Atlas Power Williston

Williston, North Dakota, United StatesOperating / Stabilized
Capacity
700 MW
Planned / design
Lead participant
Atlas Power
Developer
Last updated
Aug 28, 2026
Most recent public record update

About Atlas Power Williston

Atlas Power’s Williston-area facility entered service in 2023 as a cryptocurrency and data-processing load. North Dakota records place current service near 240 MW, while 700 MW is a longer-term expansion plan; Cartis therefore separates operating capacity from the future campus ceiling.

Capacity

Planned / design
Operating capacityAn operating IT-capacity figure has not been publicly disclosed.
Future Potential700 MWDesign · Atlas Power Williston

Development

1 phases · 2 milestones
Operating initial load with future expansionOperational

Atlas Power’s Williston-area facility entered service in 2023 as a cryptocurrency and data-processing load. North Dakota records place current service near 240 MW, while 700 MW is a longer-term expansion plan; Cartis therefore separates operating capacity from the future campus ceiling.

Feb 1, 2023
Facility commissioned around 90 MW
Completed
Apr 1, 2023
Load increased to about 200 MW
Completed

Infrastructure

Electric GridOperational

240 MW

Current public-record service level; 700 MW is expansion potential.

Project map

0 of 1 project point mapped
Infrastructure facts
1
Mapped records
1
Capacity figures
1

No map point available

Power & interconnection: 1

Facts & sources

Published claims and their source links.

6 facts
Location Context
Atlas Power Williston | Williston | North Dakota | US
Actual
Lifecycle Status
Operating
Actual
Reported Capacity
700 MW
Design
Capacity Basis
700 MW long term expansion ceiling; about 240 MW is documented in service, and neither figure should be labeled operating IT capacity.
Actual
Use Type
Cryptocurrency mining and data processing
Actual
Operations Start
2023
Actual