Green Mountain SVG-Undheim Data Center Campus

Undheim, Rogaland, NorwayUnder construction
Evidence
Planned critical IT
80 MW
Updated
Oct 28, 2026

Green Mountain SVG-Undheim Data Center Campus, also known as Green Mountain SVG-Undheim, is a data center project in Undheim, Rogaland, NO associated with Green Mountain. Two interconnected buildings; 80 MW total IT capacity; 100 MW maximum site capacity; completion scheduled for 2028. Single-tenant AI and HPC campus with renewable hydropower, air and liquid cooling, and heat-reuse design. 80 MW is the source-defined future IT or site design envelope.

Capacity

Reported capacity

Design

80 MW

Source

Reported capacity

Planned / design or future potential

80 MW

Source

Operating IT capacity: Not established in published records

A missing figure does not mean zero. Planned, utility and generation figures are not operating IT capacity.

Development

Development, permitting and phased deliveryUnder construction

80 MW is the source-defined future IT or site design envelope. It is not operating IT load.

Milestones (2)
Construction and approved framework application documented

Aug 30, 2026 · Recorded actual event

Completed · Status changed

Source not linked
Phased completion scheduled during 2028

2028 · Forecast / planned record

Forecast · Forecast completion

Source not linked

Participants

Green Mountain

Developer

Sources by role
Developer (1)

Site & development

Location context

Actual

Green Mountain SVG-Undheim | Undheim | Rogaland | NO

Source

Location context

Actual

Green Mountain SVG-Undheim | Undheim | Rogaland | NO

Source

Building count

Design

2 buildings

Source

Scheduled completion

Forecast

2028

Source

Additional project facts

Lifecycle status

Actual

Construction

Source

Capacity basis

Actual

Green Mountain publishes 80 MW of critical IT capacity for this record boundary.

Source

Lifecycle status

Actual

Construction

Source

Capacity basis

Actual

80 MW is the source defined future IT or site design envelope.

Source

Infrastructure & permits

Technical details (3)
Electric grid

Planned or represented

Single-tenant AI and HPC campus with renewable hydropower, air and liquid cooling, and heat-reuse design.

Cooling system

Planned or represented

Cooling and efficiency claims remain limited to operator-described designs; no water use or delivered load is inferred.

Electric grid

Under construction

100 MW site power

Two independent hydropower-backed supplies support an 80 MW planned IT design.

Other · Issued

SVG-Undheim

Time Municipality

Dec 31, 2021

Sources (1)
Building · Issued

SVG-Undheim

Time Municipality

Aug 30, 2026

Sources (1)

Public-source research. Plans may change. See Evidence for sources and qualifications.