AirTrunk TOK1 East Tokyo

PRJ-0415 · Site · Inzai, Chiba Prefecture, Chiba, Japan

Captured 2026-09-06T04:13:40.960Z · Record last updated 2026-08-25

SHA-256: 532ad091b773d51934819fad4aca1ab223bb1a0ffecb9362d300beb6a8ffb65d

Save a diligence baseline

Download the public evidence as it appears now. Compare a previously saved snapshot to see added, removed and changed claims, counterparties, financing and milestones. Files are read in this browser and are not uploaded.

The fingerprint detects file changes; it is not a digital signature or a claim of independently verified authenticity. Keep your downloaded copy with the transaction file.

Scope and capacity

TOK1 is a 300+ MW design campus with more than 60 MW operating at its 2021 opening and substantial later phases under construction. AirTrunk TOK1 East Tokyo is located in Inzai, Chiba Prefecture, 12, JP and is a data center campus in partially operational status.

Headline: 300 MW Planned / design

Numbers refer to their stated physical boundaries and are not added together. Source dates, claim dates and record updates have different meanings. Missing dates and locators are not inferred.

Claims and exhibit sources

Facility Code · TOK1

actual · AirTrunk TOK1 East Tokyo (project)

Claim 38560 · Review: Approved · Claim date: Not published

  1. AirTrunk opens TOK1 East Tokyo

    AirTrunk · Document date: 2021-11-30 · Corroborating

    https://airtrunk.com/airtrunk-powers-the-cloud-in-japan-opening-300mw-tokyo-hyperscale-data-centre/
  2. TOK1 East Tokyo data center

    AirTrunk · Document date: Not published · Primary

    https://airtrunk.com/location/tok1-east-tokyo/

Campus Location · Inzai, Chiba Prefecture

actual · AirTrunk TOK1 East Tokyo (project)

Claim 38561 · Review: Approved · Claim date: Not published

  1. AirTrunk opens TOK1 East Tokyo

    AirTrunk · Document date: 2021-11-30 · Corroborating

    https://airtrunk.com/airtrunk-powers-the-cloud-in-japan-opening-300mw-tokyo-hyperscale-data-centre/
  2. TOK1 East Tokyo data center

    AirTrunk · Document date: Not published · Primary

    https://airtrunk.com/location/tok1-east-tokyo/

Total Design Capacity · 300 MW+

Planned / design or future potential · AirTrunk TOK1 East Tokyo (project)

Claim 38562 · Review: Approved · Claim date: Not published

Headline treatment: Selected headline

  1. AirTrunk breaks ground on 40 MW expansion at Tokyo campus

    Data Center Dynamics · Document date: 2025-06-19 · Corroborating

    https://www.datacenterdynamics.com/en/news/airtrunk-breaks-ground-on-40mw-expansion-at-tokyo-data-center-campus/
  2. AirTrunk opens TOK1 East Tokyo

    AirTrunk · Document date: 2021-11-30 · Corroborating

    https://airtrunk.com/airtrunk-powers-the-cloud-in-japan-opening-300mw-tokyo-hyperscale-data-centre/
  3. TOK1 East Tokyo data center

    AirTrunk · Document date: Not published · Primary

    https://airtrunk.com/location/tok1-east-tokyo/

Initial Operating Capacity Minimum · 60 MW+

reported rounded · AirTrunk TOK1 East Tokyo (project)

Claim 38563 · Review: Approved · Claim date: Not published

Headline treatment: Not included in reviewed operating IT capacity

  1. AirTrunk breaks ground on 40 MW expansion at Tokyo campus

    Data Center Dynamics · Document date: 2025-06-19 · Corroborating

    https://www.datacenterdynamics.com/en/news/airtrunk-breaks-ground-on-40mw-expansion-at-tokyo-data-center-campus/
  2. AirTrunk opens TOK1 East Tokyo

    AirTrunk · Document date: 2021-11-30 · Primary

    https://airtrunk.com/airtrunk-powers-the-cloud-in-japan-opening-300mw-tokyo-hyperscale-data-centre/

Opened Date · 2021-11-30

actual · AirTrunk TOK1 East Tokyo (project)

Claim 38564 · Review: Approved · Claim date: Not published

  1. AirTrunk opens TOK1 East Tokyo

    AirTrunk · Document date: 2021-11-30 · Primary

    https://airtrunk.com/airtrunk-powers-the-cloud-in-japan-opening-300mw-tokyo-hyperscale-data-centre/

Campus Land Area · 13.25 hectares

reported rounded · AirTrunk TOK1 East Tokyo (project)

Claim 38565 · Review: Approved · Claim date: Not published

  1. AirTrunk opens TOK1 East Tokyo

    AirTrunk · Document date: 2021-11-30 · Primary

    https://airtrunk.com/airtrunk-powers-the-cloud-in-japan-opening-300mw-tokyo-hyperscale-data-centre/

Current Site Area · 13 hectares

reported rounded · AirTrunk TOK1 East Tokyo (project)

Claim 38566 · Review: Approved · Claim date: Not published

  1. TOK1 East Tokyo data center

    AirTrunk · Document date: Not published · Primary

    https://airtrunk.com/location/tok1-east-tokyo/

Data Hall Area · 80,000 square meters

reported rounded · AirTrunk TOK1 East Tokyo (project)

Claim 38567 · Review: Approved · Claim date: Not published

  1. TOK1 East Tokyo data center

    AirTrunk · Document date: Not published · Primary

    https://airtrunk.com/location/tok1-east-tokyo/

Office Storage Area · 9,600 square meters

reported rounded · AirTrunk TOK1 East Tokyo (project)

Claim 38568 · Review: Approved · Claim date: Not published

  1. TOK1 East Tokyo data center

    AirTrunk · Document date: Not published · Primary

    https://airtrunk.com/location/tok1-east-tokyo/

Data Hall Count · 102 data halls

reported rounded · AirTrunk TOK1 East Tokyo (project)

Claim 38569 · Review: Approved · Claim date: Not published

  1. TOK1 East Tokyo data center

    AirTrunk · Document date: Not published · Primary

    https://airtrunk.com/location/tok1-east-tokyo/

Planned Building Count · 7

Planned / design or future potential · AirTrunk TOK1 East Tokyo (project)

Claim 38570 · Review: Approved · Claim date: Not published

  1. AirTrunk opens TOK1 East Tokyo

    AirTrunk · Document date: 2021-11-30 · Primary

    https://airtrunk.com/airtrunk-powers-the-cloud-in-japan-opening-300mw-tokyo-hyperscale-data-centre/

Grid Voltage · 66 kV

reported rounded · AirTrunk TOK1 East Tokyo (project)

Claim 38571 · Review: Approved · Claim date: Not published

  1. AirTrunk opens TOK1 East Tokyo

    AirTrunk · Document date: 2021-11-30 · Corroborating

    https://airtrunk.com/airtrunk-powers-the-cloud-in-japan-opening-300mw-tokyo-hyperscale-data-centre/
  2. TOK1 East Tokyo data center

    AirTrunk · Document date: Not published · Primary

    https://airtrunk.com/location/tok1-east-tokyo/

Design Pue · 1.15 PUE

reported rounded · AirTrunk TOK1 East Tokyo (project)

Claim 38572 · Review: Approved · Claim date: Not published

  1. AirTrunk opens TOK1 East Tokyo

    AirTrunk · Document date: 2021-11-30 · Corroborating

    https://airtrunk.com/airtrunk-powers-the-cloud-in-japan-opening-300mw-tokyo-hyperscale-data-centre/
  2. TOK1 East Tokyo data center

    AirTrunk · Document date: Not published · Primary

    https://airtrunk.com/location/tok1-east-tokyo/

Carrier Neutral · True

actual · AirTrunk TOK1 East Tokyo (project)

Claim 38573 · Review: Approved · Claim date: Not published

  1. TOK1 East Tokyo data center

    AirTrunk · Document date: Not published · Primary

    https://airtrunk.com/location/tok1-east-tokyo/

Phase 3 Topped Out · True

actual · AirTrunk TOK1 East Tokyo (project)

Claim 38576 · Review: Approved · Claim date: Not published

  1. TOK1 phase 3 progressing at speed

    AirTrunk · Document date: 2024-08-14 · Primary

    https://airtrunk.com/airtrunk-tok1-phase-3-progressing-at-speed/

Phase 3 Ready For Service Verified · False

actual · AirTrunk TOK1 East Tokyo (project)

Claim 38577 · Review: Approved · Claim date: Not published

  1. TOK1 phase 3 progressing at speed

    AirTrunk · Document date: 2024-08-14 · Primary

    https://airtrunk.com/airtrunk-tok1-phase-3-progressing-at-speed/

New Phase Groundbreaking · 2025-06-19

actual · AirTrunk TOK1 East Tokyo (project)

Claim 38579 · Review: Approved · Claim date: Not published

  1. AirTrunk breaks ground on 40+ MW TOK1 phase

    AirTrunk · Document date: 2025-06-19 · Primary

    https://airtrunk.com/airtrunk-breaks-ground-on-40mw-phase-of-tok1-japans-largest-hyperscale-data-centre-campus/

Current Operating Capacity Disclosed · False

actual · AirTrunk TOK1 East Tokyo (project)

Claim 38581 · Review: Approved · Claim date: Not published

  1. AirTrunk secures JPY191.6 billion green loan for TOK1

    AirTrunk · Document date: 2026-03-10 · Primary

    https://airtrunk.com/airtrunk-secures-largest-financing-for-a-data-centre-in-japan-with-us1-2-billion-green-loan-for-its-flagship-tokyo-campus/
  2. TOK1 East Tokyo data center

    AirTrunk · Document date: Not published · Corroborating

    https://airtrunk.com/location/tok1-east-tokyo/

Financing Amount Jpy · 191.6 JPY billion

reported rounded · AirTrunk TOK1 East Tokyo (project)

Claim 38582 · Review: Approved · Claim date: Not published

  1. AirTrunk secures JPY191.6 billion green loan for TOK1

    AirTrunk · Document date: 2026-03-10 · Primary

    https://airtrunk.com/airtrunk-secures-largest-financing-for-a-data-centre-in-japan-with-us1-2-billion-green-loan-for-its-flagship-tokyo-campus/

Financing Amount Usd · $1.24 billion

reported rounded · AirTrunk TOK1 East Tokyo (project)

Claim 38583 · Review: Approved · Claim date: Not published

  1. AirTrunk secures JPY191.6 billion green loan for TOK1

    AirTrunk · Document date: 2026-03-10 · Primary

    https://airtrunk.com/airtrunk-secures-largest-financing-for-a-data-centre-in-japan-with-us1-2-billion-green-loan-for-its-flagship-tokyo-campus/

Financing Scope · Refinancing existing facilities and development capex for next phases

actual · AirTrunk TOK1 East Tokyo (project)

Claim 38584 · Review: Approved · Claim date: Not published

  1. AirTrunk secures JPY191.6 billion green loan for TOK1

    AirTrunk · Document date: 2026-03-10 · Primary

    https://airtrunk.com/airtrunk-secures-largest-financing-for-a-data-centre-in-japan-with-us1-2-billion-green-loan-for-its-flagship-tokyo-campus/

Financing Applies To Tok2 · False

actual · AirTrunk TOK1 East Tokyo (project)

Claim 38585 · Review: Approved · Claim date: Not published

  1. AirTrunk secures JPY191.6 billion green loan for TOK1

    AirTrunk · Document date: 2026-03-10 · Primary

    https://airtrunk.com/airtrunk-secures-largest-financing-for-a-data-centre-in-japan-with-us1-2-billion-green-loan-for-its-flagship-tokyo-campus/

Phase 3 Customer Named · False

actual · AirTrunk TOK1 East Tokyo (project)

Claim 38586 · Review: Approved · Claim date: Not published

  1. AirTrunk breaks ground on third phase of TOK1

    AirTrunk · Document date: 2023-06-30 · Primary

    https://airtrunk.com/airtrunk-breaks-ground-on-third-phase-of-tok1-tokyo-east/

Counterparties and capital

AirTrunk · Operator · CMP-0656

BNP Paribas · Lender · CMP-1027

Chiba Bank · Lender · CMP-1028

Credit Agricole CIB · Lender · CMP-1025

DBS Bank · Lender · CMP-0663

E.SUN Commercial Bank · Lender · CMP-1029

Mizuho Bank · Lender · CMP-1030

MUFG · Lender · CMP-0665

Natixis CIB · Lender · CMP-1031

OCBC · Lender · CMP-0666

SMBC · Lender · CMP-0667

Societe Generale · Lender · CMP-1026

UOB · Lender · CMP-0668

Green Loan

¥191,600,000,000 · 2026-03-10

TOK1-only refinancing of existing facilities and development capex for next phases. Company equivalent USD1.24 billion.

AirTrunk (Financing Sponsor / Borrower Group; Legal Borrower Undisclosed) · BNP Paribas (Mandated Lead Arranger And Bookrunner) · Chiba Bank (Mandated Lead Arranger And Bookrunner) · Credit Agricole CIB (Global Coordinator And Mandated Lead Arranger/Bookrunner) · DBS Bank (Mandated Lead Arranger And Bookrunner) · E.SUN Commercial Bank (Mandated Lead Arranger And Bookrunner) · Mizuho Bank (Mandated Lead Arranger And Bookrunner) · MUFG (Global Coordinator And Mandated Lead Arranger/Bookrunner) · Natixis CIB (Mandated Lead Arranger And Bookrunner) · OCBC (Mandated Lead Arranger And Bookrunner) · SMBC (Global Coordinator And Mandated Lead Arranger/Bookrunner) · Societe Generale (Global Coordinator And Mandated Lead Arranger/Bookrunner) · UOB (Mandated Lead Arranger And Bookrunner)

Financing record 120; claim-specific source links appear in the exhibit sources where published.

This schedule captures public Cartis research. It is not a title, lien or legal-opinion report. Document page/section locators and claim review timestamps are included only when published; this version has no separate locator or claim-review-time feed. Downloaded snapshots are retained by you; Cartis does not archive them automatically.