Skip to content

AirTrunk HYD1 Campus

Hyderabad, Telangana, IndiaProposed
Evidence
Planned / design
243 MW
Updated
Oct 29, 2026

AirTrunk markets HYD1 in Chandanvelly, Hyderabad, with more than 243 MW of total campus capacity; the specification does not explicitly define this as IT load or establish commissioned capacity. The site forms part of its Indian platform following the Lumina acquisition. Operator specifications list 13.3 hectares, a 440/220 kV substation and carrier-neutral connectivity with multiple entry paths. Its Chinese-language page lists 179,000 m² of building area as a design figure, not measured completed space. Cross-language reconciliation remains unresolved; substation commissioning and named carriers are not established.

Capacity

Planned campus capacity MW

Planned / design or future potential

243 MW

Source

Operating IT capacity: Not established in published records

A missing figure does not mean zero. Planned, utility and generation figures are not operating IT capacity.

Development

Milestones (1)
AirTrunk announced Lumina acquisition; platform-level ownership milestone, not campus opening.

Apr 20, 2026 · Recorded actual event

Completed · Announced

Sources (1)

Participants

AirTrunk

Developer · Operator

Sources by role
Developer / Operator (1)

Site & development

Site location

Reported rounded

Operator designated HYD1 campus in Chandanvelly, Hyderabad, Telangana, 13.3 ha. Lumina acquisition/branding is not a separate project. Exact plot not disclosed in reviewed page.

Source

Land and site control context

Reported rounded

13.3 Ha per operator.

Source

Reviewed hyd1 locale area context

Reported rounded

AirTrunk’s Chinese language HYD1 specification lists 179,000 m² of building area. This is an operator published design figure, not measured completed floor area; cross language reconciliation remains unresolved.

Source

Additional project facts

Design PUE upper bound

Forecast

Operator specifies design PUE below 1.4; not measured operating PUE.

Source

Infrastructure & permits

Technical details (2)
Utility service

Reported context

440/220 kV substation specification; commissioned condition not stated.

Fiber

Reported context

Carrier-neutral with multiple entry paths per operator; named carriers not established.

Public-source research. Plans may change. See Evidence for sources and qualifications.

Related projects (2)
Iron Mountain HYD-1 Hyderabad Data Center

Operating · Hyderabad, Telangana, India

Same locality: Hyderabad

Compare in a collection
Microsoft India South Central Cloud Region

Status under review · Hyderabad, Telangana, India

Same locality: Hyderabad

Compare in a collection