Colt London North Data Centre
About Colt London North Data Centre
Colt London North is the operating Welwyn Garden City facility, not a Hayes campus phase. The 35 MW operator boundary is supported by independently documented utility and fibre infrastructure and is not treated as measured utilization. Tenant utilization, contract pricing and undisclosed project financing remain outside the verified public record.
Related projects
Projects sharing a market, utility, or organization.
Colt London 6, 7 and 8 Data Centres
Preconstruction · Hayes, England, United Kingdom
Capacity
Planned critical ITDevelopment
1 phases · 1 milestonesColt London North is the operating Welwyn Garden City facility, not a Hayes campus phase. The 35 MW operator boundary is supported by independently documented utility and fibre infrastructure and is not treated as measured utilization. Tenant utilization, contract pricing and undisclosed project financing remain outside the verified public record.
Infrastructure
35 MW
35 MW is the operator-published facility IT-load boundary; it is not measured customer utilization.
Carrier-neutral or resilient fibre connectivity is described for the individual facility.
Cooling architecture supports the stated lifecycle; actual tenant draw and instantaneous load remain undisclosed.
Project map
0 of 1 project point mappedNo map point available
Facts & sources
Published claims and their source links.