Data center siteSite record

Green Mountain OSL-Enebakk Data Center Campus

Enebakk, Akershus, NorwayPartially operational
Capacity
93 MW
Planned / design
Lead participant
Green Mountain
Developer
Last updated
Aug 28, 2026
Most recent public record update

About Green Mountain OSL-Enebakk Data Center Campus

Green Mountain OSL-Enebakk Data Center Campus, also known as Green Mountain OSL-Enebakk, is a data center project in Enebakk, Akershus, NO associated with Green Mountain. 75,000 square metres; 93 MW line-of-sight total site capacity; multiple completed buildings. Hydropower-backed Oslo-region campus with two grid supplies, carrier-neutral connectivity and phased modular expansion. 93 MW is the future site plan for 2028/29. An independent analysis reports 26.8 MW current site power, but the current figure is not explicitly an IT-capacity measure, so

Capacity

Planned / design
Operating capacityAn operating IT-capacity figure has not been publicly disclosed.
Future Potential93 MWDesign · Green Mountain OSL-Enebakk Data Center Campus

Development

1 phases · 2 milestones
Operating facility and documented expansionPartially Operational

93 MW is the future site plan for 2028/29. An independent analysis reports 26.8 MW current site power, but the current figure is not explicitly an IT-capacity measure, so the available public sources do not establish a single project-scoped capacity figure.

Aug 27, 2026
Current source record reviewed for Green Mountain OSL-Enebakk
Completed
Aug 30, 2026
Operating boundary reviewed without inferring tenant utilization
Completed

Infrastructure

Electric GridEnergized

Hydropower-backed Oslo-region campus with two grid supplies, carrier-neutral connectivity and phased modular expansion.

Cooling SystemOperational

Cooling and efficiency claims remain limited to operator-described designs; no water use or delivered load is inferred.

Electric GridPlanned Or Represented

26.8 MW site power

Current site-power measure is not published as IT capacity; two power lines support the campus.

Project map

0 of 1 project point mapped
Infrastructure facts
3
Mapped records
1
Capacity figures
1

No map point available

Power & interconnection: 2Cooling & water: 1

Facts & sources

Published claims and their source links.

7 facts
Location Context
Green Mountain OSL-Enebakk | Enebakk | Akershus | NO
Actual
Lifecycle Status
Partially operational
Actual
Reported Capacity
93 MW
Design
Capacity Basis
Green Mountain publishes 93 MW of line of sight total site capacity; this is not represented as installed IT load.
Actual
Location Context
Green Mountain OSL-Enebakk | Enebakk | Akershus | NO
Actual
Lifecycle Status
Partially operational
Actual
Planned Buildings
5
Design