Big Digital Energy Texas Load House Campus
About Big Digital Energy Texas Load House Campus
Big Digital Energy describes Texas Load House as an operating power and digital-infrastructure site being positioned for AI data center development. The site has 17 MW operating and 111.6 MW of identified grid headroom. Big Digital Energy is associated with the development in Texas location undisclosed, TX, US. The disclosed development scope includes 17 MW operating; 111.6 MW identified grid headroom; more than 300 MW longer-term site potential. Power and physical infrastructure include existing energized site with a staged power-expansion plan. The company presentation identifies 17 MW of operating power at Texas Load House. The joint venture acquired 30 acres for about $10 million and holds an option for the remainder of the 50-acre site.
Capacity
Utility capacityDevelopment
1 phases · 2 milestonesProject-wide phase for Big Digital Energy Texas Load House Campus; capacity class is utility service.
Infrastructure
17 MW
The company presentation identifies 17 MW of operating power at Texas Load House.
Existing energized site with a staged power-expansion plan.
Project map
0 of 1 project point mappedNo map point available
Facts & sources
Published claims and their source links.