Applied Digital Garden City Data Center

Garden City, Texas, United StatesOperating
Evidence
Facility design
200 MW
Updated
Oct 28, 2026

Applied Digital developed and energized a 200 MW hosting facility near Garden City, Texas, on a long-term ground lease. The site was built beside wind generation and reached full energization in October 2023 for blockchain-compute hosting. Applied Digital later reported the sale of the Garden City location, so the operating site is presented separately from the company’s current North Dakota AI-campus strategy.

Capacity

Reported capacity

Facility electrical / design capacity

200 MW

Source

Energized capacity

Facility electrical / design capacity

200 MW

Source

Operating IT capacity: Not established in published records

A missing figure does not mean zero. Planned, utility and generation figures are not operating IT capacity.

Development

200 MW hosting facilityOperational

Full 200 MW facility energized for hosting operations.

Milestones (2)
Full 200 MW facility energized

Oct 20, 2023 · Recorded actual event

Completed · Energized

Source not linked
Applied Digital disclosed that the Garden City location had been sold

Feb 12, 2026 · Recorded actual event

Completed · Status changed

Source not linked

Participants

Applied Digital Corporation

Developer

Sources by role
Developer (1)
Developer (1)
Developer (1)

Capital & incentives

Financing records

Construction loan

Amount not disclosed

Jan 1, 2022

Facility financing disclosed in SEC filings without a stated aggregate project total.

Parties & sources

Additional project facts

Ground lease term

Actual

99 years

Source

Infrastructure & permits

Technical details (2)
Electric grid

Operational

200 MW

Facility electrical design and energized hosting capacity.

Renewable energy supply

Operational

Site developed beside wind generation; the wind asset is not assigned as facility IT capacity.

Public-source research. Plans may change. See Evidence for sources and qualifications.