Skip to content

AtlasEdge VIE002 Vienna Data Center

Vienna, AustriaPreconstruction
Evidence
Planned critical IT
8 MW
Updated
Oct 28, 2026

VIE002 is a separately identified planned Vienna facility with 8 MW of secured utility power and more than 1,400 square metres across two data halls. It is not merged with VIE001 or VIE003, and the 8 MW headline is labeled planned. Phase-by-phase energization, tenant utilization, contract pricing and any undisclosed financing remain outside the verified public record.

Capacity

Reported capacity

Design

8 MW

Source

Reported capacity

Planned / design or future potential

8 MW

Source

Operating IT capacity: Not established in published records

A missing figure does not mean zero. Planned, utility and generation figures are not operating IT capacity.

Development

Development, permitting and phased deliveryUnder construction

VIE002 is a separately identified planned Vienna facility with 8 MW of secured utility power and more than 1,400 square metres across two data halls. It is not merged with VIE001 or VIE003, and the 8 MW headline is labeled planned. Phase-by-phase energization, tenant utilization, contract pricing and any undisclosed financing remain outside the verified public record.

Participants

AtlasEdge

Developer

Sources by role
Developer (1)

Site & development

Location context

Actual

VIE002 | Vienna | Vienna | AT

Source

Location context

Actual

VIE002 | Vienna | Vienna | AT

Source

Technical specifications

Renewable energy claim

Actual

100 percent

Source

Additional project facts

Lifecycle status

Actual

Preconstruction

Source

Capacity basis

Actual

AtlasEdge publishes 8 MW for planned VIE002.

Source

Lifecycle status

Actual

Preconstruction

Source

Capacity basis

Actual

8 MW is a published future facility or full build IT boundary; it is not operating load.

Source

Operator confirmed

Actual

AtlasEdge

Source

Facility capacity basis

Actual

8 MW is a published future facility or full build IT boundary; it is not operating load.

Source

Current lifecycle

Actual

Under development

Source

Operating model

Actual

Carrier neutral colocation

Source

Infrastructure & permits

Technical details (2)
Electric grid

Planned or represented

8 MW

Published IT design boundary; utility service and operating load remain distinct.

Fiber

Planned or represented

Carrier-neutral or resilient fibre connectivity described for the individual facility.

Public-source research. Plans may change. See Evidence for sources and qualifications.

Related projects (3)
AtlasEdge VIE001 Vienna Data Center

Operating · Vienna, Austria

Same locality: Vienna · Shared participant: AtlasEdge

Compare in a collection
AtlasEdge VIE003 Vienna Data Center

Preconstruction · Vienna, Austria

Same locality: Vienna · Shared participant: AtlasEdge

Compare in a collection
NTT DATA Vienna 1 Data Center Campus

Partially operational · Vienna, Austria

Same locality: Vienna

Compare in a collection