Applied Digital Polaris Forge 2 AI Factory Campus
- Planned critical IT
- 200 MW
- Updated
- Oct 28, 2026
Applied Digital’s October 7, 2026 release identifies Polaris Forge 2 at Harwood and expects initial operations by the end of 2026; its quarterly filing forecasts full ready-for-service in early 2027. These remain forecasts and do not resolve the differing capacity bases in its filings or establish an operating MW figure. Applied Digital is constructing Polaris Forge 2 in North Dakota as a two-building hyperscaler AI campus. Company reporting identifies 200 MW for the campus. Applied Digital is associated with the development in Harwood, ND, US. The disclosed development scope includes 200 MW planned campus; two buildings under construction. Power and physical infrastructure include purpose-built liquid-cooled AI Factory campus. Applied Digital reports a 200 MW hyperscaler campus under construction. A $2.15 billion senior secured note financing supports development and construction of the 200 MW contracted campus.
Capacity
Operating IT capacity: Not established in published records
A missing figure does not mean zero. Planned, utility and generation figures are not operating IT capacity.
Development
Project-wide phase for Applied Digital Polaris Forge 2 AI Factory Campus; capacity class is it load.
Milestones (2)
Apr 8, 2026 · Recorded actual event
Completed · Announced
Source not linkedDate not disclosed · Forecast / planned record
Forecast · Forecast completion
Source not linkedParticipants
Developer
Sources by role
Developer (1)
- Applied Digital fiscal third quarter 2026 results · Apr 8, 2026 · Primary
Capital & incentives
Financing records
Debt financing
$2.15bnMar 2, 2026
Development and construction of 200 MW of contracted critical IT load.
Parties & sources
Applied Digital (Sponsor)
Sources (2)
- Applied Digital fiscal 2026 Form 10-K · Jul 30, 2026
- Applied Digital fiscal third quarter 2026 results · Apr 8, 2026
Site & development
Technical specifications
Power arrangement
ActualThe 200 MW value is under construction design capacity, not operating load.
SourceAdditional project facts
Infrastructure & permits
Technical details (2)
Planned or represented
200 MW
Applied Digital reports a 200 MW hyperscaler campus under construction.
Planned or represented
Purpose-built liquid-cooled AI Factory campus.
Project map
Public-source research. Plans may change. See Evidence for sources and qualifications.