Cartis diligence evidence schedule
Green Mountain OSL-Enebakk Data Center Campus
PRJ-0774 · Site · Enebakk, Akershus, Norway
Record last updated Oct 28, 2026
Scope and capacity
Green Mountain OSL-Enebakk Data Center Campus, also known as Green Mountain OSL-Enebakk, is a data center project in Enebakk, Akershus, NO associated with Green Mountain. 75,000 square metres; 93 MW line-of-sight total site capacity; multiple completed buildings. Hydropower-backed Oslo-region campus with two grid supplies, carrier-neutral connectivity and phased modular expansion. 93 MW is the future site plan for 2028/29. An independent analysis reports 26.8 MW current site power, but the current figure is not explicitly an IT-capacity measure, so
Headline: 93 MW Planned / design
Numbers refer to their stated physical boundaries and are not added together. Source dates, claim dates and record updates have different meanings. Missing dates and locators are not inferred.
Claims and exhibit sources
Jump to a claim (7)
Location context · Green Mountain OSL-Enebakk | Enebakk | Akershus | NO
Actual · Green Mountain OSL-Enebakk Data Center Campus (Project)
Claim 60968 · Recorded claim type: Actual · Review: Approved · Claim date: Not stated
- Green Mountain Green Mountain OSL-Enebakk profile
Green Mountain · Document date: Aug 27, 2026 · Primary
Source reference: SRC-3335 · Fact sheet · Recorded authority: Official primary
Source URL
https://greenmountain.no/data-center/osl-enebakk/
https://greenmountain.no/data-center/osl-enebakk/
Lifecycle status · Partially operational
Actual · Green Mountain OSL-Enebakk Data Center Campus (Project)
Claim 60969 · Recorded claim type: Actual · Review: Approved · Claim date: Not stated
- Green Mountain Green Mountain OSL-Enebakk profile
Green Mountain · Document date: Aug 27, 2026 · Primary
Source reference: SRC-3335 · Fact sheet · Recorded authority: Official primary
Source URL
https://greenmountain.no/data-center/osl-enebakk/
https://greenmountain.no/data-center/osl-enebakk/
Reported capacity · 93 MW
Planned / design or future potential · Green Mountain OSL-Enebakk Data Center Campus (Project)
Claim 60970 · Recorded claim type: Design · Review: Approved · Claim date: Not stated
Headline treatment: Selected headline
- Green Mountain Green Mountain OSL-Enebakk profile
Green Mountain · Document date: Aug 27, 2026 · Primary
Source reference: SRC-3335 · Fact sheet · Recorded authority: Official primary
Source URL
https://greenmountain.no/data-center/osl-enebakk/
https://greenmountain.no/data-center/osl-enebakk/
Capacity basis · Green Mountain publishes 93 MW of line of sight total site capacity; this is not represented as installed IT load.
Actual · Green Mountain OSL-Enebakk Data Center Campus (Project)
Claim 60971 · Recorded claim type: Actual · Review: Approved · Claim date: Not stated
- Green Mountain Green Mountain OSL-Enebakk profile
Green Mountain · Document date: Aug 27, 2026 · Primary
Source reference: SRC-3335 · Fact sheet · Recorded authority: Official primary
Source URL
https://greenmountain.no/data-center/osl-enebakk/
https://greenmountain.no/data-center/osl-enebakk/
Location context · Green Mountain OSL-Enebakk | Enebakk | Akershus | NO
Actual · Green Mountain OSL-Enebakk Data Center Campus (Project)
Claim 100816 · Recorded claim type: Actual · Review: Approved · Claim date: Not stated
- Green Mountain Green Mountain OSL-Enebakk profile
Green Mountain · Document date: Aug 27, 2026 · Primary
Source reference: SRC-3335 · Fact sheet · Recorded authority: Official primary
Source URL
https://greenmountain.no/data-center/osl-enebakk/
https://greenmountain.no/data-center/osl-enebakk/
Lifecycle status · Partially operational
Actual · Green Mountain OSL-Enebakk Data Center Campus (Project)
Claim 100817 · Recorded claim type: Actual · Review: Approved · Claim date: Not stated
- Green Mountain Green Mountain OSL-Enebakk profile
Green Mountain · Document date: Aug 27, 2026 · Primary
Source reference: SRC-3335 · Fact sheet · Recorded authority: Official primary
Source URL
https://greenmountain.no/data-center/osl-enebakk/
https://greenmountain.no/data-center/osl-enebakk/
Planned buildings · 5 buildings
Design · Green Mountain OSL-Enebakk Data Center Campus (Project)
Claim 100823 · Recorded claim type: Design · Review: Approved · Claim date: Not stated
- Economic impact of OSL-Enebakk
Menon Economics / Green Mountain · Document date: Mar 1, 2025 · Primary
Source reference: SRC-5547 · News report · Recorded authority: Secondary
Source URL
https://greenmountain.no/wp-content/uploads/MENON-Rapport-Ringvirkninger-av-Green-Mountain-sitt-datasenter-i-Enebakk_Mars_2025.pdf
https://greenmountain.no/wp-content/uploads/MENON-Rapport-Ringvirkninger-av-Green-Mountain-sitt-datasenter-i-Enebakk_Mars_2025.pdf
Counterparties and capital
Green Mountain · Developer · CMP-1230
This schedule captures public Cartis research. It is not a title, lien or legal-opinion report. Document page/section locators and claim review timestamps are included only when published; this version has no separate locator or claim-review-time feed.