Partially operational · Las Vegas, Nevada, United States
- Capacity
- 495 MW
- Planned critical IT
- Verified
- Aug 28, 2026
A view-only collection of public Cartis project and company profiles.
This link contains public record references only. It does not reveal the creator’s browser history, review status, private notes, or unpublished Cartis data. Open each profile for its source and verification details.
Stable public fields are aligned side by side. Programs never inherit or sum child-site operating capacity.
| Comparable field | Switch Las Vegas Core Campus | DataBank LAS1 Las Vegas Data Center |
|---|---|---|
| Record type | Site | Site |
| Status | Partially operational | Operating / Stabilized |
| Location | Las Vegas, Nevada, United States | Las Vegas, Nevada, United States |
| Headline capacity | 495 MW · Planned critical IT | No reviewed public value |
| Reviewed operating MW | No reviewed public value | No reviewed public value |
| Owner / developer | Switch | DataBank |
| Utility | No reviewed public value | No reviewed public value |
| ISO / RTO | No reviewed public value | No reviewed public value |
| Reviewed facts | 0 public facts | 0 public facts |
| Latest verification | Aug 28, 2026 | Sep 2, 2026 |
Shaded rows differ across the selected records. Blank values remain blank; Cartis does not infer or substitute missing public data.
Partially operational · Las Vegas, Nevada, United States
Operating / Stabilized · Las Vegas, Nevada, United States
Save public profiles to a device watchlist, then create a separate view-only link.