CyrusOne LON6 Iver Heath
Dromenagh Farm / Sevenhills Road, Iver Heath, BKM, United KingdomEntitled / Permitted
Capacity
90 MW
Planned / design
Lead participant
CyrusOne
Operator
Last updated
Aug 22, 2026
Most recent public record update
About CyrusOne LON6 Iver Heath
CyrusOne's LON6 campus in Iver Heath has planning permission for a 90 MW IT design across six structures and ten data halls. Its planned Q3 2026 groundbreaking was not confirmed by the cutoff.
Capacity
Planned / designOperating capacity—An operating IT-capacity figure has not been publicly disclosed.
Design90 MWForecast · CyrusOne LON6 Iver Heath
Development
2 phases · 4 milestonesPermitted LON6 full campusAnnounced Or Preconstruction
Six physical structures containing ten 9 MW data halls; no construction start established.
6 buildings
Initial power and first-capacity deliveryPlanned
Delivery sub-phase is not quantified in MW.
Jun 12, 2025
LON6 permission reported
CompletedSep 30, 2026
LON6 groundbreaking target
ForecastJun 30, 2027
LON6 initial power target
ForecastMar 31, 2028
LON6 first-capacity target
ForecastInfrastructure
Electric GridPlanned Or Represented
160 MVA
grid supply — 160 MVA; design.
Renewable Energy SupplyPlanned Or Represented
64 percent regulated office energy
rooftop solar — 64 percent_regulated_office_energy; design target.
Heat ReusePlanned Or Represented
heat export; design capability.
Cooling SystemPlanned Or Represented
air cooled free cooling; design.
Project map
0 of 1 project point mappedInfrastructure facts
4
Mapped records
1
Capacity figures
2
No map point available
Power & interconnection: 2Cooling & water: 2
Facts & sources
Published claims and their source links.
Project StatusFull planning permission; preconstructionPermitted
Full planning permission; preconstruction
Target It Capacity90 MWForecast
90 MW
Technical It Space30,000 sqmForecast
30,000 sqm
Data Hall Count10 countDesign
10 count
Physical Data Center Structures6 countDesign
6 count
Utility Supply Design160 MVADesign
160 MVA
Grid Feed Voltage132 kVActual
132 kV
Planning PermissionFull planning permission in place; conditions/phasing details remainPermitted
Full planning permission in place; conditions/phasing details remain
Planned Investment£>1200000000Transaction Scope
£>1200000000
Biodiversity Net Gain71 percentForecast
71 percent
Planned Tree Planting670 countForecast
670 count
Public Access Green Space18 acresForecast
18 acres
Initial Power Target2027-06Forecast
2027-06