AVAIO Digital Hercules Campus

Appomattox, Virginia, United StatesPreconstruction
Capacity
1,000 MW
Planned critical IT
Lead participant
AVAIO Digital
Developer
Last updated
Aug 27, 2026
Most recent public record update

About AVAIO Digital Hercules Campus

AVAIO Digital is developing the Hercules campus in Appomattox County, Virginia as an approximately $3 billion project. The power design combines about 300 MW of grid service with as much as 700 MW of behind-the-meter generation for a 1 GW baseload envelope. That figure describes the site power design, not IT capacity.

Capacity

Planned critical IT
Operating capacityAn operating IT-capacity figure has not been publicly disclosed.
It Load1,000 MWDesign · AVAIO Digital Hercules Campus
Utility Service1,000 MWDesign · AVAIO Digital Hercules Campus
Utility Service1,000 MW combined grid and behind the meter power designActual · AVAIO Digital Hercules Campus

Development

1 phases · 2 milestones
Development programAnnounced Or Preconstruction

AVAIO Digital Hercules Campus: Development program.

AVAIO Digital Hercules Campus — Development program
In Progress
AVAIO Digital is developing the Hercules campus in Appomattox County, Virginia as an approximately $3 billion project.
In Progress

Infrastructure

Utility ServicePlanned Or Represented

1,000 MW

1,000 MW combined grid and behind-the-meter power design

Site FacilityPlanned Or Represented

That figure describes the site power design, not IT capacity.

Project map

0 of 1 project point mapped
Infrastructure facts
2
Mapped records
1
Capacity figures
1

No map point available

Power & interconnection: 1Site systems: 1

Facts & sources

Published claims and their source links.

12 facts
Location Context
Hercules campus | Appomattox | Virginia | United States
Actual
Lifecycle Status
Preconstruction
Actual
Reported Capacity
1,000 MW
Design
Capacity Basis
Source stated total baseload power design, not critical IT load
Actual
Project Identity
AVAIO Digital Hercules Campus
Actual
Lifecycle Status
Development program
Actual
Location
Appomattox, Appomattox County, VA, US
Actual
Participant Roles
AVAIO Digital
Actual
Capacity
1,000 MW
Design
Capacity Basis
1,000 MW combined grid and behind the meter power design
Actual
Development Scale
AVAIO Digital is developing the Hercules campus in Appomattox County, Virginia as an approximately $3 billion project. The power design combines about 300 MW of grid service with as much as 700 MW of behind the meter generation for a 1 GW baseload envelope
Actual
Infrastructure
That figure describes the site power design, not IT capacity.
Actual