Skip to content
All records
Data center siteSite record

Bitdeer Clarington AI Data Center Campus

Clarington, Ohio, United StatesPreconstruction
Capacity
570 MW
Contracted
Lead participant
Bitdeer Technologies Group
Developer
Last updated
Aug 27, 2026
Most recent public record update

About Bitdeer Clarington AI Data Center Campus

Bitdeer is preparing its Clarington, Ohio site for colocation development. The company reports 570 MW of power under contract, while timing remains exposed to permitting and ongoing legal proceedings. Bitdeer Technologies Group is publicly identified in the project record for Clarington, Monroe County area, OH, US. The disclosed development record includes 570 MW utility power under contract; design and preparation underway; construction timing not fixed. Power and infrastructure include large contracted-power site being prepared for colocation infrastructure. Bitdeer reports 570 MW of power under contract with a local utility.

Capacity

Contracted
Operating capacityAn operating IT-capacity figure has not been publicly disclosed.
Contracted Supply570 MWActual · Bitdeer Clarington AI Data Center Campus

Development

1 phases · 2 milestones
Development programAnnounced Or Preconstruction

Project-wide phase for Bitdeer Clarington AI Data Center Campus; capacity remains classified as contracted supply.

May 12, 2026
Bitdeer Clarington project status and capacity disclosed
Completed
Design and preparation underway; power under contract
Forecast

Infrastructure

Electric GridPlanned Or Represented

570 MW

Bitdeer reports 570 MW of power under contract with a local utility.

Site FacilityPlanned Or Represented

Large contracted-power site being prepared for colocation infrastructure.

Project map

0 of 1 project point mapped
Infrastructure facts
2
Mapped records
1
Capacity figures
1

No map point available

Power & interconnection: 1Site systems: 1

Facts & sources

Published claims and their source links.

8 facts
Location Context
Bitdeer campus | Clarington | Ohio
Actual
Lifecycle Status
Preconstruction
Actual
Reported Capacity
570 MW
Actual
Capacity Basis
Bitdeer reports 570 MW of power under contract with a local utility.
Actual
Development Scale
570 MW utility power under contract
Actual
Development Milestone
Design and preparation underway
Actual
Power Arrangement
Construction timing not fixed.
Actual
Boundary Context
Bitdeer campus | Clarington | Ohio
Actual