Green Mountain TEL-Rjukan Data Center Campus

Rjukan, Telemark, NorwayPartially operational
Evidence
Planned / design
50 MW
Updated
Oct 28, 2026

Green Mountain TEL-Rjukan Data Center Campus, also known as Green Mountain TEL-Rjukan, is a data center project in Rjukan, Telemark, NO associated with Green Mountain. 29,000 square metres; 50 MW maximum site capacity; four modular buildings. Hydropower-backed campus using natural free cooling, two grid supplies and carrier-neutral fiber. 50 MW is Green Mountain’s maximum campus design. The current grid supply is described separately as two 10 MW feeds with plans to reach two 25 MW feeds; neither figure is tenant utilization.

Capacity

Reported capacity

Planned / design or future potential

50 MW

Source

Reported capacity

Planned / design or future potential

50 MW

Source

Operating IT capacity: Not established in published records

A missing figure does not mean zero. Planned, utility and generation figures are not operating IT capacity.

Development

Operating facility and documented expansionPartially operational

50 MW is Green Mountain’s maximum campus design. The current grid supply is described separately as two 10 MW feeds with plans to reach two 25 MW feeds; neither figure is tenant utilization.

Participants

Green Mountain

Developer

Sources by role
Developer (1)

Site & development

Location context

Actual

Green Mountain TEL-Rjukan | Rjukan | Telemark | NO

Source

Location context

Actual

Green Mountain TEL-Rjukan | Rjukan | Telemark | NO

Source

Location context

Actual

Rjukan, Telemark, NO

Source

Development detail

Actual

29,000 Square metres; 50 MW maximum site capacity; four modular buildings.

Source

Additional project facts

Lifecycle status

Actual

Partially operational

Source

Capacity basis

Actual

Green Mountain publishes 50 MW of maximum total site capacity; this is not represented as measured IT load.

Source

Lifecycle status

Actual

Partially operational

Source

Capacity basis

Actual

50 MW is Green Mountain’s maximum campus design. The current grid supply is described separately as two 10 MW feeds with plans to reach two 25 MW feeds; neither figure is tenant utilization.

Source

Project identity

Actual

Green Mountain TEL-Rjukan

Source

Lifecycle status

Actual

Partially operational

Source

Capacity basis

Actual

50 MW is Green Mountain’s maximum campus design. The current grid supply is described separately as two 10 MW feeds with plans to reach two 25 MW feeds; neither figure is tenant utilization.

Source

Infrastructure & permits

Technical details (3)
Electric grid

Energized

Hydropower-backed campus using natural free cooling, two grid supplies and carrier-neutral fiber.

Cooling system

Operational

Cooling and efficiency claims remain limited to operator-described designs; no water use or delivered load is inferred.

Electric grid

Planned or represented

20 MW current feed total

Two 10 MW feeds are planned to expand to two 25 MW feeds; these are electrical supply, not tenant load.

Public-source research. Plans may change. See Evidence for sources and qualifications.