Big Digital Energy Texas Load House Campus
PRJ-0713 · Site · Texas, United States
Captured 2026-09-06T04:13:42.966Z · Record last updated 2026-08-27
SHA-256: ab987f0d8d6db248975cfcabbb29dd847a6deb148c2d5477e6750297a963f795
Save a diligence baseline
Download the public evidence as it appears now. Compare a previously saved snapshot to see added, removed and changed claims, counterparties, financing and milestones. Files are read in this browser and are not uploaded.
The fingerprint detects file changes; it is not a digital signature or a claim of independently verified authenticity. Keep your downloaded copy with the transaction file.
Scope and capacity
Big Digital Energy describes Texas Load House as an operating power and digital-infrastructure site being positioned for AI data-center development. The site has 17 MW operating and 111.6 MW of identified grid headroom. Big Digital Energy is associated with the development in Texas location undisclosed, TX, US. The disclosed development scope includes 17 MW operating; 111.6 MW identified grid headroom; more than 300 MW longer-term site potential. Power and physical infrastructure include existing energized site with a staged power-expansion plan. The company presentation identifies 17 MW of operating power at Texas Load House. The joint venture acquired 30 acres for about $10 million and holds an option for the remainder of the 50-acre site.
Headline: 17 MW Utility capacity
Numbers refer to their stated physical boundaries and are not added together. Source dates, claim dates and record updates have different meanings. Missing dates and locators are not inferred.
Claims and exhibit sources
Location Context · Texas Load House | Texas | precise boundary undisclosed
actual · Big Digital Energy Texas Load House Campus (project)
Claim 57992 · Review: Approved · Claim date: Not published
- Big Digital Energy investor presentation
Big Digital Energy · Document date: 2026-07-28 · Primary
https://www.sec.gov/Archives/edgar/data/1218683/000121390026075248/ea029690001ex99-2.htm
Lifecycle Status · Partially operational
actual · Big Digital Energy Texas Load House Campus (project)
Claim 57993 · Review: Approved · Claim date: Not published
- Big Digital Energy investor presentation
Big Digital Energy · Document date: 2026-07-28 · Primary
https://www.sec.gov/Archives/edgar/data/1218683/000121390026075248/ea029690001ex99-2.htm
Operating Capacity · 17 MW
actual · Big Digital Energy Texas Load House Campus (project)
Claim 57994 · Review: Approved · Claim date: Not published
Headline treatment: Separate claim, not added to the headline
- Big Digital Energy investor presentation
Big Digital Energy · Document date: 2026-07-28 · Primary
https://www.sec.gov/Archives/edgar/data/1218683/000121390026075248/ea029690001ex99-2.htm
Capacity Basis · The company presentation identifies 17 MW of operating power at Texas Load House.
actual · Big Digital Energy Texas Load House Campus (project)
Claim 57995 · Review: Approved · Claim date: Not published
- Big Digital Energy investor presentation
Big Digital Energy · Document date: 2026-07-28 · Primary
https://www.sec.gov/Archives/edgar/data/1218683/000121390026075248/ea029690001ex99-2.htm
Location Context · Texas Load House | Texas | precise boundary undisclosed
actual · Big Digital Energy Texas Load House Campus (project)
Claim 111479 · Review: Approved · Claim date: Not published
- Big Digital Energy investor presentation
Big Digital Energy · Document date: 2026-07-28 · Primary
https://www.sec.gov/Archives/edgar/data/1218683/000121390026075248/ea029690001ex99-2.htm
Lifecycle Status · Partially operational
actual · Big Digital Energy Texas Load House Campus (project)
Claim 111480 · Review: Approved · Claim date: Not published
- Big Digital Energy investor presentation
Big Digital Energy · Document date: 2026-07-28 · Primary
https://www.sec.gov/Archives/edgar/data/1218683/000121390026075248/ea029690001ex99-2.htm
Operating Capacity · 17 MW
actual · Big Digital Energy Texas Load House Campus (project)
Claim 111481 · Review: Approved · Claim date: Not published
Headline treatment: Selected headline
- Big Digital Energy investor presentation
Big Digital Energy · Document date: 2026-07-28 · Primary
https://www.sec.gov/Archives/edgar/data/1218683/000121390026075248/ea029690001ex99-2.htm
Capacity Basis · The company presentation identifies 17 MW of operating power at Texas Load House.
actual · Big Digital Energy Texas Load House Campus (project)
Claim 111482 · Review: Approved · Claim date: Not published
- Big Digital Energy investor presentation
Big Digital Energy · Document date: 2026-07-28 · Primary
https://www.sec.gov/Archives/edgar/data/1218683/000121390026075248/ea029690001ex99-2.htm
Development Scale · 17 MW operating
actual · Big Digital Energy Texas Load House Campus (project)
Claim 111499 · Review: Approved · Claim date: Not published
- Big Digital Energy quarter ended June 2026 Form 10-Q
Big Digital Energy · Document date: 2026-08-14 · Corroborating
https://www.sec.gov/Archives/edgar/data/1218683/000121390026089986/ea0299976-10q_bigdigital.htm - Big Digital Energy investor presentation
Big Digital Energy · Document date: 2026-07-28 · Primary
https://www.sec.gov/Archives/edgar/data/1218683/000121390026075248/ea029690001ex99-2.htm
Development Milestone · 111.6 MW identified grid headroom
actual · Big Digital Energy Texas Load House Campus (project)
Claim 111500 · Review: Approved · Claim date: Not published
- Big Digital Energy quarter ended June 2026 Form 10-Q
Big Digital Energy · Document date: 2026-08-14 · Corroborating
https://www.sec.gov/Archives/edgar/data/1218683/000121390026089986/ea0299976-10q_bigdigital.htm - Big Digital Energy investor presentation
Big Digital Energy · Document date: 2026-07-28 · Primary
https://www.sec.gov/Archives/edgar/data/1218683/000121390026075248/ea029690001ex99-2.htm
Power Arrangement · More than 300 MW longer term site potential.
Planned / design or future potential · Big Digital Energy Texas Load House Campus (project)
Claim 111501 · Review: Approved · Claim date: Not published
- Big Digital Energy quarter ended June 2026 Form 10-Q
Big Digital Energy · Document date: 2026-08-14 · Corroborating
https://www.sec.gov/Archives/edgar/data/1218683/000121390026089986/ea0299976-10q_bigdigital.htm - Big Digital Energy investor presentation
Big Digital Energy · Document date: 2026-07-28 · Primary
https://www.sec.gov/Archives/edgar/data/1218683/000121390026075248/ea029690001ex99-2.htm
Site Configuration · Texas Load House | Texas | precise boundary undisclosed
actual · Big Digital Energy Texas Load House Campus (project)
Claim 111502 · Review: Approved · Claim date: Not published
- Big Digital Energy quarter ended June 2026 Form 10-Q
Big Digital Energy · Document date: 2026-08-14 · Corroborating
https://www.sec.gov/Archives/edgar/data/1218683/000121390026089986/ea0299976-10q_bigdigital.htm - Big Digital Energy investor presentation
Big Digital Energy · Document date: 2026-07-28 · Primary
https://www.sec.gov/Archives/edgar/data/1218683/000121390026075248/ea029690001ex99-2.htm
Counterparties and capital
Big Digital Energy · Operator · CMP-1453
$10,000,000 · 2026-07-15
Acquisition of the initial 30-acre Hood County parcel.
Big Digital Energy (Sponsor)
Financing record 215; claim-specific source links appear in the exhibit sources where published.
This schedule captures public Cartis research. It is not a title, lien or legal-opinion report. Document page/section locators and claim review timestamps are included only when published; this version has no separate locator or claim-review-time feed. Downloaded snapshots are retained by you; Cartis does not archive them automatically.