AtlasEdge VIE003 Vienna Data Center

Vienna, AustriaPreconstruction
Evidence
Planned critical IT
32 MW
Updated
Oct 28, 2026

VIE003 is a separate Perfektastrasse development planned for eight data halls and more than 6,900 square metres. AtlasEdge distinguishes 12 MW secured from day one from a 32 MW scalable design; the headline uses the latter only as future potential. Phase-by-phase energization, tenant utilization, contract pricing and any undisclosed financing remain outside the verified public record.

Capacity

Reported capacity

Design

32 MW

Source

Reported capacity

Planned / design or future potential

32 MW

Source

Operating IT capacity: Not established in published records

A missing figure does not mean zero. Planned, utility and generation figures are not operating IT capacity.

Development

Development, permitting and phased deliveryUnder construction

VIE003 is a separate Perfektastrasse development planned for eight data halls and more than 6,900 square metres. AtlasEdge distinguishes 12 MW secured from day one from a 32 MW scalable design; the headline uses the latter only as future potential. Phase-by-phase energization, tenant utilization, contract pricing and any undisclosed financing remain outside the verified public record.

Participants

AtlasEdge

Developer

Sources by role
Developer (1)

Site & development

Location context

Actual

VIE003 | Vienna | Vienna | AT

Source

Location context

Actual

VIE003 | Vienna | Vienna | AT

Source

Technical specifications

Renewable energy claim

Actual

100 percent

Source

Additional project facts

Lifecycle status

Actual

Preconstruction

Source

Capacity basis

Actual

AtlasEdge publishes a scalable maximum of 32 MW for VIE003.

Source

Lifecycle status

Actual

Preconstruction

Source

Capacity basis

Actual

32 MW is a published future facility or full build IT boundary; it is not operating load.

Source

Operator confirmed

Actual

AtlasEdge

Source

Facility capacity basis

Actual

32 MW is a published future facility or full build IT boundary; it is not operating load.

Source

Current lifecycle

Actual

Under development

Source

Operating model

Actual

Carrier neutral colocation

Source

Data hall count

Design

8 data halls

Source

Infrastructure & permits

Technical details (2)
Electric grid

Planned or represented

32 MW

Published IT design boundary; utility service and operating load remain distinct.

Fiber

Planned or represented

Carrier-neutral or resilient fibre connectivity described for the individual facility.

Public-source research. Plans may change. See Evidence for sources and qualifications.

Related projects (3)
AtlasEdge VIE001 Vienna Data Center

Operating · Vienna, Austria

Same locality: Vienna · Shared participant: AtlasEdge

Compare in a collection
AtlasEdge VIE002 Vienna Data Center

Preconstruction · Vienna, Austria

Same locality: Vienna · Shared participant: AtlasEdge

Compare in a collection