AEP Piketon Area Transmission Improvements

Piketon, Ohio, United StatesStatus Under Review
Capacity
See sites
0 constituent sites
Lead participant
SB Energy
Customer
Last updated
Aug 25, 2026
Most recent public record update

About AEP Piketon Area Transmission Improvements

AEP Ohio transmission program for PORTS: Baku substation, Baku-Gavin 765 kV line and related substations; not generation or campus capacity. AEP Piketon Area Transmission Improvements is located in Piketon, OH, US and is a program in preconstruction status. Participants include AEP Ohio as utility, SB Energy as customer. Development comprises Baku substation and Baku-Gavin line (preconstruction). Key milestones include AEP prepares Piketon-area transmission filing (2026-07-01) and AEP expects power availability for PORTS in 2029 (2029-01-01). extra high voltage transmission — 765 kV: Baku substation, Baku-Gavin line and related facilities; approvals pending. Permitting includes OPSB transmission siting application for Baku-Gavin 765 kV line (planned / pending). Capital records include customer-funded transmission program of 4.2 USD billion for SB Energy commitment for AEP transmission supporting PORTS; approvals pending.

Projects sharing a market, utility, or organization.

3 related

Capacity

Operating capacityAn operating IT-capacity figure has not been publicly disclosed.

No additional capacity claims are published.

Development

1 phases · 2 milestones
Baku substation and Baku-Gavin lineAnnounced Or Preconstruction

Includes roughly 50 miles of 765 kV transmission.

Jul 1, 2026
AEP prepares Piketon-area transmission filing
Forecast
Jan 1, 2029
AEP expects power availability for PORTS in 2029
Forecast

Infrastructure

Electric GridPlanned Or Represented

765 kV

Baku substation, Baku-Gavin line and related facilities; approvals pending.

Constituent-site map

0 of 0 constituent sites mapped
Child-site facts
0
Mapped child sites
0
Capacity figures
0

No map point available

Facts & sources

Published claims and their source links.

6 facts
Planned Transmission Investment
$4.20 billion
Actual
Planned Voltage
765 kV
Actual
Planned Substation Count
4 substations
Actual
Planned Baku Gavin Line Length Approximately
50 miles
Actual
Planned Power Availability Year
2029
Actual
Opsb Case Reference
26-0426-EL-BTX
Actual