Green Mountain TEL-Rjukan Data Center Campus
- Planned / design
- 50 MW
- Updated
- Oct 28, 2026
Green Mountain TEL-Rjukan Data Center Campus, also known as Green Mountain TEL-Rjukan, is a data center project in Rjukan, Telemark, NO associated with Green Mountain. 29,000 square metres; 50 MW maximum site capacity; four modular buildings. Hydropower-backed campus using natural free cooling, two grid supplies and carrier-neutral fiber. 50 MW is Green Mountain’s maximum campus design. The current grid supply is described separately as two 10 MW feeds with plans to reach two 25 MW feeds; neither figure is tenant utilization.
Capacity
Operating IT capacity: Not established in published records
A missing figure does not mean zero. Planned, utility and generation figures are not operating IT capacity.
Development
50 MW is Green Mountain’s maximum campus design. The current grid supply is described separately as two 10 MW feeds with plans to reach two 25 MW feeds; neither figure is tenant utilization.
Participants
Developer
Sources by role
Developer (1)
- Green Mountain Green Mountain TEL-Rjukan profile · Aug 27, 2026 · Primary
Site & development
Development detail
Actual29,000 Square metres; 50 MW maximum site capacity; four modular buildings.
SourceAdditional project facts
Capacity basis
ActualGreen Mountain publishes 50 MW of maximum total site capacity; this is not represented as measured IT load.
SourceCapacity basis
Actual50 MW is Green Mountain’s maximum campus design. The current grid supply is described separately as two 10 MW feeds with plans to reach two 25 MW feeds; neither figure is tenant utilization.
SourceCapacity basis
Actual50 MW is Green Mountain’s maximum campus design. The current grid supply is described separately as two 10 MW feeds with plans to reach two 25 MW feeds; neither figure is tenant utilization.
SourceInfrastructure & permits
Technical details (3)
Energized
Hydropower-backed campus using natural free cooling, two grid supplies and carrier-neutral fiber.
Operational
Cooling and efficiency claims remain limited to operator-described designs; no water use or delivered load is inferred.
Planned or represented
20 MW current feed total
Two 10 MW feeds are planned to expand to two 25 MW feeds; these are electrical supply, not tenant load.
Project map
Public-source research. Plans may change. See Evidence for sources and qualifications.