Cartis diligence evidence schedule
AtlasEdge LIS002 Lisbon Data Center
PRJ-1032 · Site · Lisbon, Lisbon District, Portugal
Captured 2026-09-06T04:13:13.749Z · Record last updated 2026-08-28
SHA-256: 4a9a7a2a6cc5df5697c8d9e5b410f4f48d8e034d5a2f306ae39af8f6d42dd1e4
Save a diligence baseline
Download the public evidence as it appears now. Compare a previously saved snapshot to see added, removed and changed claims, counterparties, financing and milestones. Files are read in this browser and are not uploaded.
The fingerprint detects file changes; it is not a digital signature or a claim of independently verified authenticity. Keep your downloaded copy with the transaction file.
Scope and capacity
AtlasEdge LIS002 Lisbon Data Center is part of AtlasEdge’s three-phase Lisbon campus near the Carcavelos cable-landing corridor. The current facility capacity is kept separate from the 30 MW campus program. A €253 million sustainability-linked facility funds LIS001 and LIS002, with project-specific tranches recorded rather than attributed as standalone facility value. Phase-by-phase energization, tenant utilization, contract pricing and any undisclosed financing remain outside the verified public record.
Headline: 16 MW Planned critical IT
Numbers refer to their stated physical boundaries and are not added together. Source dates, claim dates and record updates have different meanings. Missing dates and locators are not inferred.
Claims and exhibit sources
Location Context · LIS002 | Lisbon | Lisbon District | PT
actual · AtlasEdge LIS002 Lisbon Data Center (project)
Claim 68075 · Review: Approved · Claim date: Not published
- AtlasEdge LIS002 Lisbon Data Center official profile
AtlasEdge · Document date: 2026-08-28 · Primary
https://atlasedge.com/data-centres/Lisbon/
Lifecycle Status · Preconstruction
actual · AtlasEdge LIS002 Lisbon Data Center (project)
Claim 68076 · Review: Approved · Claim date: Not published
- AtlasEdge LIS002 Lisbon Data Center official profile
AtlasEdge · Document date: 2026-08-28 · Primary
https://atlasedge.com/data-centres/Lisbon/
Reported Capacity · 16 MW
design · AtlasEdge LIS002 Lisbon Data Center (project)
Claim 68077 · Review: Approved · Claim date: Not published
Headline treatment: Selected headline
- AtlasEdge LIS002 Lisbon Data Center official profile
AtlasEdge · Document date: 2026-08-28 · Primary
https://atlasedge.com/data-centres/Lisbon/
Capacity Basis · AtlasEdge publishes 16 MW for planned LIS002.
Planned / design or future potential · AtlasEdge LIS002 Lisbon Data Center (project)
Claim 68078 · Review: Approved · Claim date: Not published
- AtlasEdge LIS002 Lisbon Data Center official profile
AtlasEdge · Document date: 2026-08-28 · Primary
https://atlasedge.com/data-centres/Lisbon/
Location Context · LIS002 | Lisbon | Lisbon District | PT
actual · AtlasEdge LIS002 Lisbon Data Center (project)
Claim 81019 · Review: Approved · Claim date: Not published
- AtlasEdge LIS002 Lisbon Data Center official profile
AtlasEdge · Document date: 2026-08-28 · Primary
https://atlasedge.com/data-centres/Lisbon/
Lifecycle Status · Preconstruction
actual · AtlasEdge LIS002 Lisbon Data Center (project)
Claim 81020 · Review: Approved · Claim date: Not published
- AtlasEdge LIS002 Lisbon Data Center official profile
AtlasEdge · Document date: 2026-08-28 · Primary
https://atlasedge.com/data-centres/Lisbon/
Reported Capacity · 16 MW
Planned / design or future potential · AtlasEdge LIS002 Lisbon Data Center (project)
Claim 81021 · Review: Approved · Claim date: Not published
Headline treatment: Separate claim, not added to the headline
- AtlasEdge LIS002 Lisbon Data Center official profile
AtlasEdge · Document date: 2026-08-28 · Primary
https://atlasedge.com/data-centres/Lisbon/
Capacity Basis · 16 MW is a published future facility or full build IT boundary; it is not operating load.
Planned / design or future potential · AtlasEdge LIS002 Lisbon Data Center (project)
Claim 81022 · Review: Approved · Claim date: Not published
- AtlasEdge LIS002 Lisbon Data Center official profile
AtlasEdge · Document date: 2026-08-28 · Primary
https://atlasedge.com/data-centres/Lisbon/
Operator Confirmed · AtlasEdge
actual · AtlasEdge LIS002 Lisbon Data Center (project)
Claim 81023 · Review: Approved · Claim date: Not published
- AtlasEdge LIS002 Lisbon Data Center official profile
AtlasEdge · Document date: 2026-08-28 · Primary
https://atlasedge.com/data-centres/Lisbon/
Facility Capacity Basis · 16 MW is a published future facility or full build IT boundary; it is not operating load.
Planned / design or future potential · AtlasEdge LIS002 Lisbon Data Center (project)
Claim 81024 · Review: Approved · Claim date: Not published
- AtlasEdge LIS002 Lisbon Data Center official profile
AtlasEdge · Document date: 2026-08-28 · Primary
https://atlasedge.com/data-centres/Lisbon/
Current Lifecycle · Under development
actual · AtlasEdge LIS002 Lisbon Data Center (project)
Claim 81025 · Review: Approved · Claim date: Not published
- AtlasEdge LIS002 Lisbon Data Center official profile
AtlasEdge · Document date: 2026-08-28 · Primary
https://atlasedge.com/data-centres/Lisbon/
Operating Model · Carrier neutral colocation
actual · AtlasEdge LIS002 Lisbon Data Center (project)
Claim 81027 · Review: Approved · Claim date: Not published
- AtlasEdge LIS002 Lisbon Data Center official profile
AtlasEdge · Document date: 2026-08-28 · Primary
https://atlasedge.com/data-centres/Lisbon/
Renewable Energy Claim · 100 percent
actual · AtlasEdge LIS002 Lisbon Data Center (project)
Claim 81028 · Review: Approved · Claim date: Not published
- AtlasEdge LIS002 Lisbon Data Center official profile
AtlasEdge · Document date: 2026-08-28 · Primary
https://atlasedge.com/data-centres/Lisbon/
Campus Green Financing · €253,000,000
closed financing · AtlasEdge LIS002 Lisbon Data Center (project)
Claim 81029 · Review: Approved · Claim date: Not published
- €253 million Lisbon campus green financing
AtlasEdge · Document date: 2025-10-28 · Primary
https://atlasedge.com/atlasedge-secures-e253-million-in-green-financing-for-lisbon-campus-expansion/
Counterparties and capital
AtlasEdge · Developer · CMP-1487
€253,000,000 · 2025-10-28
Shared LIS001/LIS002 campus financing; Facility A €63m and Facility B €190m.
AtlasEdge (Borrower)
Financing record 174; claim-specific source links appear in the exhibit sources where published.
This schedule captures public Cartis research. It is not a title, lien or legal-opinion report. Document page/section locators and claim review timestamps are included only when published; this version has no separate locator or claim-review-time feed. Downloaded snapshots are retained by you; Cartis does not archive them automatically.