CyrusOne LON2 Heathrow Data Center

Hayes, England, United KingdomOperating / Stabilized
Capacity
14 MW
Planned critical IT
Lead participant
CyrusOne
Developer
Last updated
Aug 28, 2026
Most recent public record update

About CyrusOne LON2 Heathrow Data Center

CyrusOne LON2 Heathrow Data Center, also known as CyrusOne LON2, is a data center project in Hayes, England, GB associated with CyrusOne. Purpose-built two-story facility; 7,484 square metres of technical space; 14 MW IT capacity. Heathrow-area facility with active-active power, chilled-water cooling and diverse carrier connectivity.

Projects sharing a market, utility, or organization.

4 related

Capacity

Planned critical IT
Operating capacityAn operating IT-capacity figure has not been publicly disclosed.
It Load14 MWDesign · CyrusOne LON2 Heathrow Data Center
Design14 MWDesign · CyrusOne LON2 Heathrow Data Center

Development

1 phases · 1 milestones
Operating facility and documented expansionOperational

14 MW is the operator-published facility or campus design boundary. It is not measured tenant utilization or live IT draw.

Aug 27, 2026
Current source record reviewed for CyrusOne LON2
Completed

Infrastructure

Electric GridEnergized

Heathrow-area facility with active-active power, chilled-water cooling and diverse carrier connectivity.

Cooling SystemOperational

Operator describes resilient cooling; Public sources do not establish water use or delivered capacity beyond the cited project specification.

Project map

0 of 1 project point mapped
Infrastructure facts
2
Mapped records
1
Capacity figures
0

No map point available

Power & interconnection: 1Cooling & water: 1

Facts & sources

Published claims and their source links.

13 facts
Location Context
CyrusOne LON2 | Hayes | England | GB
Actual
Lifecycle Status
Operational
Actual
Reported Capacity
14 MW
Design
Capacity Basis
CyrusOne describes LON2 as delivering 14 MW of IT capacity.
Actual
Location Context
CyrusOne LON2 | Hayes | England | GB
Actual
Lifecycle Status
Operating
Actual
Reported Capacity
14 MW
Design
Capacity Basis
14 MW facility or campus design capacity.
Actual
Project Boundary
CyrusOne LON2
Actual
Location Context
Hayes, England, GB
Actual
Lifecycle Status
Operating
Actual
Development Detail
Purpose built two story facility; 7,484 square metres of technical space; 14 MW IT capacity.
Actual
Capacity Basis
14 MW facility or campus design capacity.
Actual