CyrusOne MIL1 Milan Data Center Campus
- Planned critical IT
- 27 MW
- Updated
- Oct 28, 2026
CyrusOne announced groundbreaking at MIL1 on March 25, 2026. Its current project page targets the first phase for the third quarter of 2027; planned campus capacity is not operating capacity. CyrusOne MIL1 Milan Data Center Campus, also known as CyrusOne MIL1, is a data center project in Segrate, Lombardy, IT associated with CyrusOne. 18.5-acre site; one three-story building; three 9 MW data halls; 9,000 square metres; 27 MW initial IT capacity. East Milan development with free-cooling, renewable-energy design, heat recovery and phased delivery. The earlier 27 MW figure describes the initial three-hall building scope, not the full campus plan.
Capacity
Operating IT capacity: Not established in published records
A missing figure does not mean zero. Planned, utility and generation figures are not operating IT capacity.
Development
27 MW is the operator-published future facility or full-build design boundary. It is not operating IT load.
Participants
Developer
Sources by role
Developer (1)
- CyrusOne CyrusOne MIL1 profile · Aug 27, 2026 · Primary
Site & development
Development detail
Actual18.5-Acre site; one three story building; three 9 MW data halls; 9,000 square metres; 27 MW initial IT capacity.
SourceAdditional project facts
Capacity basis
ActualCyrusOne publishes 27 MW of critical IT capacity for this record boundary.
SourceCapacity basis
Actual27 MW is the operator published future facility or full build design boundary.
SourceCapacity basis
Actual27 MW is the operator published future facility or full build design boundary.
SourceInfrastructure & permits
Technical details (2)
Planned or represented
East Milan development with free-cooling, renewable-energy design, heat recovery and phased delivery.
Planned or represented
Operator describes resilient cooling; Public sources do not establish water use or delivered capacity beyond the cited project specification.
Project map
Other · Issued
CyrusOne Segrate data center
Comune di Segrate
Aug 29, 2026
Sources (1)
- CyrusOne data center VAS exclusion decree, PDCC 11/24 · Aug 29, 2026 · Primary
Public-source research. Plans may change. See Evidence for sources and qualifications.
Related projects (1)
Under construction · Milan, Lombardy, Italy
Shared participant: CyrusOne · Same market: Lombardy, Italy