Colt London 4 Data Centre
Under construction · Hayes, England, United Kingdom
Colt London 6, 7 and 8 are three future Hayes facilities intended to add 97 MW. Construction and first-service dates are forward-looking, and neither the older 98 MW figure nor the wider 160 MW campus figure is presented as operating IT. Tenant utilization, contract pricing and undisclosed project financing remain outside the verified public record.
Projects sharing a market, utility, or organization.
Under construction · Hayes, England, United Kingdom
Preconstruction · Hayes, England, United Kingdom
Operating / Stabilized · Hayes, England, United Kingdom
Operating / Stabilized · Hayes, England, United Kingdom
Colt London 6, 7 and 8 are three future Hayes facilities intended to add 97 MW. Construction and first-service dates are forward-looking, and neither the older 98 MW figure nor the wider 160 MW campus figure is presented as operating IT. Tenant utilization, contract pricing and undisclosed project financing remain outside the verified public record.
97 MW
97 MW is the current published addition for three future Hayes buildings, not operating capacity.
Carrier-neutral or resilient fibre connectivity is described for the individual facility.
Cooling architecture supports the stated lifecycle; actual tenant draw and instantaneous load remain undisclosed.
No map point available
Published claims and their source links.