AtlasEdge HAM002 Hamburg Data Center

Hamburg, GermanyOperating
Evidence
Planned critical IT
11.2 MW
Updated
Oct 28, 2026

HAM002 is an operating Ahrensburg facility with continuing expansion. Independent reporting identifies four phases, a 3.2 MW next tranche and 20 MW total power at full completion; 2 MW only as the earlier IT boundary and does not recast 20 MW as operating IT. Phase-by-phase energization, tenant utilization, contract pricing and any undisclosed financing remain outside the verified public record.

Capacity

Reported capacity

Design

11.2 MW

Source

Reported capacity

Design

11.2 MW

Source

Operating IT capacity: Not established in published records

A missing figure does not mean zero. Planned, utility and generation figures are not operating IT capacity.

Development

Operating facility and documented expansionOperational

HAM002 is an operating Ahrensburg facility with continuing expansion. Independent reporting identifies four phases, a 3.2 MW next tranche and 20 MW total power at full completion; 2 MW only as the earlier IT boundary and does not recast 20 MW as operating IT. Phase-by-phase energization, tenant utilization, contract pricing and any undisclosed financing remain outside the verified public record.

Milestones (1)
Second of four expansion phases reported underway

Aug 5, 2026 · Recorded actual event

Completed · Status changed

Source not linked

Participants

AtlasEdge

Developer

Sources by role
Developer (1)

Site & development

Location context

Actual

HAM002 | Hamburg | Hamburg | DE

Source

Location context

Actual

HAM002 | Hamburg | Hamburg | DE

Source

Technical specifications

Renewable energy claim

Actual

100 percent

Source

Additional project facts

Lifecycle status

Actual

Operating

Source

Capacity basis

Actual

AtlasEdge publishes 11.2 MW of IT capacity at final expansion.

Source

Lifecycle status

Actual

Operating

Source

Capacity basis

Actual

11.2 MW is the earlier published IT boundary; the current 20 MW expansion figure is total power and is separately classified as future utility capacity.

Source

Operator confirmed

Actual

AtlasEdge

Source

Facility capacity basis

Actual

11.2 MW is the earlier published IT boundary; the current 20 MW expansion figure is total power and is separately classified as future utility capacity.

Source

Current lifecycle

Actual

Operating

Source

Operating model

Actual

Carrier neutral colocation

Source

Infrastructure & permits

Technical details (3)
Electric grid

Operational

11.2 MW

Facility IT boundary; customer utilization is not disclosed.

Fiber

Operational

Carrier-neutral or resilient fibre connectivity described for the individual facility.

Utility service

Under construction

20 MW

Full four-phase total-power envelope; not the current IT headline.

Public-source research. Plans may change. See Evidence for sources and qualifications.