Bitdeer Clarington AI Data Center Campus
- Contracted
- 570 MW
- Updated
- Oct 28, 2026
Bitdeer is preparing its Clarington, Ohio site for colocation development. The company reports 570 MW of power under contract, while timing remains exposed to permitting and ongoing legal proceedings. Bitdeer Technologies Group is publicly identified in the project record for Clarington, Monroe County area, OH, US. The disclosed development record includes 570 MW utility power under contract; design and preparation underway; construction timing not fixed. Power and infrastructure include large contracted-power site being prepared for colocation infrastructure. Bitdeer reports 570 MW of power under contract with a local utility.
Capacity
Operating IT capacity: Not established in published records
A missing figure does not mean zero. Planned, utility and generation figures are not operating IT capacity.
Development
Project-wide phase for Bitdeer Clarington AI Data Center Campus; capacity remains classified as contracted supply.
Milestones (2)
May 12, 2026 · Recorded actual event
Completed · Announced
Source not linkedDate not disclosed · Forecast / planned record
Forecast · Forecast completion
Source not linkedParticipants
Developer
Sources by role
Developer (1)
- Bitdeer first-quarter 2026 results — infrastructure summary · May 12, 2026 · Primary
Site & development
Technical specifications
Additional project facts
Infrastructure & permits
Technical details (2)
Planned or represented
570 MW
Bitdeer reports 570 MW of power under contract with a local utility.
Planned or represented
Large contracted-power site being prepared for colocation infrastructure.