PRJ-0990 · Site · Roosendaal, North Brabant, Netherlands

Record last updated Oct 28, 2026

Scope and capacity

Colt Rotterdam is the operating Roosendaal facility. The 15 MW value is described as maximum potential and is therefore kept distinct from installed customer load, alongside more than 20 halls and 11,400 square metres of data-hall space. Tenant utilization, contract pricing and undisclosed project financing remain outside the verified public record.

Headline: 15 MW Planned critical IT

Numbers refer to their stated physical boundaries and are not added together. Source dates, claim dates and record updates have different meanings. Missing dates and locators are not inferred.

Claims and exhibit sources

Jump to a claim (18)

Location context · Colt Rotterdam | Roosendaal | North Brabant | NL

Actual · Colt Rotterdam Data Centre (Project)

Claim 66557 · Recorded claim type: Actual · Review: Approved · Claim date: Not stated

  1. Colt Rotterdam Data Centre official profile

    Colt Data Centre Services · Document date: Aug 28, 2026 · Primary

    Source reference: SRC-3784 · Fact sheet · Recorded authority: Official primary

    Source URL

    https://www.coltdatacentres.net/en-GB/our-locations/data-centre-locations-europe/rotterdam

Lifecycle status · Operating

Actual · Colt Rotterdam Data Centre (Project)

Claim 66558 · Recorded claim type: Actual · Review: Approved · Claim date: Not stated

  1. Colt Rotterdam Data Centre official profile

    Colt Data Centre Services · Document date: Aug 28, 2026 · Primary

    Source reference: SRC-3784 · Fact sheet · Recorded authority: Official primary

    Source URL

    https://www.coltdatacentres.net/en-GB/our-locations/data-centre-locations-europe/rotterdam

Reported capacity · 15 MW

Design · Colt Rotterdam Data Centre (Project)

Claim 66559 · Recorded claim type: Design · Review: Approved · Claim date: Not stated

Headline treatment: Selected headline

  1. Colt Rotterdam Data Centre official profile

    Colt Data Centre Services · Document date: Aug 28, 2026 · Primary

    Source reference: SRC-3784 · Fact sheet · Recorded authority: Official primary

    Source URL

    https://www.coltdatacentres.net/en-GB/our-locations/data-centre-locations-europe/rotterdam

Capacity basis · Colt Data Centre Services publishes 15 MW of IT power for this project boundary.

Actual · Colt Rotterdam Data Centre (Project)

Claim 66560 · Recorded claim type: Actual · Review: Approved · Claim date: Not stated

  1. Colt Rotterdam Data Centre official profile

    Colt Data Centre Services · Document date: Aug 28, 2026 · Primary

    Source reference: SRC-3784 · Fact sheet · Recorded authority: Official primary

    Source URL

    https://www.coltdatacentres.net/en-GB/our-locations/data-centre-locations-europe/rotterdam

Location context · Colt Rotterdam | Roosendaal | North Brabant | NL

Actual · Colt Rotterdam Data Centre (Project)

Claim 84690 · Recorded claim type: Actual · Review: Approved · Claim date: Not stated

  1. Colt Rotterdam Data Centre official profile

    Colt Data Centre Services · Document date: Aug 28, 2026 · Primary

    Source reference: SRC-3784 · Fact sheet · Recorded authority: Official primary

    Source URL

    https://www.coltdatacentres.net/en-GB/our-locations/data-centre-locations-europe/rotterdam

Lifecycle status · Operating

Actual · Colt Rotterdam Data Centre (Project)

Claim 84691 · Recorded claim type: Actual · Review: Approved · Claim date: Not stated

  1. Colt Rotterdam Data Centre official profile

    Colt Data Centre Services · Document date: Aug 28, 2026 · Primary

    Source reference: SRC-3784 · Fact sheet · Recorded authority: Official primary

    Source URL

    https://www.coltdatacentres.net/en-GB/our-locations/data-centre-locations-europe/rotterdam

Reported capacity · 15 MW

Design · Colt Rotterdam Data Centre (Project)

Claim 84692 · Recorded claim type: Design · Review: Approved · Claim date: Not stated

Headline treatment: Separate claim, not added to the headline

  1. Colt Rotterdam Data Centre official profile

    Colt Data Centre Services · Document date: Aug 28, 2026 · Primary

    Source reference: SRC-3784 · Fact sheet · Recorded authority: Official primary

    Source URL

    https://www.coltdatacentres.net/en-GB/our-locations/data-centre-locations-europe/rotterdam

Capacity basis · 15 MW is the operator published facility IT-load boundary; it is not measured customer utilization.

Actual · Colt Rotterdam Data Centre (Project)

Claim 84693 · Recorded claim type: Actual · Review: Approved · Claim date: Not stated

  1. Colt Rotterdam Data Centre official profile

    Colt Data Centre Services · Document date: Aug 28, 2026 · Primary

    Source reference: SRC-3784 · Fact sheet · Recorded authority: Official primary

    Source URL

    https://www.coltdatacentres.net/en-GB/our-locations/data-centre-locations-europe/rotterdam

Operator confirmed · Colt Data Centre Services

Actual · Colt Rotterdam Data Centre (Project)

Claim 84694 · Recorded claim type: Actual · Review: Approved · Claim date: Not stated

  1. Colt Rotterdam Data Centre official profile

    Colt Data Centre Services · Document date: Aug 28, 2026 · Primary

    Source reference: SRC-3784 · Fact sheet · Recorded authority: Official primary

    Source URL

    https://www.coltdatacentres.net/en-GB/our-locations/data-centre-locations-europe/rotterdam

Project location · Roosendaal, North Brabant, NL

Actual · Colt Rotterdam Data Centre (Project)

Claim 84695 · Recorded claim type: Actual · Review: Approved · Claim date: Not stated

  1. Colt Rotterdam Data Centre official profile

    Colt Data Centre Services · Document date: Aug 28, 2026 · Primary

    Source reference: SRC-3784 · Fact sheet · Recorded authority: Official primary

    Source URL

    https://www.coltdatacentres.net/en-GB/our-locations/data-centre-locations-europe/rotterdam

Current lifecycle · Operating

Actual · Colt Rotterdam Data Centre (Project)

Claim 84696 · Recorded claim type: Actual · Review: Approved · Claim date: Not stated

  1. Colt Rotterdam Data Centre official profile

    Colt Data Centre Services · Document date: Aug 28, 2026 · Primary

    Source reference: SRC-3784 · Fact sheet · Recorded authority: Official primary

    Source URL

    https://www.coltdatacentres.net/en-GB/our-locations/data-centre-locations-europe/rotterdam

Capacity classification · It load

Actual · Colt Rotterdam Data Centre (Project)

Claim 84697 · Recorded claim type: Actual · Review: Approved · Claim date: Not stated

  1. Colt Rotterdam Data Centre official profile

    Colt Data Centre Services · Document date: Aug 28, 2026 · Primary

    Source reference: SRC-3784 · Fact sheet · Recorded authority: Official primary

    Source URL

    https://www.coltdatacentres.net/en-GB/our-locations/data-centre-locations-europe/rotterdam

Capacity basis · 15 MW is the operator published facility IT-load boundary; it is not measured customer utilization.

Actual · Colt Rotterdam Data Centre (Project)

Claim 84698 · Recorded claim type: Actual · Review: Approved · Claim date: Not stated

  1. Colt Rotterdam Data Centre official profile

    Colt Data Centre Services · Document date: Aug 28, 2026 · Primary

    Source reference: SRC-3784 · Fact sheet · Recorded authority: Official primary

    Source URL

    https://www.coltdatacentres.net/en-GB/our-locations/data-centre-locations-europe/rotterdam

Customer utilization · Not publicly disclosed

Actual · Colt Rotterdam Data Centre (Project)

Claim 84699 · Recorded claim type: Actual · Review: Approved · Claim date: Not stated

  1. Colt Rotterdam Data Centre official profile

    Colt Data Centre Services · Document date: Aug 28, 2026 · Primary

    Source reference: SRC-3784 · Fact sheet · Recorded authority: Official primary

    Source URL

    https://www.coltdatacentres.net/en-GB/our-locations/data-centre-locations-europe/rotterdam

Identity boundary · This facility or named campus is tracked separately from adjacent buildings and broader operator portfolios

Actual · Colt Rotterdam Data Centre (Project)

Claim 84700 · Recorded claim type: Actual · Review: Approved · Claim date: Not stated

  1. Colt Rotterdam project delivery record

    DOC Elite · Document date: Aug 29, 2026 · Primary

    Source reference: SRC-4759 · Company announcement · Recorded authority: Party primary

    Source URL

    https://www.doc-elite.co.uk/projects-8

Source refresh date · 2026-08-29

Actual · Colt Rotterdam Data Centre (Project)

Claim 84701 · Recorded claim type: Actual · Review: Approved · Claim date: Not stated

  1. Colt Rotterdam Data Centre official profile

    Colt Data Centre Services · Document date: Aug 28, 2026 · Primary

    Source reference: SRC-3784 · Fact sheet · Recorded authority: Official primary

    Source URL

    https://www.coltdatacentres.net/en-GB/our-locations/data-centre-locations-europe/rotterdam

Data hall area · 11,400 square metres

Actual · Colt Rotterdam Data Centre (Project)

Claim 84702 · Recorded claim type: Actual · Review: Approved · Claim date: Not stated

  1. Colt Rotterdam Data Centre official profile

    Colt Data Centre Services · Document date: Aug 28, 2026 · Primary

    Source reference: SRC-3784 · Fact sheet · Recorded authority: Official primary

    Source URL

    https://www.coltdatacentres.net/en-GB/our-locations/data-centre-locations-europe/rotterdam

Data hall count · 20 data halls

Actual · Colt Rotterdam Data Centre (Project)

Claim 84703 · Recorded claim type: Actual · Review: Approved · Claim date: Not stated

  1. Colt Rotterdam Data Centre official profile

    Colt Data Centre Services · Document date: Aug 28, 2026 · Primary

    Source reference: SRC-3784 · Fact sheet · Recorded authority: Official primary

    Source URL

    https://www.coltdatacentres.net/en-GB/our-locations/data-centre-locations-europe/rotterdam

Counterparties and capital

Colt Data Centre Services · Developer · CMP-1483

This schedule captures public Cartis research. It is not a title, lien or legal-opinion report. Document page/section locators and claim review timestamps are included only when published; this version has no separate locator or claim-review-time feed.