Meta Hyperion Richland Parish Data Center
Under construction · Rayville, Louisiana, United States
Two combined-cycle generating units at one Richland Parish site; generation asset, not a data center campus. Entergy Franklin Farms Generation Site is in Franklin Farms, LA, US and is a generation site with under construction status. Participants include Entergy Louisiana as utility. Published specifications include 1500 MW onsite generation nameplate. Development comprises Franklin Farms Units 1 and 2 (under construction). Key milestones include Franklin Farms groundbreaking. (2025-12-01) and Franklin Farms target service. (2028-12-31). Permitting includes air construction and operating permits for Franklin Farms Units 1 and 2 (not fully reconciled).
Projects sharing a market, utility, or organization.
Under construction · Rayville, Louisiana, United States
Preconstruction · Waterford site, Louisiana, United States
Two 1x1 combined-cycle units at one generation site.
2 buildings
No public infrastructure records are attached.
No map point available
Published claims and their source links.