AirTrunk TOK1 East Tokyo
About AirTrunk TOK1 East Tokyo
TOK1 is a 300+ MW design campus with more than 60 MW operating at its 2021 opening and substantial later phases under construction. AirTrunk TOK1 East Tokyo is located in Inzai, Chiba Prefecture, 12, JP and is a data center campus in partially operational status. Participants include AirTrunk as operator. Published specifications include 50 MW of stated capacity. Development comprises TOK1 initial operating phases (operating), TOK1 phase 3 (construction), TOK1 subsequent phases (construction). Key milestones include TOK1 subsequent phase breaks ground (2025-06-19) and AirTrunk announces TOK1 green loan (2026-03-10). electricity supply — 66 kV: Dual/onsite high-voltage supply and substations reported for the campus; exact current energized MW is undisclosed. Capital records include green loan of 191.6 JPY billion for TOK1-only refinancing of existing facilities and development capex for next phases. Company equivalent USD1.24 billion.
Program relationships
1 linkedCapacity
Operating critical ITDevelopment
3 phases · 5 milestonesHistorical operating minimum at November 2021 opening; not a current full-campus total.
Announced as 55+ MW and later described as 50 MW; figures conflict.
1 building
Includes a 40+ MW phase announced in June 2025; scopes may overlap and are not additive.
Infrastructure
66 kV
Dual/onsite high-voltage supply and substations reported for the campus; exact current energized MW is undisclosed.
Project map
0 of 1 project point mappedNo map point available
Facts & sources
Published claims and their source links.