CyrusOne DFW7 is a multi-building data center campus under construction in Fort Worth, Texas. CyrusOne broke ground in April 2025 and initially described roughly 70 MW of IT capacity. In January 2026, CyrusOne and Eolian described a 200 MW campus deployment enabled by existing high-voltage transmission and substation infrastructure at the adjacent Chisholm Grid site. Chisholm Grid itself is a separate 100 MW battery-energy-storage system that began ERCOT commercial operations in 2021. The 70 MW figure describes an initial IT phase, 200 MW describes the data center campus envelope, and the 100 MW BESS is a separate supporting energy asset. Large-scale capacity delivery is expected to begin during 2026.
Projects sharing a market, utility, or organization.
Partially operational · Fort Worth, Texas, United States
Operating / Stabilized · Fort Worth, Texas, United States
Preconstruction · Fort Worth, Texas, United States
Under construction · Fairfield / Freestone Energy Center, Texas, United States
No additional capacity claims are published.
Initial IT capacity around 70 MW.
Campus envelope described at 200 MW; adjacent 100 MW BESS remains a separate energy asset.
DFW7 leverages existing high-voltage transmission and adjacent substation infrastructure at the Chisholm Grid industrial site.
100 MW
Adjacent Chisholm Grid BESS is an operational supporting energy asset and is not part of DFW7 IT capacity.