AirTrunk TOK1 East Tokyo
PRJ-0415 · Site · Inzai, Chiba Prefecture, Chiba, Japan
Captured 2026-09-06T04:13:40.960Z · Record last updated 2026-08-25
SHA-256: 532ad091b773d51934819fad4aca1ab223bb1a0ffecb9362d300beb6a8ffb65d
Save a diligence baseline
Download the public evidence as it appears now. Compare a previously saved snapshot to see added, removed and changed claims, counterparties, financing and milestones. Files are read in this browser and are not uploaded.
The fingerprint detects file changes; it is not a digital signature or a claim of independently verified authenticity. Keep your downloaded copy with the transaction file.
Scope and capacity
TOK1 is a 300+ MW design campus with more than 60 MW operating at its 2021 opening and substantial later phases under construction. AirTrunk TOK1 East Tokyo is located in Inzai, Chiba Prefecture, 12, JP and is a data center campus in partially operational status.
Headline: 300 MW Planned / design
Numbers refer to their stated physical boundaries and are not added together. Source dates, claim dates and record updates have different meanings. Missing dates and locators are not inferred.
Claims and exhibit sources
Facility Code · TOK1
actual · AirTrunk TOK1 East Tokyo (project)
Claim 38560 · Review: Approved · Claim date: Not published
- AirTrunk opens TOK1 East Tokyo
AirTrunk · Document date: 2021-11-30 · Corroborating
https://airtrunk.com/airtrunk-powers-the-cloud-in-japan-opening-300mw-tokyo-hyperscale-data-centre/ - TOK1 East Tokyo data center
AirTrunk · Document date: Not published · Primary
https://airtrunk.com/location/tok1-east-tokyo/
Campus Location · Inzai, Chiba Prefecture
actual · AirTrunk TOK1 East Tokyo (project)
Claim 38561 · Review: Approved · Claim date: Not published
- AirTrunk opens TOK1 East Tokyo
AirTrunk · Document date: 2021-11-30 · Corroborating
https://airtrunk.com/airtrunk-powers-the-cloud-in-japan-opening-300mw-tokyo-hyperscale-data-centre/ - TOK1 East Tokyo data center
AirTrunk · Document date: Not published · Primary
https://airtrunk.com/location/tok1-east-tokyo/
Total Design Capacity · 300 MW+
Planned / design or future potential · AirTrunk TOK1 East Tokyo (project)
Claim 38562 · Review: Approved · Claim date: Not published
Headline treatment: Selected headline
- AirTrunk breaks ground on 40 MW expansion at Tokyo campus
Data Center Dynamics · Document date: 2025-06-19 · Corroborating
https://www.datacenterdynamics.com/en/news/airtrunk-breaks-ground-on-40mw-expansion-at-tokyo-data-center-campus/ - AirTrunk opens TOK1 East Tokyo
AirTrunk · Document date: 2021-11-30 · Corroborating
https://airtrunk.com/airtrunk-powers-the-cloud-in-japan-opening-300mw-tokyo-hyperscale-data-centre/ - TOK1 East Tokyo data center
AirTrunk · Document date: Not published · Primary
https://airtrunk.com/location/tok1-east-tokyo/
Initial Operating Capacity Minimum · 60 MW+
reported rounded · AirTrunk TOK1 East Tokyo (project)
Claim 38563 · Review: Approved · Claim date: Not published
Headline treatment: Not included in reviewed operating IT capacity
- AirTrunk breaks ground on 40 MW expansion at Tokyo campus
Data Center Dynamics · Document date: 2025-06-19 · Corroborating
https://www.datacenterdynamics.com/en/news/airtrunk-breaks-ground-on-40mw-expansion-at-tokyo-data-center-campus/ - AirTrunk opens TOK1 East Tokyo
AirTrunk · Document date: 2021-11-30 · Primary
https://airtrunk.com/airtrunk-powers-the-cloud-in-japan-opening-300mw-tokyo-hyperscale-data-centre/
Opened Date · 2021-11-30
actual · AirTrunk TOK1 East Tokyo (project)
Claim 38564 · Review: Approved · Claim date: Not published
- AirTrunk opens TOK1 East Tokyo
AirTrunk · Document date: 2021-11-30 · Primary
https://airtrunk.com/airtrunk-powers-the-cloud-in-japan-opening-300mw-tokyo-hyperscale-data-centre/
Campus Land Area · 13.25 hectares
reported rounded · AirTrunk TOK1 East Tokyo (project)
Claim 38565 · Review: Approved · Claim date: Not published
- AirTrunk opens TOK1 East Tokyo
AirTrunk · Document date: 2021-11-30 · Primary
https://airtrunk.com/airtrunk-powers-the-cloud-in-japan-opening-300mw-tokyo-hyperscale-data-centre/
Current Site Area · 13 hectares
reported rounded · AirTrunk TOK1 East Tokyo (project)
Claim 38566 · Review: Approved · Claim date: Not published
- TOK1 East Tokyo data center
AirTrunk · Document date: Not published · Primary
https://airtrunk.com/location/tok1-east-tokyo/
Data Hall Area · 80,000 square meters
reported rounded · AirTrunk TOK1 East Tokyo (project)
Claim 38567 · Review: Approved · Claim date: Not published
- TOK1 East Tokyo data center
AirTrunk · Document date: Not published · Primary
https://airtrunk.com/location/tok1-east-tokyo/
Office Storage Area · 9,600 square meters
reported rounded · AirTrunk TOK1 East Tokyo (project)
Claim 38568 · Review: Approved · Claim date: Not published
- TOK1 East Tokyo data center
AirTrunk · Document date: Not published · Primary
https://airtrunk.com/location/tok1-east-tokyo/
Data Hall Count · 102 data halls
reported rounded · AirTrunk TOK1 East Tokyo (project)
Claim 38569 · Review: Approved · Claim date: Not published
- TOK1 East Tokyo data center
AirTrunk · Document date: Not published · Primary
https://airtrunk.com/location/tok1-east-tokyo/
Planned Building Count · 7
Planned / design or future potential · AirTrunk TOK1 East Tokyo (project)
Claim 38570 · Review: Approved · Claim date: Not published
- AirTrunk opens TOK1 East Tokyo
AirTrunk · Document date: 2021-11-30 · Primary
https://airtrunk.com/airtrunk-powers-the-cloud-in-japan-opening-300mw-tokyo-hyperscale-data-centre/
Grid Voltage · 66 kV
reported rounded · AirTrunk TOK1 East Tokyo (project)
Claim 38571 · Review: Approved · Claim date: Not published
- AirTrunk opens TOK1 East Tokyo
AirTrunk · Document date: 2021-11-30 · Corroborating
https://airtrunk.com/airtrunk-powers-the-cloud-in-japan-opening-300mw-tokyo-hyperscale-data-centre/ - TOK1 East Tokyo data center
AirTrunk · Document date: Not published · Primary
https://airtrunk.com/location/tok1-east-tokyo/
Design Pue · 1.15 PUE
reported rounded · AirTrunk TOK1 East Tokyo (project)
Claim 38572 · Review: Approved · Claim date: Not published
- AirTrunk opens TOK1 East Tokyo
AirTrunk · Document date: 2021-11-30 · Corroborating
https://airtrunk.com/airtrunk-powers-the-cloud-in-japan-opening-300mw-tokyo-hyperscale-data-centre/ - TOK1 East Tokyo data center
AirTrunk · Document date: Not published · Primary
https://airtrunk.com/location/tok1-east-tokyo/
Carrier Neutral · True
actual · AirTrunk TOK1 East Tokyo (project)
Claim 38573 · Review: Approved · Claim date: Not published
- TOK1 East Tokyo data center
AirTrunk · Document date: Not published · Primary
https://airtrunk.com/location/tok1-east-tokyo/
Phase 3 Topped Out · True
actual · AirTrunk TOK1 East Tokyo (project)
Claim 38576 · Review: Approved · Claim date: Not published
- TOK1 phase 3 progressing at speed
AirTrunk · Document date: 2024-08-14 · Primary
https://airtrunk.com/airtrunk-tok1-phase-3-progressing-at-speed/
Phase 3 Ready For Service Verified · False
actual · AirTrunk TOK1 East Tokyo (project)
Claim 38577 · Review: Approved · Claim date: Not published
- TOK1 phase 3 progressing at speed
AirTrunk · Document date: 2024-08-14 · Primary
https://airtrunk.com/airtrunk-tok1-phase-3-progressing-at-speed/
New Phase Groundbreaking · 2025-06-19
actual · AirTrunk TOK1 East Tokyo (project)
Claim 38579 · Review: Approved · Claim date: Not published
- AirTrunk breaks ground on 40+ MW TOK1 phase
AirTrunk · Document date: 2025-06-19 · Primary
https://airtrunk.com/airtrunk-breaks-ground-on-40mw-phase-of-tok1-japans-largest-hyperscale-data-centre-campus/
Current Operating Capacity Disclosed · False
actual · AirTrunk TOK1 East Tokyo (project)
Claim 38581 · Review: Approved · Claim date: Not published
- AirTrunk secures JPY191.6 billion green loan for TOK1
AirTrunk · Document date: 2026-03-10 · Primary
https://airtrunk.com/airtrunk-secures-largest-financing-for-a-data-centre-in-japan-with-us1-2-billion-green-loan-for-its-flagship-tokyo-campus/ - TOK1 East Tokyo data center
AirTrunk · Document date: Not published · Corroborating
https://airtrunk.com/location/tok1-east-tokyo/
Financing Amount Jpy · 191.6 JPY billion
reported rounded · AirTrunk TOK1 East Tokyo (project)
Claim 38582 · Review: Approved · Claim date: Not published
- AirTrunk secures JPY191.6 billion green loan for TOK1
AirTrunk · Document date: 2026-03-10 · Primary
https://airtrunk.com/airtrunk-secures-largest-financing-for-a-data-centre-in-japan-with-us1-2-billion-green-loan-for-its-flagship-tokyo-campus/
Financing Amount Usd · $1.24 billion
reported rounded · AirTrunk TOK1 East Tokyo (project)
Claim 38583 · Review: Approved · Claim date: Not published
- AirTrunk secures JPY191.6 billion green loan for TOK1
AirTrunk · Document date: 2026-03-10 · Primary
https://airtrunk.com/airtrunk-secures-largest-financing-for-a-data-centre-in-japan-with-us1-2-billion-green-loan-for-its-flagship-tokyo-campus/
Financing Scope · Refinancing existing facilities and development capex for next phases
actual · AirTrunk TOK1 East Tokyo (project)
Claim 38584 · Review: Approved · Claim date: Not published
- AirTrunk secures JPY191.6 billion green loan for TOK1
AirTrunk · Document date: 2026-03-10 · Primary
https://airtrunk.com/airtrunk-secures-largest-financing-for-a-data-centre-in-japan-with-us1-2-billion-green-loan-for-its-flagship-tokyo-campus/
Financing Applies To Tok2 · False
actual · AirTrunk TOK1 East Tokyo (project)
Claim 38585 · Review: Approved · Claim date: Not published
- AirTrunk secures JPY191.6 billion green loan for TOK1
AirTrunk · Document date: 2026-03-10 · Primary
https://airtrunk.com/airtrunk-secures-largest-financing-for-a-data-centre-in-japan-with-us1-2-billion-green-loan-for-its-flagship-tokyo-campus/
Phase 3 Customer Named · False
actual · AirTrunk TOK1 East Tokyo (project)
Claim 38586 · Review: Approved · Claim date: Not published
- AirTrunk breaks ground on third phase of TOK1
AirTrunk · Document date: 2023-06-30 · Primary
https://airtrunk.com/airtrunk-breaks-ground-on-third-phase-of-tok1-tokyo-east/
Counterparties and capital
AirTrunk · Operator · CMP-0656
BNP Paribas · Lender · CMP-1027
Chiba Bank · Lender · CMP-1028
Credit Agricole CIB · Lender · CMP-1025
DBS Bank · Lender · CMP-0663
E.SUN Commercial Bank · Lender · CMP-1029
Mizuho Bank · Lender · CMP-1030
MUFG · Lender · CMP-0665
Natixis CIB · Lender · CMP-1031
OCBC · Lender · CMP-0666
SMBC · Lender · CMP-0667
Societe Generale · Lender · CMP-1026
UOB · Lender · CMP-0668
¥191,600,000,000 · 2026-03-10
TOK1-only refinancing of existing facilities and development capex for next phases. Company equivalent USD1.24 billion.
AirTrunk (Financing Sponsor / Borrower Group; Legal Borrower Undisclosed) · BNP Paribas (Mandated Lead Arranger And Bookrunner) · Chiba Bank (Mandated Lead Arranger And Bookrunner) · Credit Agricole CIB (Global Coordinator And Mandated Lead Arranger/Bookrunner) · DBS Bank (Mandated Lead Arranger And Bookrunner) · E.SUN Commercial Bank (Mandated Lead Arranger And Bookrunner) · Mizuho Bank (Mandated Lead Arranger And Bookrunner) · MUFG (Global Coordinator And Mandated Lead Arranger/Bookrunner) · Natixis CIB (Mandated Lead Arranger And Bookrunner) · OCBC (Mandated Lead Arranger And Bookrunner) · SMBC (Global Coordinator And Mandated Lead Arranger/Bookrunner) · Societe Generale (Global Coordinator And Mandated Lead Arranger/Bookrunner) · UOB (Mandated Lead Arranger And Bookrunner)
Financing record 120; claim-specific source links appear in the exhibit sources where published.
This schedule captures public Cartis research. It is not a title, lien or legal-opinion report. Document page/section locators and claim review timestamps are included only when published; this version has no separate locator or claim-review-time feed. Downloaded snapshots are retained by you; Cartis does not archive them automatically.