Cartis diligence evidence schedule
Cloverleaf Infrastructure Troy Campus
PRJ-1164 · Site · Troy, Illinois, United States
Record last updated Oct 28, 2026
Scope and capacity
Troy’s February 2, 2026 council minutes record the mayor’s statement that the original Route 162/US 40 site was off the table and a southern alternative was again being explored. This is a site-specific change, not approval of a replacement site or cancellation of all potential development in Troy. Cloverleaf’s Project Beacon was initially presented as a proposed 500 MW data-center campus in Troy, Illinois. The earlier concept plans showed either a six-building Phase 1 on about 165 acres or a four-building full-build layout on roughly 275 acres; no formal application had been filed when the project was first presented, and zoning and utility approvals remain required.
Headline: 500 MW Planned / design
Numbers refer to their stated physical boundaries and are not added together. Source dates, claim dates and record updates have different meanings. Missing dates and locators are not inferred.
Claims and exhibit sources
Jump to a claim (7)
Location context · Cloverleaf Infrastructure Troy Campus | Troy | Illinois | US
Actual · Cloverleaf Infrastructure Troy Campus (Project)
Claim 71978 · Recorded claim type: Actual · Review: Approved · Claim date: Not stated
- Cloverleaf Infrastructure Troy Campus public-record research record
US Data Center Map · Document date: Aug 28, 2026 · Primary
Source reference: SRC-4153 · News report · Recorded authority: Secondary
Source URL
https://dcmap.us/states/illinois/
https://dcmap.us/states/illinois/
Lifecycle status · Proposed
Actual · Cloverleaf Infrastructure Troy Campus (Project)
Claim 71979 · Recorded claim type: Actual · Review: Approved · Claim date: Not stated
- Cloverleaf Infrastructure Troy Campus public-record research record
US Data Center Map · Document date: Aug 28, 2026 · Primary
Source reference: SRC-4153 · News report · Recorded authority: Secondary
Source URL
https://dcmap.us/states/illinois/
https://dcmap.us/states/illinois/
Reported capacity · 500 MW
Planned / design or future potential · Cloverleaf Infrastructure Troy Campus (Project)
Claim 71980 · Recorded claim type: Design · Review: Approved · Claim date: Not stated
Headline treatment: Selected headline
- Cloverleaf Infrastructure Troy Campus public-record research record
US Data Center Map · Document date: Aug 28, 2026 · Primary
Source reference: SRC-4153 · News report · Recorded authority: Secondary
Source URL
https://dcmap.us/states/illinois/
https://dcmap.us/states/illinois/
Capacity basis · 500 MW future full build site capacity; not measured operating IT load.
Actual · Cloverleaf Infrastructure Troy Campus (Project)
Claim 71981 · Recorded claim type: Actual · Review: Approved · Claim date: Not stated
- Cloverleaf Infrastructure Troy Campus public-record research record
US Data Center Map · Document date: Aug 28, 2026 · Primary
Source reference: SRC-4153 · News report · Recorded authority: Secondary
Source URL
https://dcmap.us/states/illinois/
https://dcmap.us/states/illinois/
Public project name · Project Beacon
Actual · Cloverleaf Infrastructure Troy Campus (Project)
Claim 77965 · Recorded claim type: Actual · Review: Approved · Claim date: Not stated
- Project Beacon public meeting notice
City of Troy · Document date: Feb 10, 2026 · Primary
Source reference: SRC-4477 · Government record · Recorded authority: Official primary
Source URL
https://www.troyil.us/DocumentCenter/View/2056/Data-Centers-Informational-Meeting-21026
https://www.troyil.us/DocumentCenter/View/2056/Data-Centers-Informational-Meeting-21026
Full build site area · 275 acres
Reported rounded · Cloverleaf Infrastructure Troy Campus (Project)
Claim 77966 · Recorded claim type: Reported rounded · Review: Approved · Claim date: Not stated
- Cloverleaf proposes Troy campus
Data Center Dynamics · Document date: Jan 27, 2026 · Primary
Source reference: SRC-4478 · News report · Recorded authority: Secondary
Source URL
https://www.datacenterdynamics.com/en/news/cloverleaf-infrastructure-proposes-data-center-campus-near-st-louis-missouri/
https://www.datacenterdynamics.com/en/news/cloverleaf-infrastructure-proposes-data-center-campus-near-st-louis-missouri/
Phase one buildings · 6 buildings
Reported rounded · Cloverleaf Infrastructure Troy Campus (Project)
Claim 77967 · Recorded claim type: Reported rounded · Review: Approved · Claim date: Not stated
- Cloverleaf proposes Troy campus
Data Center Dynamics · Document date: Jan 27, 2026 · Primary
Source reference: SRC-4478 · News report · Recorded authority: Secondary
Source URL
https://www.datacenterdynamics.com/en/news/cloverleaf-infrastructure-proposes-data-center-campus-near-st-louis-missouri/
https://www.datacenterdynamics.com/en/news/cloverleaf-infrastructure-proposes-data-center-campus-near-st-louis-missouri/
Counterparties and capital
Cloverleaf Infrastructure · Developer · CMP-1540
This schedule captures public Cartis research. It is not a title, lien or legal-opinion report. Document page/section locators and claim review timestamps are included only when published; this version has no separate locator or claim-review-time feed.