Record last updated Oct 28, 2026

Scope and capacity

Atlas Power’s Williston-area facility entered service in 2023 as a cryptocurrency and data-processing load. North Dakota records place current service near 240 MW, while 700 MW is a longer-term expansion plan; Cartis therefore separates operating capacity from the future campus ceiling.

Headline: 700 MW Planned / design

Numbers refer to their stated physical boundaries and are not added together. Source dates, claim dates and record updates have different meanings. Missing dates and locators are not inferred.

Location context · Atlas Power Williston | Williston | North Dakota | US

Actual · Atlas Power Williston (Project)

Claim 71926 · Recorded claim type: Actual · Review: Approved · Claim date: Not stated

  1. Atlas Power Williston public-record research record

    US Data Center Map · Document date: Aug 28, 2026 · Primary

    Source reference: SRC-4137 · News report · Recorded authority: Secondary

    Source URL

    https://dcmap.us/states/north-dakota/

Lifecycle status · Operating

Actual · Atlas Power Williston (Project)

Claim 71927 · Recorded claim type: Actual · Review: Approved · Claim date: Not stated

  1. Atlas Power Williston public-record research record

    US Data Center Map · Document date: Aug 28, 2026 · Primary

    Source reference: SRC-4137 · News report · Recorded authority: Secondary

    Source URL

    https://dcmap.us/states/north-dakota/

Reported capacity · 700 MW

Planned / design or future potential · Atlas Power Williston (Project)

Claim 71928 · Recorded claim type: Design · Review: Approved · Claim date: Not stated

Headline treatment: Selected headline

  1. Atlas Power Williston public-record research record

    US Data Center Map · Document date: Aug 28, 2026 · Primary

    Source reference: SRC-4137 · News report · Recorded authority: Secondary

    Source URL

    https://dcmap.us/states/north-dakota/

Capacity basis · 700 MW long term expansion ceiling; about 240 MW is documented in service, and neither figure should be labeled operating IT capacity.

Actual · Atlas Power Williston (Project)

Claim 71929 · Recorded claim type: Actual · Review: Approved · Claim date: Not stated

  1. Atlas Power Williston public-record research record

    US Data Center Map · Document date: Aug 28, 2026 · Primary

    Source reference: SRC-4137 · News report · Recorded authority: Secondary

    Source URL

    https://dcmap.us/states/north-dakota/

Use type · Cryptocurrency mining and data processing

Actual · Atlas Power Williston (Project)

Claim 77864 · Recorded claim type: Actual · Review: Approved · Claim date: Not stated

  1. North Dakota transmission capacity study

    North Dakota Transmission Authority · Document date: Nov 1, 2025 · Primary

    Source reference: SRC-4447 · Government record · Recorded authority: Official primary

    Source URL

    https://www.ndic.nd.gov/sites/www/files/documents/Transmission-Authority/Publications/Transmission%20Capacity%20Study/2025-Final-Report-Future-Proofing-NDs-Electrical.pdf

Operations start · 2023

Actual · Atlas Power Williston (Project)

Claim 77865 · Recorded claim type: Actual · Review: Approved · Claim date: Not stated

  1. FERC filing on Atlas load

    Montana-Dakota Utilities · Document date: Jan 23, 2024 · Primary

    Source reference: SRC-4448 · Government record · Recorded authority: Official primary

    Source URL

    https://spp.org/documents/71107/20240123_montana-dakota%20utilities%20complaint_el24-61-000.pdf

Counterparties and capital

Atlas Power · Developer · CMP-1532