atNorth Haugaland NOR01 Mega Site

Haugaland Business Park, Tysvaer, Rogaland, NorwayPreconstruction
Capacity
350 MW
Planned / design
Lead participant
atNorth
Developer · Operator
Last updated
Aug 25, 2026
Most recent public record update

About atNorth Haugaland NOR01 Mega Site

atNorth plans NOR01 on 36 hectares in Haugaland Business Park, with 120 MW initial phases, a path to 350 MW and power projected for 2028. atNorth Haugaland NOR01 Mega Site is located in Haugaland Business Park, Tysvaer, Rogaland, NO and is a data center campus in preconstruction status. Participants include atNorth as developer, atNorth as operator, Haugaland Naeringspark as landowner, Statnett as utility. Published specifications include 120 MW of planned capacity, 350 MW of future potential, 120 MW of stated capacity. Development comprises Initial NOR01 phases (proposed), NOR01 full ramp (proposed). Key milestones include Zoning process begins for data center use (2026-06-03) and NOR01 initial power availability projected (2028). grid service agreement — 120 MW: Facility contribution agreement for initial network capacity; service is projected for 2028. transmission substation: One of two substations required for planned power delivery. Permitting includes zoning plan / land-use change for NOR01 Haugaland (in process).

Capacity

Planned / design
Operating capacityAn operating IT-capacity figure has not been publicly disclosed.
Future Potential120 MWActual · atNorth Haugaland NOR01 Mega Site
Future Potential350 MWActual · atNorth Haugaland NOR01 Mega Site

Development

2 phases · 3 milestones
Initial NOR01 phasesAnnounced Or Preconstruction

Planned site-power capacity, not operating IT load.

NOR01 full rampAnnounced Or Preconstruction

Future design envelope dependent on power, zoning, demand and construction.

Jun 3, 2026
Haugaland Business Park announces NOR01 land sale
Completed
Jun 3, 2026
Zoning process begins for data center use
Completed
Jan 1, 2028
NOR01 initial power availability projected
Year

Infrastructure

Utility ServiceSecured Or Contracted

120 MW

Facility contribution agreement for initial network capacity; service is projected for 2028.

Electric GridPlanned Or Represented

One of two substations required for planned power delivery.

Electric GridPlanned Or Represented

Regional-grid substation supporting NOR01; final schedule and energization evidence remain open.

Heat ReusePotential Or Planned

Excess heat is to be made available, but no offtake agreement or delivery infrastructure is disclosed.

Project map

0 of 1 project point mapped
Infrastructure facts
4
Mapped records
1
Capacity figures
1

No map point available

Power & interconnection: 3Cooling & water: 1

Facts & sources

Published claims and their source links.

15 facts
Land Acquired Or Sale Agreed
True
Actual
Site Area
36 hectares
Actual
Site Within Haugaland Business Park
True
Actual
Initial Planned Site Power
120 MW
Actual
Future Planned Site Power
350 MW
Actual
Projected Power Availability Year
2028
Actual
Statnett Substation Planned
True
Actual
Fagne Substation Planned
True
Actual
Zoning Work Started
True
Actual
Phase One Investment Estimate
11 NOK billion
Actual
Phase One Operational Jobs Expected Over
70 jobs
Actual
Full Capacity On Site Jobs Expected Around
200 jobs
Actual
Renewable Power Claim
100 percent
Actual
Design Pue At Or Below
1.2 PUE
Actual
Direct Liquid Cooling Ready
True
Actual