CalEthos Campus Site 2
- Headline capacity
- Not established in published records
- Updated
- Oct 28, 2026
This second CalEthos/TerraVolt record is not supported as a separate 500 MW Calipatria campus. TerraVolt is the renamed CalEthos corporate platform, while company filings described one 300 MW Imperial County campus. Available public evidence does not support this as a separate campus, and its relationship to the documented project remains unresolved.
Capacity
Operating IT capacity: Not established in published records
A missing figure does not mean zero. Planned, utility and generation figures are not operating IT capacity.
Development
This second CalEthos/TerraVolt record is not supported as a separate 500 MW Calipatria campus. TerraVolt is the renamed CalEthos corporate platform, while company filings described one 300 MW Imperial County campus. Available public evidence does not support this as a separate campus, and its relationship to the documented project remains unresolved.
Milestones (1)
May 2026 · Recorded actual event
Completed · Status changed
Source not linkedParticipants
Developer
Sources by role
Developer (1)
- CalEthos Campus Site 2 public-record research record · Aug 28, 2026 · Primary
Site & development
Additional project facts
Infrastructure & permits
Technical details (1)
Potential or planned
300 MW
Historical single-campus design only; not attributable to a second site.
Project map
Public-source research. Plans may change. See Evidence for sources and qualifications.
Related projects (1)
Delayed · Calipatria, California, United States
Same locality: Calipatria
Compare in a collection