Skip to content
All records
Data center siteSite record

Colt London North Data Centre

Welwyn Garden City, England, United KingdomOperating / Stabilized
Capacity
35 MW
Planned critical IT
Lead participant
Colt Data Centre Services
Developer
Last updated
Aug 28, 2026
Most recent public record update

About Colt London North Data Centre

Colt London North is the operating Welwyn Garden City facility, not a Hayes campus phase. The 35 MW operator boundary is supported by independently documented utility and fibre infrastructure and is not treated as measured utilization. Tenant utilization, contract pricing and undisclosed project financing remain outside the verified public record.

Projects sharing a market, utility, or organization.

3 related

Capacity

Planned critical IT
Operating capacityAn operating IT-capacity figure has not been publicly disclosed.
It Load35 MWDesign · Colt London North Data Centre
It Load35 MWDesign · Colt London North Data Centre

Development

1 phases · 1 milestones
Operating facility and documented expansionOperational

Colt London North is the operating Welwyn Garden City facility, not a Hayes campus phase. The 35 MW operator boundary is supported by independently documented utility and fibre infrastructure and is not treated as measured utilization. Tenant utilization, contract pricing and undisclosed project financing remain outside the verified public record.

Aug 29, 2026
Project-specific source review refreshed
Completed

Infrastructure

Electric GridOperational

35 MW

35 MW is the operator-published facility IT-load boundary; it is not measured customer utilization.

FiberOperational

Carrier-neutral or resilient fibre connectivity is described for the individual facility.

Cooling SystemOperational

Cooling architecture supports the stated lifecycle; actual tenant draw and instantaneous load remain undisclosed.

Project map

0 of 1 project point mapped
Infrastructure facts
3
Mapped records
1
Capacity figures
1

No map point available

Power & interconnection: 1Cooling & water: 1Fiber & connectivity: 1

Facts & sources

Published claims and their source links.

18 facts
Location Context
Colt London North | Welwyn Garden City | England | GB
Actual
Lifecycle Status
Operating
Actual
Reported Capacity
35 MW
Design
Capacity Basis
Colt Data Centre Services publishes 35 MW of IT power for this project boundary.
Actual
Location Context
Colt London North | Welwyn Garden City | England | GB
Actual
Lifecycle Status
Operating
Actual
Reported Capacity
35 MW
Design
Capacity Basis
35 MW is the operator published facility IT-load boundary; it is not measured customer utilization.
Actual
Operator Confirmed
Colt Data Centre Services
Actual
Project Location
Welwyn Garden City, England, GB
Actual
Current Lifecycle
Operating
Actual
Capacity Classification
It load
Actual
Capacity Basis
35 MW is the operator published facility IT-load boundary; it is not measured customer utilization.
Actual
Customer Utilization
Not publicly disclosed
Actual
Identity Boundary
This facility or named campus is tracked separately from adjacent buildings and broader operator portfolios
Actual
Source Refresh Date
2026-08-29
Actual
Gross Technical Area
21,339 square metres
Actual
Onsite Substations
2 substations
Actual