Campus (Project)

Claim 100883 · Recorded claim type: Actual · Review: Approved · Claim date: Not stated

  1. Green Mountain Green Mountain TEL-Rjukan profile

    Green Mountain · Document date: Aug 27, 2026 · Primary

    Source reference: SRC-3343 · Fact sheet · Recorded authority: Official primary

    Source URL

    https://greenmountain.no/data-center/tel-rjukan/

Development detail · 29,000 Square metres; 50 MW maximum site capacity; four modular buildings.

Actual · Green Mountain TEL-Rjukan Data Center Campus (Project)

Claim 100884 · Recorded claim type: Actual · Review: Approved · Claim date: Not stated

  1. Green Mountain Green Mountain TEL-Rjukan profile

    Green Mountain · Document date: Aug 27, 2026 · Primary

    Source reference: SRC-3343 · Fact sheet · Recorded authority: Official primary

    Source URL

    https://greenmountain.no/data-center/tel-rjukan/

Capacity basis · 50 MW is Green Mountain’s maximum campus design. The current grid supply is described separately as two 10 MW feeds with plans to reach two 25 MW feeds; neither figure is tenant utilization.

Actual · Green Mountain TEL-Rjukan Data Center Campus (Project)

Claim 100885 · Recorded claim type: Actual · Review: Approved · Claim date: Not stated

  1. Green Mountain Green Mountain TEL-Rjukan profile

    Green Mountain · Document date: Aug 27, 2026 · Primary

    Source reference: SRC-3343 · Fact sheet · Recorded authority: Official primary

    Source URL

    https://greenmountain.no/data-center/tel-rjukan/

Counterparties and capital

Green Mountain · Developer · CMP-1230