Cartis diligence evidence schedule
Green Mountain TEL-Rjukan Data Center Campus
PRJ-0781 · Site · Rjukan, Telemark, Norway
Record last updated Oct 28, 2026
Scope and capacity
Green Mountain TEL-Rjukan Data Center Campus, also known as Green Mountain TEL-Rjukan, is a data center project in Rjukan, Telemark, NO associated with Green Mountain. 29,000 square metres; 50 MW maximum site capacity; four modular buildings. Hydropower-backed campus using natural free cooling, two grid supplies and carrier-neutral fiber. 50 MW is Green Mountain’s maximum campus design. The current grid supply is described separately as two 10 MW feeds with plans to reach two 25 MW feeds; neither figure is tenant utilization.
Headline: 50 MW Planned / design
Numbers refer to their stated physical boundaries and are not added together. Source dates, claim dates and record updates have different meanings. Missing dates and locators are not inferred.
Claims and exhibit sources
Jump to a claim (13)
Location context · Green Mountain TEL-Rjukan | Rjukan | Telemark | NO
Actual · Green Mountain TEL-Rjukan Data Center Campus (Project)
Claim 60996 · Recorded claim type: Actual · Review: Approved · Claim date: Not stated
- Green Mountain Green Mountain TEL-Rjukan profile
Green Mountain · Document date: Aug 27, 2026 · Primary
Source reference: SRC-3343 · Fact sheet · Recorded authority: Official primary
Source URL
https://greenmountain.no/data-center/tel-rjukan/
https://greenmountain.no/data-center/tel-rjukan/
Lifecycle status · Partially operational
Actual · Green Mountain TEL-Rjukan Data Center Campus (Project)
Claim 60997 · Recorded claim type: Actual · Review: Approved · Claim date: Not stated
- Green Mountain Green Mountain TEL-Rjukan profile
Green Mountain · Document date: Aug 27, 2026 · Primary
Source reference: SRC-3343 · Fact sheet · Recorded authority: Official primary
Source URL
https://greenmountain.no/data-center/tel-rjukan/
https://greenmountain.no/data-center/tel-rjukan/
Reported capacity · 50 MW
Planned / design or future potential · Green Mountain TEL-Rjukan Data Center Campus (Project)
Claim 60998 · Recorded claim type: Design · Review: Approved · Claim date: Not stated
Headline treatment: Separate claim, not added to the headline
- Green Mountain Green Mountain TEL-Rjukan profile
Green Mountain · Document date: Aug 27, 2026 · Primary
Source reference: SRC-3343 · Fact sheet · Recorded authority: Official primary
Source URL
https://greenmountain.no/data-center/tel-rjukan/
https://greenmountain.no/data-center/tel-rjukan/
Capacity basis · Green Mountain publishes 50 MW of maximum total site capacity; this is not represented as measured IT load.
Actual · Green Mountain TEL-Rjukan Data Center Campus (Project)
Claim 60999 · Recorded claim type: Actual · Review: Approved · Claim date: Not stated
- Green Mountain Green Mountain TEL-Rjukan profile
Green Mountain · Document date: Aug 27, 2026 · Primary
Source reference: SRC-3343 · Fact sheet · Recorded authority: Official primary
Source URL
https://greenmountain.no/data-center/tel-rjukan/
https://greenmountain.no/data-center/tel-rjukan/
Location context · Green Mountain TEL-Rjukan | Rjukan | Telemark | NO
Actual · Green Mountain TEL-Rjukan Data Center Campus (Project)
Claim 100876 · Recorded claim type: Actual · Review: Approved · Claim date: Not stated
- Green Mountain Green Mountain TEL-Rjukan profile
Green Mountain · Document date: Aug 27, 2026 · Primary
Source reference: SRC-3343 · Fact sheet · Recorded authority: Official primary
Source URL
https://greenmountain.no/data-center/tel-rjukan/
https://greenmountain.no/data-center/tel-rjukan/
Lifecycle status · Partially operational
Actual · Green Mountain TEL-Rjukan Data Center Campus (Project)
Claim 100877 · Recorded claim type: Actual · Review: Approved · Claim date: Not stated
- Green Mountain Green Mountain TEL-Rjukan profile
Green Mountain · Document date: Aug 27, 2026 · Primary
Source reference: SRC-3343 · Fact sheet · Recorded authority: Official primary
Source URL
https://greenmountain.no/data-center/tel-rjukan/
https://greenmountain.no/data-center/tel-rjukan/
Reported capacity · 50 MW
Planned / design or future potential · Green Mountain TEL-Rjukan Data Center Campus (Project)
Claim 100878 · Recorded claim type: Design · Review: Approved · Claim date: Not stated
Headline treatment: Selected headline
- Green Mountain Green Mountain TEL-Rjukan profile
Green Mountain · Document date: Aug 27, 2026 · Primary
Source reference: SRC-3343 · Fact sheet · Recorded authority: Official primary
Source URL
https://greenmountain.no/data-center/tel-rjukan/
https://greenmountain.no/data-center/tel-rjukan/
Capacity basis · 50 MW is Green Mountain’s maximum campus design. The current grid supply is described separately as two 10 MW feeds with plans to reach two 25 MW feeds; neither figure is tenant utilization.
Actual · Green Mountain TEL-Rjukan Data Center Campus (Project)
Claim 100879 · Recorded claim type: Actual · Review: Approved · Claim date: Not stated
- Green Mountain Green Mountain TEL-Rjukan profile
Green Mountain · Document date: Aug 27, 2026 · Primary
Source reference: SRC-3343 · Fact sheet · Recorded authority: Official primary
Source URL
https://greenmountain.no/data-center/tel-rjukan/
https://greenmountain.no/data-center/tel-rjukan/
Project identity · Green Mountain TEL-Rjukan
Actual · Green Mountain TEL-Rjukan Data Center Campus (Project)
Claim 100881 · Recorded claim type: Actual · Review: Approved · Claim date: Not stated
- Green Mountain Green Mountain TEL-Rjukan profile
Green Mountain · Document date: Aug 27, 2026 · Primary
Source reference: SRC-3343 · Fact sheet · Recorded authority: Official primary
Source URL
https://greenmountain.no/data-center/tel-rjukan/
https://greenmountain.no/data-center/tel-rjukan/
Location context · Rjukan, Telemark, NO
Actual · Green Mountain TEL-Rjukan Data Center Campus (Project)
Claim 100882 · Recorded claim type: Actual · Review: Approved · Claim date: Not stated
- Green Mountain Green Mountain TEL-Rjukan profile
Green Mountain · Document date: Aug 27, 2026 · Primary
Source reference: SRC-3343 · Fact sheet · Recorded authority: Official primary
Source URL
https://greenmountain.no/data-center/tel-rjukan/
https://greenmountain.no/data-center/tel-rjukan/
Lifecycle status · Partially operational
Actual · Green Mountain TEL-Rjukan Data Center Campus (Project)
Claim 100883 · Recorded claim type: Actual · Review: Approved · Claim date: Not stated
- Green Mountain Green Mountain TEL-Rjukan profile
Green Mountain · Document date: Aug 27, 2026 · Primary
Source reference: SRC-3343 · Fact sheet · Recorded authority: Official primary
Source URL
https://greenmountain.no/data-center/tel-rjukan/
https://greenmountain.no/data-center/tel-rjukan/
Development detail · 29,000 Square metres; 50 MW maximum site capacity; four modular buildings.
Actual · Green Mountain TEL-Rjukan Data Center Campus (Project)
Claim 100884 · Recorded claim type: Actual · Review: Approved · Claim date: Not stated
- Green Mountain Green Mountain TEL-Rjukan profile
Green Mountain · Document date: Aug 27, 2026 · Primary
Source reference: SRC-3343 · Fact sheet · Recorded authority: Official primary
Source URL
https://greenmountain.no/data-center/tel-rjukan/
https://greenmountain.no/data-center/tel-rjukan/
Capacity basis · 50 MW is Green Mountain’s maximum campus design. The current grid supply is described separately as two 10 MW feeds with plans to reach two 25 MW feeds; neither figure is tenant utilization.
Actual · Green Mountain TEL-Rjukan Data Center Campus (Project)
Claim 100885 · Recorded claim type: Actual · Review: Approved · Claim date: Not stated
- Green Mountain Green Mountain TEL-Rjukan profile
Green Mountain · Document date: Aug 27, 2026 · Primary
Source reference: SRC-3343 · Fact sheet · Recorded authority: Official primary
Source URL
https://greenmountain.no/data-center/tel-rjukan/
https://greenmountain.no/data-center/tel-rjukan/
Counterparties and capital
Green Mountain · Developer · CMP-1230