Scope and capacity

Troy’s February 2, 2026 council minutes record the mayor’s statement that the original Route 162/US 40 site was off the table and a southern alternative was again being explored. This is a site-specific change, not approval of a replacement site or cancellation of all potential development in Troy. Cloverleaf’s Project Beacon was initially presented as a proposed 500 MW data-center campus in Troy, Illinois. The earlier concept plans showed either a six-building Phase 1 on about 165 acres or a four-building full-build layout on roughly 275 acres; no formal application had been filed when the project was first presented, and zoning and utility approvals remain required.

Headline: 500 MW Planned / design

Numbers refer to their stated physical boundaries and are not added together. Source dates, claim dates and record updates have different meanings. Missing dates and locators are not inferred.

Location context · Cloverleaf Infrastructure Troy Campus | Troy | Illinois | US

Actual · Cloverleaf Infrastructure Troy Campus (Project)

Claim 71978 · Recorded claim type: Actual · Review: Approved · Claim date: Not stated

  1. Cloverleaf Infrastructure Troy Campus public-record research record

    US Data Center Map · Document date: Aug 28, 2026 · Primary

    Source reference: SRC-4153 · News report · Recorded authority: Secondary

    Source URL

    https://dcmap.us/states/illinois/

Lifecycle status · Proposed

Actual · Cloverleaf Infrastructure Troy Campus (Project)

Claim 71979 · Recorded claim type: Actual · Review: Approved · Claim date: Not stated

  1. Cloverleaf Infrastructure Troy Campus public-record research record

    US Data Center Map · Document date: Aug 28, 2026 · Primary

    Source reference: SRC-4153 · News report · Recorded authority: Secondary

    Source URL

    https://dcmap.us/states/illinois/

Reported capacity · 500 MW

Planned / design or future potential · Cloverleaf Infrastructure Troy Campus (Project)

Claim 71980 · Recorded claim type: Design · Review: Approved · Claim date: Not stated

Headline treatment: Selected headline

  1. Cloverleaf Infrastructure Troy Campus public-record research record

    US Data Center Map · Document date: Aug 28, 2026 · Primary

    Source reference: SRC-4153 · News report · Recorded authority: Secondary

    Source URL

    https://dcmap.us/states/illinois/

Capacity basis · 500 MW future full build site capacity; not measured operating IT load.

Actual · Cloverleaf Infrastructure Troy Campus (Project)

Claim 71981 · Recorded claim type: Actual · Review: Approved · Claim date: Not stated

  1. Cloverleaf Infrastructure Troy Campus public-record research record

    US Data Center Map · Document date: Aug 28, 2026 · Primary

    Source reference: SRC-4153 · News report · Recorded authority: Secondary

    Source URL

    https://dcmap.us/states/illinois/

Public project name · Project Beacon

Actual · Cloverleaf Infrastructure Troy Campus (Project)

Claim 77965 · Recorded claim type: Actual · Review: Approved · Claim date: Not stated

  1. Project Beacon public meeting notice

    City of Troy · Document date: Feb 10, 2026 · Primary

    Source reference: SRC-4477 · Government record · Recorded authority: Official primary

    Source URL

    https://www.troyil.us/DocumentCenter/View/2056/Data-Centers-Informational-Meeting-21026

Full build site area · 275 acres

Reported rounded · Cloverleaf Infrastructure Troy Campus (Project)

Claim 77966 · Recorded claim type: Reported rounded · Review: Approved · Claim date: Not stated

  1. Cloverleaf proposes Troy campus

    Data Center Dynamics · Document date: Jan 27, 2026 · Primary

    Source reference: SRC-4478 · News report · Recorded authority: Secondary

    Source URL

    https://www.datacenterdynamics.com/en/news/cloverleaf-infrastructure-proposes-data-center-campus-near-st-louis-missouri/

Phase one buildings · 6 buildings

Reported rounded · Cloverleaf Infrastructure Troy Campus (Project)

Claim 77967 · Recorded claim type: Reported rounded · Review: Approved · Claim date: Not stated

  1. Cloverleaf proposes Troy campus

    Data Center Dynamics · Document date: Jan 27, 2026 · Primary

    Source reference: SRC-4478 · News report · Recorded authority: Secondary

    Source URL

    https://www.datacenterdynamics.com/en/news/cloverleaf-infrastructure-proposes-data-center-campus-near-st-louis-missouri/

Counterparties and capital

Cloverleaf Infrastructure · Developer · CMP-1540