AVAIO Digital Hercules Campus
Appomattox, Virginia, United StatesPreconstruction
Capacity
1,000 MW
Planned critical IT
Lead participant
AVAIO Digital
Developer
Last updated
Aug 27, 2026
Most recent public record update
About AVAIO Digital Hercules Campus
AVAIO Digital is developing the Hercules campus in Appomattox County, Virginia as an approximately $3 billion project. The power design combines about 300 MW of grid service with as much as 700 MW of behind-the-meter generation for a 1 GW baseload envelope. That figure describes the site power design, not IT capacity.
Capacity
Planned critical ITOperating capacity—An operating IT-capacity figure has not been publicly disclosed.
It Load1,000 MWDesign · AVAIO Digital Hercules Campus
Utility Service1,000 MWDesign · AVAIO Digital Hercules Campus
Utility Service1,000 MW combined grid and behind the meter power designActual · AVAIO Digital Hercules Campus
Development
1 phases · 2 milestonesDevelopment programAnnounced Or Preconstruction
AVAIO Digital Hercules Campus: Development program.
—
AVAIO Digital Hercules Campus — Development program
In Progress—
AVAIO Digital is developing the Hercules campus in Appomattox County, Virginia as an approximately $3 billion project.
In ProgressInfrastructure
Utility ServicePlanned Or Represented
1,000 MW
1,000 MW combined grid and behind-the-meter power design
Site FacilityPlanned Or Represented
That figure describes the site power design, not IT capacity.
Project map
0 of 1 project point mappedInfrastructure facts
2
Mapped records
1
Capacity figures
1
No map point available
Power & interconnection: 1Site systems: 1
Facts & sources
Published claims and their source links.
Location ContextHercules campus | Appomattox | Virginia | United StatesActual
Hercules campus | Appomattox | Virginia | United States
Lifecycle StatusPreconstructionActual
Preconstruction
Reported Capacity1,000 MWDesign
1,000 MW
Capacity BasisSource stated total baseload power design, not critical IT loadActual
Source stated total baseload power design, not critical IT load
Project IdentityAVAIO Digital Hercules CampusActual
AVAIO Digital Hercules Campus
Lifecycle StatusDevelopment programActual
Development program
LocationAppomattox, Appomattox County, VA, USActual
Appomattox, Appomattox County, VA, US
Participant RolesAVAIO DigitalActual
AVAIO Digital
Capacity1,000 MWDesign
1,000 MW
Capacity Basis1,000 MW combined grid and behind the meter power designActual
1,000 MW combined grid and behind the meter power design
Development ScaleAVAIO Digital is developing the Hercules campus in Appomattox County, Virginia as an approximately $3 billion project. The power design combines about 300 MW of grid service with as much as 700 MW of behind the meter generation for a 1 GW baseload envelopeActual
AVAIO Digital is developing the Hercules campus in Appomattox County, Virginia as an approximately $3 billion project. The power design combines about 300 MW of grid service with as much as 700 MW of behind the meter generation for a 1 GW baseload envelope
InfrastructureThat figure describes the site power design, not IT capacity.Actual
That figure describes the site power design, not IT capacity.