Applied Digital Polaris Forge 1
- Contracted
- 400 MW
- Updated
- Oct 28, 2026
Applied Digital's October 7, 2026 earnings release reports 250 MW of operational critical IT capacity at Polaris Forge 1 as of October 1, comprising its first 100 MW building and second 150 MW building. The third 150 MW building remained under construction; it is not included in the 250 MW operating figure. Applied Digital previously placed the first 50 MW phase of Polaris Forge 1 into service at Ellendale, North Dakota. That historical first phase is part of a fully leased 400 MW critical-IT deployment for CoreWeave, with additional campus construction continuing. Liquid-cooling and near-zero-water design for AI and high-performance computing workloads.
Capacity
Operating IT capacity: Not established in published records
A missing figure does not mean zero. Planned, utility and generation figures are not operating IT capacity.
Development
Applied Digital Polaris Forge 1: Operating with expansion underway.
Milestones (2)
Oct 27, 2025 · Event timing type not established
In progress · Construction started
Source not linkedDate not disclosed · Event timing type not established
In progress · Status changed
Source not linkedParticipants
Developer
Sources by role
Developer (1)
- Applied Digital Achieves Ready for Service for Phase 1 at Polaris Forge 1 · Oct 27, 2025 · Primary
Tenant
Sources by role
Tenant (1)
- Applied Digital Achieves Ready for Service for Phase 1 at Polaris Forge 1 · Oct 27, 2025 · Primary
Capital & incentives
Financing records
Commercial contract
$11bnJul 30, 2026
Long-term contracted revenue associated with the 400 MW CoreWeave deployment.
Parties & sources
Anthropic (Sponsor)
Sources (2)
- Applied Digital fiscal 2026 Form 10-K · Jul 30, 2026
- Applied Digital Achieves Ready for Service for Phase 1 at Polaris Forge 1 · Oct 27, 2025
Site & development
Additional project facts
Infrastructure
ActualLiquid cooling and near zero water design for AI and high performance computing workloads.
SourceInfrastructure & permits
Technical details (2)
Partially operational
400 MW
400 MW contracted critical IT capacity
Partially operational
Liquid-cooling and near-zero-water design for AI and high-performance computing workloads.
Project map
Public-source research. Plans may change. See Evidence for sources and qualifications.