CyrusOne CHI1–CHI3 Aurora Data Center Campus

Aurora, Illinois, United StatesPartially operational
Capacity
114 MW
Planned critical IT
Lead participant
CyrusOne
Developer
Last updated
Aug 30, 2026
Most recent public record update

About CyrusOne CHI1–CHI3 Aurora Data Center Campus

CyrusOne CHI1–CHI3 Aurora Data Center Campus, also known as CyrusOne Aurora Campus, is a partially operational data center campus in Aurora, IL, US associated with CyrusOne. 16-acre campus; three facilities; 450,000 square feet of technical space; 114 MW total IT capacity. Chicago-area campus with diverse enterprise and financial-services connectivity plus advanced cooling systems. 109 MW is the current operator-published campus IT design across CHI1–CHI3; the prior 114 MW value is superseded.

Projects sharing a market, utility, or organization.

2 related

Capacity

Planned critical IT
Operating capacityAn operating IT-capacity figure has not been publicly disclosed.
It Load114 MWDesign · CyrusOne CHI1–CHI3 Aurora Data Center Campus
Design109 MWDesign · CyrusOne CHI1–CHI3 Aurora Data Center Campus
Design109 MWDesign · CyrusOne CHI1–CHI3 Aurora Data Center Campus

Development

2 phases · 3 milestones
Operating facility and documented expansionOperational

CyrusOne current marketing reports 114 MW for CHI1–CHI3, while the independent Aurora register reports 109 MW. The available public sources do not establish a single project-scoped capacity figure.

Operating facility and documented expansionPartially Operational

109 MW is the current operator-published campus IT design across CHI1–CHI3; the prior 114 MW value is superseded.

Jan 1, 2024
Aurora reviewed a multi-building campus expansion
Completed
Dec 31, 2024
CHI3 built out during 2024
Completed
Aug 30, 2026
Current profile reports 109 MW campus design
Completed

Infrastructure

Electric GridEnergized

Multiple cooling systems, high-density support, secure loading facilities, biometric access and expanded financial-market connectivity.

Cooling SystemOperational

CyrusOne describes closed-loop or air-cooled systems; the profile does not infer facility water use beyond the cited site specification.

Electric GridEnergized

Chicago-area campus with diverse enterprise and financial-services connectivity plus advanced cooling systems.

Cooling SystemOperational

Cooling and efficiency claims remain limited to source-defined designs; no delivered load or water use is inferred.

Project map

0 of 1 project point mapped
Infrastructure facts
4
Mapped records
1
Capacity figures
0

No map point available

Power & interconnection: 2Cooling & water: 2

Facts & sources

Published claims and their source links.

17 facts
Location Context
CyrusOne CHI1–CHI3 | Aurora | IL | US
Actual
Lifecycle Status
Operational
Actual
Reported Capacity
114 MW
Design
Capacity Basis
CyrusOne publishes 114 MW of critical IT capacity for this record boundary.
Actual
Location Context
CyrusOne CHI1–CHI3 | Aurora | IL | US
Actual
Lifecycle Status
Operating
Actual
Technical Area
450,000 square feet
Actual
Campus Area
16 acres
Actual
Built Out In 2024
CHI3
Actual
Location Context
CyrusOne Aurora Campus | Aurora | IL | US
Actual
Lifecycle Status
Partially operational
Actual
Reported Capacity
109 MW
Design
Capacity Basis
109 MW is the current operator published campus IT design across CHI1–CHI3; the prior 114 MW value is superseded.
Actual
Current Campus It Design
109 MW
Design
Facility Count
3 facilities
Proposal
Technical Area
450,000 square feet
Design
Campus Expansion
City reviewed multi building expansion
Actual