Green Mountain OSL-Enebakk Data Center Campus

PRJ-0774 · Site · Enebakk, Akershus, Norway

Record last updated Oct 28, 2026

Scope and capacity

Green Mountain OSL-Enebakk Data Center Campus, also known as Green Mountain OSL-Enebakk, is a data center project in Enebakk, Akershus, NO associated with Green Mountain. 75,000 square metres; 93 MW line-of-sight total site capacity; multiple completed buildings. Hydropower-backed Oslo-region campus with two grid supplies, carrier-neutral connectivity and phased modular expansion. 93 MW is the future site plan for 2028/29. An independent analysis reports 26.8 MW current site power, but the current figure is not explicitly an IT-capacity measure, so

Headline: 93 MW Planned / design

Numbers refer to their stated physical boundaries and are not added together. Source dates, claim dates and record updates have different meanings. Missing dates and locators are not inferred.

Location context · Green Mountain OSL-Enebakk | Enebakk | Akershus | NO

Actual · Green Mountain OSL-Enebakk Data Center Campus (Project)

Claim 60968 · Recorded claim type: Actual · Review: Approved · Claim date: Not stated

  1. Green Mountain Green Mountain OSL-Enebakk profile

    Green Mountain · Document date: Aug 27, 2026 · Primary

    Source reference: SRC-3335 · Fact sheet · Recorded authority: Official primary

    Source URL

    https://greenmountain.no/data-center/osl-enebakk/

Lifecycle status · Partially operational

Actual · Green Mountain OSL-Enebakk Data Center Campus (Project)

Claim 60969 · Recorded claim type: Actual · Review: Approved · Claim date: Not stated

  1. Green Mountain Green Mountain OSL-Enebakk profile

    Green Mountain · Document date: Aug 27, 2026 · Primary

    Source reference: SRC-3335 · Fact sheet · Recorded authority: Official primary

    Source URL

    https://greenmountain.no/data-center/osl-enebakk/

Reported capacity · 93 MW

Planned / design or future potential · Green Mountain OSL-Enebakk Data Center Campus (Project)

Claim 60970 · Recorded claim type: Design · Review: Approved · Claim date: Not stated

Headline treatment: Selected headline

  1. Green Mountain Green Mountain OSL-Enebakk profile

    Green Mountain · Document date: Aug 27, 2026 · Primary

    Source reference: SRC-3335 · Fact sheet · Recorded authority: Official primary

    Source URL

    https://greenmountain.no/data-center/osl-enebakk/

Capacity basis · Green Mountain publishes 93 MW of line of sight total site capacity; this is not represented as installed IT load.

Actual · Green Mountain OSL-Enebakk Data Center Campus (Project)

Claim 60971 · Recorded claim type: Actual · Review: Approved · Claim date: Not stated

  1. Green Mountain Green Mountain OSL-Enebakk profile

    Green Mountain · Document date: Aug 27, 2026 · Primary

    Source reference: SRC-3335 · Fact sheet · Recorded authority: Official primary

    Source URL

    https://greenmountain.no/data-center/osl-enebakk/

Location context · Green Mountain OSL-Enebakk | Enebakk | Akershus | NO

Actual · Green Mountain OSL-Enebakk Data Center Campus (Project)

Claim 100816 · Recorded claim type: Actual · Review: Approved · Claim date: Not stated

  1. Green Mountain Green Mountain OSL-Enebakk profile

    Green Mountain · Document date: Aug 27, 2026 · Primary

    Source reference: SRC-3335 · Fact sheet · Recorded authority: Official primary

    Source URL

    https://greenmountain.no/data-center/osl-enebakk/

Lifecycle status · Partially operational

Actual · Green Mountain OSL-Enebakk Data Center Campus (Project)

Claim 100817 · Recorded claim type: Actual · Review: Approved · Claim date: Not stated

  1. Green Mountain Green Mountain OSL-Enebakk profile

    Green Mountain · Document date: Aug 27, 2026 · Primary

    Source reference: SRC-3335 · Fact sheet · Recorded authority: Official primary

    Source URL

    https://greenmountain.no/data-center/osl-enebakk/

Planned buildings · 5 buildings

Design · Green Mountain OSL-Enebakk Data Center Campus (Project)

Claim 100823 · Recorded claim type: Design · Review: Approved · Claim date: Not stated

  1. Economic impact of OSL-Enebakk

    Menon Economics / Green Mountain · Document date: Mar 1, 2025 · Primary

    Source reference: SRC-5547 · News report · Recorded authority: Secondary

    Source URL

    https://greenmountain.no/wp-content/uploads/MENON-Rapport-Ringvirkninger-av-Green-Mountain-sitt-datasenter-i-Enebakk_Mars_2025.pdf

Counterparties and capital

Green Mountain · Developer · CMP-1230