Applied Digital Garden City Data Center

Garden City, Texas, United StatesOperating / Stabilized
Capacity
200 MW
Operating critical IT
Lead participant
Applied Digital Corporation
Developer
Last updated
Sep 1, 2026
Most recent public record update

About Applied Digital Garden City Data Center

Applied Digital developed and energized a 200 MW hosting facility near Garden City, Texas, on a long-term ground lease. The site was built beside wind generation and reached full energization in October 2023 for blockchain-compute hosting. Applied Digital later reported the sale of the Garden City location, so the operating site is presented separately from the company’s current North Dakota AI-campus strategy.

Capacity

Operating critical IT
Operating capacityAn operating IT-capacity figure has not been publicly disclosed.
Design200 MWActual · Applied Digital Garden City Data Center
It Load200 MWActual · Applied Digital Garden City Data Center

Development

1 phases · 2 milestones
200 MW hosting facilityOperational

Full 200 MW facility energized for hosting operations.

Oct 20, 2023
Full 200 MW facility energized
Completed
Feb 12, 2026
Applied Digital disclosed that the Garden City location had been sold
Completed

Infrastructure

Electric GridOperational

200 MW

Facility electrical design and energized hosting capacity.

Renewable Energy SupplyOperational

Site developed beside wind generation; the wind asset is not assigned as facility IT capacity.

Project map

0 of 1 project point mapped
Infrastructure facts
2
Mapped records
1
Capacity figures
1

No map point available

Power & interconnection: 2

Facts & sources

Published claims and their source links.

3 facts
Reported Capacity
200 MW operating facility design capacity MW
Actual
Ground Lease Term
99 years
Actual
Energized Capacity
200 MW
Actual