Bitdeer Clarington AI Data Center Campus
About Bitdeer Clarington AI Data Center Campus
Bitdeer is preparing its Clarington, Ohio site for colocation development. The company reports 570 MW of power under contract, while timing remains exposed to permitting and ongoing legal proceedings. Bitdeer Technologies Group is publicly identified in the project record for Clarington, Monroe County area, OH, US. The disclosed development record includes 570 MW utility power under contract; design and preparation underway; construction timing not fixed. Power and infrastructure include large contracted-power site being prepared for colocation infrastructure. Bitdeer reports 570 MW of power under contract with a local utility.
Capacity
ContractedDevelopment
1 phases · 2 milestonesProject-wide phase for Bitdeer Clarington AI Data Center Campus; capacity remains classified as contracted supply.
Infrastructure
570 MW
Bitdeer reports 570 MW of power under contract with a local utility.
Large contracted-power site being prepared for colocation infrastructure.
Project map
0 of 1 project point mappedNo map point available
Facts & sources
Published claims and their source links.