All records
Data center siteSite record

Applied Digital Polaris Forge 2 AI Factory Campus

Ellendale, North Dakota, United StatesUnder construction
Capacity
200 MW
Planned critical IT
Lead participant
Applied Digital
Developer
Last updated
Aug 27, 2026
Most recent public record update

About Applied Digital Polaris Forge 2 AI Factory Campus

Applied Digital is constructing Polaris Forge 2 in North Dakota as a two-building hyperscaler AI campus. Company reporting identifies 200 MW for the campus. Applied Digital is associated with the development in Ellendale, Ellendale area, ND, US. The disclosed development scope includes 200 MW planned campus; two buildings under construction. Power and physical infrastructure include purpose-built liquid-cooled AI Factory campus. Applied Digital reports a 200 MW hyperscaler campus under construction. A $2.15 billion senior secured note financing supports development and construction of the 200 MW contracted campus.

Projects sharing a market, utility, or organization.

1 related

Capacity

Planned critical IT
Operating capacityAn operating IT-capacity figure has not been publicly disclosed.
It Load200 MWDesign · Applied Digital Polaris Forge 2 AI Factory Campus
It Load200 MWDesign · Applied Digital Polaris Forge 2 AI Factory Campus

Development

1 phases · 2 milestones
Construction programUnder Construction

Project-wide phase for Applied Digital Polaris Forge 2 AI Factory Campus; capacity class is it load.

Apr 8, 2026
Polaris Forge 2 development disclosed
Completed
Two buildings under construction
Forecast

Infrastructure

Electric GridPlanned Or Represented

200 MW

Applied Digital reports a 200 MW hyperscaler campus under construction.

Site FacilityPlanned Or Represented

Purpose-built liquid-cooled AI Factory campus.

Project map

0 of 1 project point mapped
Infrastructure facts
2
Mapped records
1
Capacity figures
1

No map point available

Power & interconnection: 1Site systems: 1

Facts & sources

Published claims and their source links.

12 facts
Location Context
Polaris Forge 2 campus | Ellendale area | North Dakota
Actual
Lifecycle Status
Construction
Actual
Reported Capacity
200 MW
Design
Capacity Basis
Applied Digital reports a 200 MW hyperscaler campus under construction.
Actual
Location Context
Polaris Forge 2 campus | Ellendale area | North Dakota
Actual
Lifecycle Status
Construction
Actual
Reported Capacity
200 MW
Design
Capacity Basis
Applied Digital reports a 200 MW hyperscaler campus under construction.
Actual
Development Scale
200 MW planned campus
Actual
Development Milestone
Two buildings under construction.
Actual
Power Arrangement
The 200 MW value is under construction design capacity, not operating load.
Actual
Site Configuration
Polaris Forge 2 campus | Ellendale area | North Dakota
Actual