Data center siteSite record

Bitdeer Tydal AI Data Center

Tydal, Trøndelag, NorwayUnder construction
Capacity
121 MW
Contracted
Lead participant
Bitdeer Technologies Group
Developer
Last updated
Aug 27, 2026
Most recent public record update

About Bitdeer Tydal AI Data Center

Bitdeer is converting and expanding its Tydal campus in Norway under a 16-year AI/HPC colocation lease. The contracted program covers 121 MW of critical IT load supported by about 133 MW gross capacity, with another 47 MW gross reserved for later expansion. Bitdeer Technologies Group, Data Center Installations AS is associated with the development in Tydal, Tydal Municipality, Trøndelag, NO. The disclosed development scope includes 121 MW contracted critical IT; approximately 133 MW gross support capacity; 47 MW gross future expansion; first phase targeted by year-end 2026. Power and physical infrastructure include hydropower-backed campus using NVIDIA Vera Rubin reference architecture across four leased data halls. A 16-year colocation lease covers 121 MW of critical IT load. The 16-year lease has a stated base value of approximately $4.7 billion, with extension options described separately.

Capacity

Contracted
Operating capacityAn operating IT-capacity figure has not been publicly disclosed.
Design180 MWDesign · Bitdeer Tydal AI Data Center
Contracted Supply121 MWActual · Bitdeer Tydal AI Data Center

Development

1 phases · 2 milestones
Construction programUnder Construction

Project-wide phase for Bitdeer Tydal AI Data Center; capacity class is contracted supply.

Mar 30, 2026
Tydal Data Center Norway development disclosed
Completed
Construction underway under a 16-year AI/HPC colocation lease
Forecast

Infrastructure

Electric GridPlanned Or Represented

121 MW

A 16-year colocation lease covers 121 MW of critical IT load.

Site FacilityPlanned Or Represented

Hydropower-backed campus using NVIDIA Vera Rubin reference architecture across four leased data halls.

Project map

0 of 1 project point mapped
Infrastructure facts
2
Mapped records
1
Capacity figures
1

No map point available

Power & interconnection: 1Site systems: 1

Facts & sources

Published claims and their source links.

12 facts
Location Context
Tydal Data Center | Tydal | Trøndelag | Norway
Actual
Lifecycle Status
Construction
Actual
Reported Capacity
180 MW
Design
Capacity Basis
Bitdeer states 180 MW of gross installed capacity for the converted facility.
Actual
Location Context
Tydal Data Center | Tydal | Trøndelag | Norway
Actual
Lifecycle Status
Construction
Actual
Reported Capacity
121 MW
Actual
Capacity Basis
A 16-year colocation lease covers 121 MW of critical IT load.
Actual
Development Scale
121 MW contracted critical IT
Actual
Development Milestone
Approximately 133 MW gross support capacity
Actual
Power Arrangement
47 MW gross future expansion
Actual
Site Configuration
First phase targeted by year end 2026.
Actual