Cartis diligence evidence schedule

AEP Piketon Area Transmission Improvements

PRJ-0369 · Program · Piketon, Ohio, United States

Captured 2026-09-06T04:13:41.044Z · Record last updated 2026-08-25

SHA-256: b82bcf106618b12e00e112969967cd22125690431008242542b9af1cd6b8564b

Save a diligence baseline

Download the public evidence as it appears now. Compare a previously saved snapshot to see added, removed and changed claims, counterparties, financing and milestones. Files are read in this browser and are not uploaded.

The fingerprint detects file changes; it is not a digital signature or a claim of independently verified authenticity. Keep your downloaded copy with the transaction file.

Scope and capacity

AEP Ohio transmission program for PORTS: Baku substation, Baku-Gavin 765 kV line and related substations; not generation or campus capacity. AEP Piketon Area Transmission Improvements is located in Piketon, OH, US and is a program in preconstruction status.

Headline:

Numbers refer to their stated physical boundaries and are not added together. Source dates, claim dates and record updates have different meanings. Missing dates and locators are not inferred.

Claims and exhibit sources

Planned Transmission Investment · $4.20 billion

Planned / design or future potential · AEP Piketon Area Transmission Improvements (project)

Claim 33814 · Review: Approved · Claim date: Not published

  1. Energy Department announces partnership to ensure affordable energy and power America's AI

    U.S. Department of Energy · Document date: 2026-03-20 · Primary

    https://www.energy.gov/articles/energy-department-announces-partnership-ensure-affordable-energy-and-power-americas-ai
  2. AEP Ohio and SB Energy announce infrastructure plans for PORTS Technology Campus

    American Electric Power · Document date: 2026-03-20 · Corroborating

    https://www.aep.com/news/stories/view/10823/

Planned Voltage · 765 kV

Planned / design or future potential · AEP Piketon Area Transmission Improvements (project)

Claim 33815 · Review: Approved · Claim date: Not published

  1. Piketon Area Improvements Project

    AEP Transmission · Document date: 2026-07-01 · Corroborating

    https://www.aeptransmission.com/ohio/PiketonArea/
  2. Fact sheet: ensuring affordable energy access in Ohio while powering the future

    U.S. Department of Energy · Document date: 2026-03-20 · Primary

    https://www.energy.gov/articles/fact-sheet-department-energy-ensuring-affordable-energy-access-ohio-while-powering-future
  3. AEP Ohio and SB Energy announce infrastructure plans for PORTS Technology Campus

    American Electric Power · Document date: 2026-03-20 · Corroborating

    https://www.aep.com/news/stories/view/10823/

Planned Substation Count · 4 substations

Planned / design or future potential · AEP Piketon Area Transmission Improvements (project)

Claim 33816 · Review: Approved · Claim date: Not published

  1. Fact sheet: ensuring affordable energy access in Ohio while powering the future

    U.S. Department of Energy · Document date: 2026-03-20 · Primary

    https://www.energy.gov/articles/fact-sheet-department-energy-ensuring-affordable-energy-access-ohio-while-powering-future

Planned Baku Gavin Line Length Approximately · 50 miles

Planned / design or future potential · AEP Piketon Area Transmission Improvements (project)

Claim 33817 · Review: Approved · Claim date: Not published

  1. Piketon Area Improvements Project

    AEP Transmission · Document date: 2026-07-01 · Primary

    https://www.aeptransmission.com/ohio/PiketonArea/

Planned Power Availability Year · 2029

Planned / design or future potential · AEP Piketon Area Transmission Improvements (project)

Claim 33818 · Review: Approved · Claim date: Not published

  1. AEP Ohio and SB Energy announce infrastructure plans for PORTS Technology Campus

    American Electric Power · Document date: 2026-03-20 · Primary

    https://www.aep.com/news/stories/view/10823/

Opsb Case Reference · 26-0426-EL-BTX

actual · AEP Piketon Area Transmission Improvements (project)

Claim 33819 · Review: Approved · Claim date: Not published

  1. Piketon Area Improvements Project

    AEP Transmission · Document date: 2026-07-01 · Primary

    https://www.aeptransmission.com/ohio/PiketonArea/

Counterparties and capital

AEP Ohio · Utility Provider · CMP-0910

SB Energy · Customer · CMP-0908

Customer Funded Transmission Program

$4,200,000,000 · 2026-03-20

SB Energy commitment for AEP transmission supporting PORTS; approvals pending.

AEP Ohio (Transmission Developer) · SB Energy (Funding Counterparty)

Financing record 99; claim-specific source links appear in the exhibit sources where published.

This schedule captures public Cartis research. It is not a title, lien or legal-opinion report. Document page/section locators and claim review timestamps are included only when published; this version has no separate locator or claim-review-time feed. Downloaded snapshots are retained by you; Cartis does not archive them automatically.