Data center siteSite record

Elea SPO2 São Bernardo do Campo

São Bernardo do Campo, SP, BrazilPartially operational
Capacity
120 MW
Planned / design
Lead participant
Elea Data Centers
Operator
Last updated
Aug 26, 2026
Most recent public record update

About Elea SPO2 São Bernardo do Campo

Elea operates SPO2 in São Bernardo do Campo and plans a major expansion. A 2025 public bid awarded Elea a 17-year, R$2.3 billion contract to build a 30 MVA Petrobras data center at the site.

Projects sharing a market, utility, or organization.

1 related

Capacity

Planned / design
Operating capacityAn operating IT-capacity figure has not been publicly disclosed.
Future Potential120 MWActual · Elea SPO2 São Bernardo do Campo

Development

3 phases · 4 milestones
Acquired operating SPO2 facilityOperational

Live capacity not authoritatively disclosed.

1 building

SPO2 expansion envelopePlanned

Future potential; historical 100 MW plan retained separately.

Petrobras 30 MVA buildPlanned

MVA award scope is not live SPO2 IT load.

1 building

Jul 16, 2024
Elea announces acquisition of SPO2 and SPO3
Completed
Sep 30, 2025
Elea wins 30 MVA Petrobras build contract
Completed
Apr 28, 2026
I Squared agrees to acquire Elea
Completed
Jun 3, 2026
Elea confirms acquisition completion
Completed

Infrastructure

Electric GridOperational

Combined >10 MW acquisition figure cannot be allocated to SPO2.

Electric GridPlanned Or Represented

120 MW

Current operator up-to figure; not live capacity.

Electric GridReported Context

Acquisition announcement says SPO2 included a high-voltage substation; rating unresolved.

Electric GridSecured Or Contracted

30 MVA

Commercial award rating; never convert to MW or current site load.

Cooling SystemPlanned Or Represented

Awarded design feature; construction/operation unverified.

Project map

0 of 1 project point mapped
Infrastructure facts
5
Mapped records
1
Capacity figures
2

No map point available

Power & interconnection: 4Cooling & water: 1

Facts & sources

Published claims and their source links.

9 facts
Current Status
Operational and expanding
Actual
Acquired From
DXC Technology
Transaction Scope
Future Expansion Potential
120 MW
Actual
Land Bank
Included in acquisition
Actual
High Voltage Substation
Included in acquisition
Actual
Petrobras Contract Value
2,300,000,000 BRL
Transaction Scope
Petrobras Contract Term
17 years
Actual
Petrobras Build Capacity
30 MVA
Design
Certified Renewable Energy
Operator claim
Actual